velv 0 Report post Posted May 24, 2010 (edited) ~ * Space Planning for the Kitchen & Living Area Edited May 24, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 24, 2010 (edited) Something to Share Edited June 5, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 25, 2010 (edited) Day 4 - 25 May 2010 Laying cement screed to MBR, 2 common bedrooms, studyroom Plastering of the foyer pillar @ living area and studyroom Total cost for day work : 200 Accumulated labor cost : 800 Total cost for raw material : 993.79 Total reno bill as of now :1793.79 + Hacking = S$4443.79 Edited May 25, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 25, 2010 (edited) Edited May 25, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 25, 2010 (edited) Edited May 25, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 25, 2010 (edited) Day 4 - 25 May 2010 ~ * Space Planning for Kitchen Part 2 & MBR Finalize on the layout of kitchen Ossify scale up the items that we bought and MBR had some space constraint due to the wash basin. He suggested to go for a semi circle design to maximize space . We will look into this with Poh Joo tomorrow. This is our tv console area. Edited May 25, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 25, 2010 some flashback of our reno research in Jan 2010 ! Share this post Link to post Share on other sites
velv 0 Report post Posted May 26, 2010 Day 5 - 26 May 2010 Laying cement screed to living Room, 1 common bedrooms Total cost for day work : 200 Accumulated labor cost : 1000 Total cost for raw material : 993.79 Total reno bill as of now :1993.79 + Hacking = S$4643.79 Can't enter since the cement are still wet. Share this post Link to post Share on other sites
velv 0 Report post Posted May 28, 2010 Day 6 - 27 May 2010 Sand re-stock, Living Room wall & misc prep & plastering etc Total cost for day work : 200 Accumulated labor cost : 1200 Total cost for raw material : 993.79 Total reno bill as of now :2193.79 + Hacking = S$4843.79 Share this post Link to post Share on other sites
velv 0 Report post Posted May 28, 2010 (edited) Reno References Edited May 29, 2010 by velv Share this post Link to post Share on other sites
velv 0 Report post Posted May 29, 2010 (edited) went to change our MBR wash basin as the previous will cause space constraint in the bathroom & thus is unsuitable , made further purchase for 2 piece of furnish today from a teak-wood furniture sale that will end next week . one of which is a coffee table. MBR Wash-Basin : 510 x 380 x 190mm - SGD90.00 http://d-bodhi.com/product.php?c=1&p=6 TV Console bought from d-Bodhi Singapore SGD715 measurement : 160 x 40 x 45cm Coffee Table bought from d-Bodhi Singapore SGD375 measurement : 80 x 80 x 35cm was considering the following but ..almost cough out blood when I found out the price...sigh... so anyway just to share Exell Coffee Table $4768.00 ( Before Discount & GST ) Frame: Chromed Top: Black Pearl Glass Size: 120 x 120cm Nett Price $3635.00 per piece Edited May 29, 2010 by velv Share this post Link to post Share on other sites