wa1ker 0 Report post Posted January 10, 2010 Hi all, Wondering what is the sequence of individual jobs in a renov work? From what I can think: - deominsh/hacking - construct base for kitchen cabinet and fridge, etc - paint (sealing, and 1st layer of paint) - electrical wiring jobs, install lights - pluming jobs, fix up toilet - flooring (kichen tiles, room floor, etc) - capentry (wardrobe, cabinet) - paint (2nd layer, touch up) Can someone advise if above is correct? or anything missing? Share this post Link to post Share on other sites
melvin 0 Report post Posted January 16, 2010 which part does the false ceiling come in? Share this post Link to post Share on other sites
noobhouse 1 Report post Posted January 21, 2010 hi all, could someone help see if this order is correct or wrong??? thanks Order of works 1. Painting 2. Installation of air con piping 3. Installation of air con blower & compressor (cause window grilles install in room) 4. Painting 5. Kitchen cabinets, kitchen door, window grilles 6. Electrical (water heat, lights, HOOD – before kitchen cabinets) actually for e hood I not sure if it's done by electrician or e hood ppl Share this post Link to post Share on other sites