Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ah_dun

This Is All I'm Waiting For...

Recommended Posts

3rd day, ID told me today all debris will be remove. Sand, cement, tiles will be thr.

IMG_0057.jpg

When I was there ard 11am half of the debris had been removed.

IMG_0058.jpg

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

4th Day, knock off at 8am. Went over to have a look and verify what he told me.

3 bedroom door frame removed.

IMG_0059.jpg

IMG_0060.jpg

Common bathroom tiles

IMG_0061.jpg

Cement screed look alike tiles for my dining area

IMG_0062.jpg

 

Share this post


Link to post
Share on other sites

This today will start flooring work. Around 5pm will go over to see how is the progress.

IMG_0063.jpg

IMG_0064.jpg

Ugly common toilet

IMG_0065.jpg

 

Share this post


Link to post
Share on other sites

Received my house renovation work schedule from ID. Only 21st of June they can complete my house reno and hand over my house to me. OMG... work start on 26th Apr and only finish on 21st June. It take about 2 months for my house renovation. Anyway 1st wk had 2 day never work so I think this is the reason why need to take so long to complete my house renovation. Sigh...

 

Share this post


Link to post
Share on other sites

Dont worry. Slow works will come out good result. Think on the bright side! ;)

If you are not hurrying to move in, I think giving the IDs more times are good in order to get the things done right.

Anyway, glad to see all the UGLY stuff being hacked off and removed! HOORAY!!!!!

 

Share this post


Link to post
Share on other sites

Entrance and area for changing shoe.

IMG_0092.jpg

Straighten door frame up and sealed up top portion.

IMG_0090.jpg

IMG_0091.jpg

Small storeroom, cabinet and laundry area base built.

IMG_0088.jpg

Resort feel common bathroom.

IMG_0089.jpg

 

Share this post


Link to post
Share on other sites

Modern feel MBR bathroom. Empty area will fill up with green color mosaic.

IMG_0086.jpg

IMG_0087.jpg

Tt's all for this week... Coming week will have more thing done. Adjustable louver, windows etc. Yesterday just bought our hob and hood at Woodland Civil Centre SP. We also decided to change electric storage heater to gas heater.

 

Share this post


Link to post
Share on other sites

Thanks! Here are some photos I took this afternoon.

New casement window at 2nd bedroom

IMG_0103.jpg

New casement window for MBR

IMG_0102.jpg

Window grilles

IMG_0100.jpg

IMG_0101.jpg

For this I had complaint to my ID. Why they just put the window grilles like that without any proper protection.

I'll not accept it if there is any scratches. He told me they'll touch up on it but I asked him to stand on a customer view. Would u buy a car from a sales person and he scratches ur car and told u that he'll touch up for ur car? Den he said he'll change new set for me if I can't accept it.

Uneven and slanted mosaic

IMG_0099.jpg

This I also complain to him and he'll go to check on it.

wah nice nice!!!! waiting for more photos post up! :)
 

Share this post


Link to post
Share on other sites

Mosaic for toilet is very common now. I oso mix my MBR toilet as white wall black floor. LOL... Common toilet oso not bad. Really feel like resort or those outdoor bathroom.

Nice selection on the mosaic tiles on toilet. Very special and unique. Usually people using black mix with white....lol...
 

Share this post


Link to post
Share on other sites

Thank u so much lei... Ah Seng~! ur house 3D oso look very nice... =)

Yo Lover & Elmo,

Joy here. Nice MBR bathroom.. Like the clean white look. :good:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×