Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Clementi_PR

Clementi 3 Rm Renovation

Recommended Posts

Looking for good contractors? Click here for your request
hmm, drilling for wiring? thats like a super long drill bit. :) looks like yours would be done pretty soon...

Yes, now they start to do the electrical work.

Not so soon, the kitchen cabinet still not started.

Jasper already do the measurement,

but the design seem a bit ackward.

The width of each door is different :(

Still waiting for the updated design.

Will keep updating the blog daily :P

 

Share this post


Link to post
Share on other sites

Day 20

Went out looking for sofa, dining table, tv consel, wardrobe, etc.

But only can get sofa, dining table and wardrobe plus a matress bed.

Don't have time to go to my house.

So, no picture for today :(

 

Share this post


Link to post
Share on other sites
Where did you get your sofa from?

Finnaly we bought it at Harvey Norman,

as we found the nice dining table there.

And we got persuaded to get the matress and a wardrobe over there too :P

 

Share this post


Link to post
Share on other sites
Yes, now they start to do the electrical work.

Not so soon, the kitchen cabinet still not started.

Jasper already do the measurement,

but the design seem a bit ackward.

The width of each door is different :(

Still waiting for the updated design.

Will keep updating the blog daily :P

Jasper told me that the kitchen will be a little bit late.

Scheduled to be done on 20th but now can only be done around 22th :(

 

Share this post


Link to post
Share on other sites

wow the bathroom door abit translucent,...hhaha...

dun worry abt the bi fold door, installation can be done in a few hours at most. :)

ur reno very fast already loh... :)

Edited by gimz63251073
 

Share this post


Link to post
Share on other sites
wow the bathroom door abit translucent,...hhaha...

dun worry abt the bi fold door, installation can be done in a few hours at most. :)

ur reno very fast already loh... :)

Not really translucent enough to get a glimpse of the person inside :P

Installation might be a matter of hours,

but today, they did not bring the master bathroom door yet :(

Maybe it is fast for you, but i really feels that they could do it even faster actually.

Cos they often work half day only.

I hope they will not miss the deadline :)

 

Share this post


Link to post
Share on other sites

Day 23

Some of the lighting already installed

Day23A.jpg

Day23C.jpg

MCB half installed

Day23B.jpg

Tomorrow schedule is to install toilet bowl and bathroom accesories and finisihing the electrical work.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×