patsy_sg 1 Report post Posted April 28, 2010 (edited) Thanks. How is the quote from Class Curtains? hmmm depends on the material i guess, but I did ask a few quotes from other companies, and their quote was slightly more expensive, but very very slightly lah.... I am doing panel blinds in the living room, plus roller blinds in all 3 bedrooms, they claim the material i choose were the higher range. in terms of the roller blinds, the price quoted was similar to the other companies. Edited April 28, 2010 by patsy_sg Share this post Link to post Share on other sites
blue218 0 Report post Posted April 28, 2010 hmmm depends on the material i guess, but I did ask a few quotes from other companies, and their quote was slightly more expensive, but very very slightly lah.... I am doing panel blinds in the living room, plus roller blinds in all 3 bedrooms, they claim the material i choose were the higher range. in terms of the roller blinds, the price quoted was similar to the other companies. ok. Thanks. Share this post Link to post Share on other sites
coldflamez 0 Report post Posted April 29, 2010 Today is the first day of reno. Hackings and hackings... We have given our ID 10 days to work on it. 10 days just for hacking?? That's very long.. Normally can complete hacking within 2 - 3 days... Share this post Link to post Share on other sites
blue218 0 Report post Posted April 29, 2010 10 days just for hacking?? That's very long.. Normally can complete hacking within 2 - 3 days... Oops... I meant 10 days to complete the whole reno... Share this post Link to post Share on other sites
blue218 0 Report post Posted April 29, 2010 Day 2 Acid stain on existing tiles to prepare for overlay of toilets and kitchen Laminates for rooms. Skirting hacked, timber skirting will be use. These are some of the materials and mess for day 2. Share this post Link to post Share on other sites
Hellangel 0 Report post Posted April 30, 2010 Day 2 Acid stain on existing tiles to prepare for overlay of toilets and kitchen Laminates for rooms. Skirting hacked, timber skirting will be use. These are some of the materials and mess for day 2. Bro.....i tink i knw exactly where ur unit is cos mine is the corner unit. the unit in between also currently renovating their kitchen...Whole floor full of drilling and hacking noise....i will keep the party going after u guys have finished Just went and took a look at ur unit yesterday from outside....ur view alot nicer then mine wor.... All the best to ur reno ya Share this post Link to post Share on other sites
coldflamez 0 Report post Posted April 30, 2010 Oops... I meant 10 days to complete the whole reno... wow, that's fast! but have to make sure the workmanship is good even if it is rushed leh.. Share this post Link to post Share on other sites
blue218 0 Report post Posted April 30, 2010 Bro.....i tink i knw exactly where ur unit is cos mine is the corner unit. the unit in between also currently renovating their kitchen...Whole floor full of drilling and hacking noise....i will keep the party going after u guys have finished Just went and took a look at ur unit yesterday from outside....ur view alot nicer then mine wor.... All the best to ur reno ya Oh yes, I noticed that the one in between us is also doing some reno... so we are neighbour lor? LOL.... Share this post Link to post Share on other sites
blue218 0 Report post Posted April 30, 2010 wow, that's fast! but have to make sure the workmanship is good even if it is rushed leh.. I have no worry about this ID. My previous unit is done by him 6 years ago, he has a group of good carpenters. Share this post Link to post Share on other sites
Hellangel 0 Report post Posted April 30, 2010 Oh yes, I noticed that the one in between us is also doing some reno... so we are neighbour lor? LOL.... Yup...we are neighbour.....my reno will oni start mid May bah.....nt in a rush......design similar to urs too Share this post Link to post Share on other sites
blue218 0 Report post Posted April 30, 2010 Yup...we are neighbour.....my reno will oni start mid May bah.....nt in a rush......design similar to urs too Good, will look out for your t-blog. BTW, do you find the BLUE window and balcony frames ugly? I wondered if that could be painted? Share this post Link to post Share on other sites
blue218 0 Report post Posted April 30, 2010 Day 3 Today the kitchen walls are acid stained. Tiling of walls in both bathrooms (no longer toilets because it looks nicer now... ) Counter-top window widened. The original window is too narrow and look ugly, so Tony decided to widen it. Overlaying of wall tiles in both bathrooms today. According to Tony, the tiles are tiled horizontally to give it a BIG and WIDE feel. This two ugly pipes will be boxed up later. Share this post Link to post Share on other sites
Hellangel 0 Report post Posted May 1, 2010 Good, will look out for your t-blog. BTW, do you find the BLUE window and balcony frames ugly? I wondered if that could be painted? Yup...it looks ugly to me....i wanted to paint it to white also...but my contractor says alu don ready take painting well....the paintwork is easily scratch n chip.....but since i am on budget...the blue frames will have to stand on first Share this post Link to post Share on other sites
blue218 0 Report post Posted May 9, 2010 This is the xx day of the reno... Was very busy and thus got no time to update this blog.. :-) This is the laminate flooring for the rooms. Master-room already done up. The patched wall will hang my LCD TV and the SCV box. Common Rooms Share this post Link to post Share on other sites
blue218 0 Report post Posted May 9, 2010 The Bathroom tiling completed Kitchen tiling are almost done. The tiler is working on the open counter now. Share this post Link to post Share on other sites