Hacking 12 May - 19 May 2010

1. Living Room Floor - Done * photos added

2. All built-in furnishes - Done * photos added

3. MBR Floor Tiles - Done * photos added

4. Balcony Floor & Wall Tiles - Done * photos added

5. Study Room Floor Tiles - Done * photos added

6. Clearing of Debris - Done * photos added

Aftermaths :

Foyer had nails had been trim off, now another contractor will had to conceal & plaster the wall. Floor Hacking not done to concrete level, this might cause hollow issues to tiles in future so did some work on the floors

Purchase of Tiles & Materials 17 May 2010

1. 63 sqft pebblewash + 30x60 wood ceramic tiles

2. 412 sqft White homogeneous tiles for storeroom, living / dining area

Additional for Item 2. - 2 Pack White Grouth Powder

3. 651 sqft Dark Brown homogeneous tiles for study & all bedrooms

4. 119 sqft Black homogeneous tiles for kitchen

5. 105 sqft Black homogeneous tiles for toilets

Additional for Item 3,4,5 - 2 Packs Black Grouth Powder

6. 53 sqft Sand stone-tiles for Balcony

Additional for Item 6 - 1 Pack Yellow Grouth Powder

7. 25 sqft of tiles for Bathtub Installation

8. 13 Cartons of Stone Tiles for Balcony and Living Room Wall

Delivery for the above : 3 working days

Arrival & Transport of Tiles & Materials to site 29 May - 30 May 2010

Remaining Work Schedule

2. Waterproofing

3. Misc Plastering

4. Constructing conceal to toilet floor as bathtub outlet piping for MBR

Wet works schedule : 31 May 2010 - Present

Living Room : 3/5 completed

bedrooms : 4/6 completed

studyroom : 2/3 completed

balcony : 1/4 completed

kitchen : tba

bathrooms : tba

Grouting for all : tba

Skirting for all : tba

Waterproofing of 2 toilets & 1 balcony: 06 Jun 2010

Window Installation : 01 Jun 2010 - Present *uh oh sub con went mia mode*

To supply & install Aluminium (coated white frame) casement windows c/w Green tinted glass x 6 to Kitchen, Living Room, 2 x Common Bedroom, Master Bedroom & Study Room

To supply & install 1 x Aluminium (coated white frame) 04-panels Bi-fold foor c/w Green tinted glass for the Balcony

1. Paying factory a visit *done

Tips : Do not close casement windows by the handle, the action itself will exert pressure to the frames , thus loosen the frames in future, also by forceful pulling the handle too often will shorten its durability

Recommended method is to close by holding on to the bottom of the window.

Delivery of Toilet & Bathtub Items from Poh Joo: 09 Jun Morning

*uh oh looks like the items will be stored till next week *

Installation of TV electricity cable & Dismantle of ceiling fan for painting : 10 Jun Morning

Purchase of extra tiles from Hafary: 14 Jun Morning

Delivery extra tiles from Hafary: 17 Jun Morning

Plumbing Quote :SGD600+

Contractor Installation of :

1. 02 no of toilet bowls

2. 01 no of Longbath

3. 02 no of Shower Mixer set

4. 01 no of mixer with shower head set at mbr

5. 02 no of Wash Basin and Tap

6. 02 no of piping for tap - spray hose

Electrician - SGD850

Description Qty Remarks

Installation of tv point x 1 @ living Room

Installation of 13amp double power point x 1 @ living Room beside TV Point

Installation of heater point x 1 2nd heater point outside MBR (to extend heater point from MBR to outside)

Installation of ceiling fan x 5 (Livingroom, bedrooms)

Changing Lights x 4 (Kitchen, Studyroom, MBR Toilet, Common Toilet)

Changing downlights x 12

Replace of existing to new switches faces/sockets casings:

16AX/20A 1 Gang Switch x 7

16AX/20A 2 Gang Switch x 2

16AX/20A 3 Gang Switch x 4

350VA 50HZ 1 Gang Dimmer Switch x 2

20A Heater switch x 1

13A double switch socket x 10

13A single switch socket x 9

Designate location for Open Net New Gen Fiber Installation @ end of 2010

Acid Wash for Existing Wall Tiles Jun 2010

Kitchen, Toilets wall tiles.

usa.gifFamily Oversea Vacation : 10 Jun midnight flight - 16 Jun ETA SIN 5:00PM

Trip to Rustica & Ikea Kitchen Cabinet purchase : 17 Jun 2010

Air Con Installation booked : 19 Jun 2010

Ikea Kitchen Cabinet Installation: 21 Jun 2010

MBR Built In Wardrobe Installation: 26 Jun 2010

Living Room Sofa Delivery: 27 Jun 2010

Ceiling Fans, Living Room Lights Installation : 26 Jun 2010

Others

Living & Dining Furnishes - Ikea, Rustica, Audio House

Bedrooms - Closet Design, Serta & Ikea

Bathroom Items - Poh Joo & Ikea

Kitchen Cabinets, Wash sinks- Ikea

Toilet Doors - Still Thinking

Lights & Switches - Budgeting

Florist & Deco - Can Wait

Measurements Taken

1. WC - 5.5" required

2. MBR Bathtub Allowance - 1690 x 900 x -

2. Fridge Area - Length 69cm

3. Kitchen Measurement - Window Off Side 368cm Length

4. Kitchen Measurement - Window Side 260cm Length

5. Kitchen Measurement - Window Side Bottom Cabinet 85cm Height

cup.gif Floor Plan ~ *

32268_398238047331_658877331_4059250_444

32268_398233787331_658877331_4059223_794

Edited by velv
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

*New updated Feb 20 Sat*

We had drafted a list of to-do base on one of the template in here =). Wondering whether installing of windows is also part of the contractor quote or the window supplier?

S/N Description

SGD

A By Default Services

1 Space Planning & Furnishing Layout Proposal

2 Professional design & concept consultation

3 Detail Perspective/ Construction Drawings

4 Hassle-free Projext Management, Site Supervision, Coordiation & Rectification

5 Arrange and coordinate Gas Works with PUB

6 Arrange and coordinate Air Conditional installation and work with 3rd party provider

7 Arrange and coordinate for Electrical Wiring and work with 3rd party provider

8 3 Years Warranty on tiles, 1 Year Warranty on Cabinet. With Guaranteed After Sales Service

B General Mandatory

2 Demolish Works

2.1 Supply labour to hack existing living room floor tiles

2.2 Supply labour to hack existing MBR and common bedrooms floor tiles

2.3 Supply labour to hack existing MBR toilet wall and floor tiles

2.4 Supply labour to hack existing common toilet wall tiles only

2.5 Supply labour to hack existing Kitchen floor tiles

2.6 Supply labour to hack existing Kitchen wall tiles

2.7 Supply labour to hack existing living room exisiting foyer design. (front only)

2.8 Supply labour to hack existing balcony floor and wall tiles

3 Mandatory After-Demolish Works

3.1 Sand and Haulage Fee (transportation + delivery etc)

3.2 Debris fee (Clearance of rubbish and left over materials etc)

3.3 Acid cleaning / Chemical wash + General Washing till it is move/stay in condition

3.4 Laying of floor protection

3.5 Provision labour to install accessories etc

C Dismantle Works

1 Supply labour to dismantle existing MBR and common bathrooms' doors

2 Supply labour to dismantle existing MBR and common bathrooms' fitting & accessories

5 Supply labour to dismantle existing MBR Buit-in Wardrobe + dressing

3 Supply labour to dismantle existing balcony's window grills

4 Supply labour to dismantle existing Kitchen fitting cabinets & accessories

6 Supply labour to dismantle existing Buit-in TV Console (living room)

D General Wet Works

1 Supply labour & material to construct 50mm thickness cement base for

1.1 - (Kitchen) L-shaped base for fridge, cabinet, washing basin cabinet

1.2 - (Yard ) Base for Washing Machine Only

1.3 - (MBR) Toilet cabinet base below the vanity top

2 Supply labour & material to construct kerb for :-

2.1 Supply labour & material to construct 1x50mm shower kerb with tiles to separate wet and dry area in common toilet

2.2 Supply labour & material to construct 1x50mm shower kerb with tiles to separate wet and dry area in MBR toilet

2.3 Supply labour & material to construct kerb at main door entrance with tiles to separate outdoor and indoor to prevent dust and water.

2.4 Supply labour & material to construct kerb at kitchen entrance with tiles to separate kitchen away to prevent dust and water.

E Masonry Works

1 Flooring

1.1 Foyer Entrance To design, supply & lay entrance and walkway to kitchen using pebble-wash to create area of special effect

1.2 "To supply labour and lay homogenoeous tiles to lay living, dining area, common passage to rooms 600mmx600mm homogeneous tiles include skirting

1.3 "To supply labour and lay laminated flooring to lay MBR and common bedrooms 600mmx600mm wood include skirting

1.4 "To supply labour and lay homogenoeous tiles in balcony include skirting

1.5 "To supply labour and lay heavy duty non-slip homogenoeous tiles include skirting in kitchen area

1.6 "To supply labour and lay heavy duty non-slip homogenoeous tiles include skirting in MBR and common bathroom area

1.7 To supply and laying of waterproofing membrance (2to3 layers of quic-seal 104) / according to HDB standard at kitchen

2 Wall

2.1 To supply labour & lay full height rocky brick wall tiles at balcony

2.2 Supply & lay full height ceramic wall tiles @ kitchen area

2.3 Supply & lay full height ceramic wall tiles @ master bathroom area

F Carpentary & Feature Wall

1 Kitchen

1.1 To design, fabricate/supply & install 34ft(L) laminated kitchen cabinet c/w ABS trimming door. With designer handles.

1.2 To design, fabricate/supply & install 17ft(L) solid top @ kitchen cabinet area

1.3 To supply labour for installation of kitchen sink

1.4 To supply labour to install cooker & hob at kitchen area

1.5 To supply labour to install hood,hook and accessories at kitchen area

2 Doors/windows

2.1 To design, fabricate/supply & install wood-shutter at MBR Toilet door to conceal it. Customise: wooden shutter to mount onto sliding glass door

2.2 To supply & install standard bi-fold door at common toilet door.

2.3 To supply & install windows x 5 to Living Room, Common Bedrooms, Master Bedroom & Study Room

3 Masterbedroom

3.1 To design, fabricate/supply & install 34ft(L) laminated built-in wardrobe c/w ABS trimming door. With designer handle.

4 Study Room

4.1 To supply labour & materials to paste laminated wood-skins to study room glass doors.

5 Living Room

5.1 To design, fabricate/supply & install built-in shoe cabinate. With designer handle.

5.2 To supply labour & materials to built rocky brick wall for living room tv console

6 Dining area

6.1 To supply labour & materials to built wood-style wall (3-Piece, /// style) extended from living room for dining area

G Pumbling Works

1 Supply labour for installation of 2 instant water heaters

2 Supply labour for installation of bathrooms' accessories (toilet bowl, wash sink)

3 To help coordinate for installation of MBR's bathtub

4 Supply labour for installation of kitchen sink

5 Supply labour & materials to install inlet & outlet pipe for wash basin at kitchen area

6 To design, fabricate/supply & laying of concealed drainage pipe for kitchen sink

7 To design, fabricate/supply & laying of concealed drainage pipe for washing machine

8 To help in the connecting of gas piping (Supervise and Coordinate with PUB)

9 To help coordinate and ensure Aircon pipings don't effect the interior look & feel of the house

H Electrical planning and wiring

1 Supply, install new and / shift wire points

2 Supply, install new and/ shift 13Amp power points

3 Supply, install new and/shift Telephone points

4 Supply, install new and /shift SCV TV points

5 Supply labour to install dining area and balcony lights

6 Supply labour to install feature wall lightings

7 Supply labour to install electrical switches to new design

I Others

1 Cornices for Living, Dining Area

Edited by velv
 

Share this post


Link to post
Share on other sites
*New update

We had drafted a list of to-do base on one of the template in here =). Wondering whether installing of windows is also part of the contractor quote or the window supplier?

installing of windows can be done by either window contractor or main contractor. generally window sub-contractor gives a better price.

 

Share this post


Link to post
Share on other sites

i don't see any windows works on your quote.

you have windows in 5 rooms and balcony. will you be replacing them all?

going for the Bestview type or the normal type? :P

 

Share this post


Link to post
Share on other sites

Ossify quick eye ar ! yes cause we had the impression that reno-contractors dun install windows =p , which is why we separate it from the renovation quote.

Selection between bestview or normal depends on budget.

I had review the quote again and update as I also realized that jobs on wall tiles for kitchen and the bathroom were not listed.

Garion! thanks a lot for your blessing. = ] we hope all will go well, if not .. then it is the rocks and pebbles the path of life. Quiet exciting still ~

Today had completed uploading all resource for renovation into i-touch.

dscf2095.jpg

and it goes nicely into the pocket

dscf2099p.jpg

 

Share this post


Link to post
Share on other sites

Went IT show today and bought a Phillips Full HD-LCD 42" at 999 during Audio House Hourly Special (Model . 42PFL5609/98) . Original Price was 1999

At first we were thinking Toshiba 42" 699 which is also quiet a good bargain but Phillips model is better-looking.

First buy for our new home =)

philips-42pfl5609-98-1.jpg

Edited by velv
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×