Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Clementi_PR

Clementi 3 Rm Renovation

Recommended Posts

It must be near the stadium then? Heh.

It is ethical to get your own electrician because ultimately the contractor knows you're going for the best price. It'ld be good to have a contractor that can work with your electrician. My electrician did all electrical works after the wet works before carpentry went up. Coordination was done by the site manager in charge of my reno, so I didn't actually have to tell my electrician when to come. I hope you'll have a pleasant reno journey.

Halo bigeyefish,

Yes it is, it's in 70X :P

Thanks for your support.

Edited by Clementi_PR
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Halo All,

Yesterday signed my contract.

Finger cross :P

Got more discount although not as i wanted.

I saw the unit they just finished on Sat.

Their workmanship quite good,

the owner of the house give a good feedback,

he said the work on schedule,

small problem occurred but quickly fix.

I hope to get a better service and result for my place.

Wish me luck :)

 

Share this post


Link to post
Share on other sites

Thanks a lot guys.

Pictures will be uploaded only after mid march.

Maybe i will update on the layout design, hopefully the 3rd week or around end of month.

Now i got to apply the reno loan with bank :P

I have told the id that i will blog the process in RT.

He said no problem.

Hope he is really sincere and do the best for my unit :good:

 

Share this post


Link to post
Share on other sites
Thanks a lot guys.

Pictures will be uploaded only after mid march.

Maybe i will update on the layout design, hopefully the 3rd week or around end of month.

Now i got to apply the reno loan with bank :P

I have told the id that i will blog the process in RT.

He said no problem.

Hope he is really sincere and do the best for my unit :good:

Hi Clementi_PR,

May I know who is the ID quoted you?

Thanks.

Eric

 

Share this post


Link to post
Share on other sites

Halo All,

This weekend will choose and buy tile and toilet accessory in Tat Hong Industrial Building.

Anyone ever bought from that area?

Is the price competitive?

TIA

 

Share this post


Link to post
Share on other sites
Halo All,

This weekend will choose and buy tile and toilet accessory in Tat Hong Industrial Building.

Anyone ever bought from that area?

Is the price competitive?

TIA

I have not heard of this building before. Any shop names to provide?

 

Share this post


Link to post
Share on other sites
I have not heard of this building before. Any shop names to provide?

I just heard something like T tiles shop (for tiles)

for bathroom accessories and lighting he did not mention any shop name.

As far as you know, is the building have a lot shop?

TIA

 

Share this post


Link to post
Share on other sites

Halo All,

Just come back after buying bathroom accessories.

IMG_0931.jpg

IMG_0932.jpg

Both for S$400.

Other accessories got 20% discount.

Last week bought home appliances.

Last 2 week chose the tiles for living room, kitchen and bathroom.

Tiles.jpg

Tiles-1.jpg

Next week will start hacking.

Wish me luck :P

Edited by Clementi_PR
 

Share this post


Link to post
Share on other sites

CMIIW: So far i never seen a schedule for renovation in renotalk.

Which i think should be there for a project.

Anyway, this is the schedule from Jasper for my reno:

22 Mar - 24 Mar - Hacking

25 Mar - 8 Apr Wet Work

9 Apr - Acid Wash

10 Apr - Plumbing, Measure carpentry, bi-fold, bedroom door, toilet louver

12 Apr - Plumbing, Electrical Work

13 Apr - Plumbing, Ceiling Work

12 Apr - Electrical Work

15 Apr - 17 Apr - Painting Work

19 Apr - 20 Apr Installation of Carpentry

21 Apr - Measure solid surface

22 Apr - Install bi-fold, bedroom door

24 Apr - Install solid surface

26 Apr - General cleaning

27 Apr - 28 Apr - Touch up work

I hope the work will be execute according to schedule.

I have to move out by the end of Apr no matter what.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×