Sequence Of The Renovation Jobs

Recommended Posts

Hi all,

Wondering what is the sequence of individual jobs in a renov work? From what I can think:

- deominsh/hacking

- construct base for kitchen cabinet and fridge, etc

- paint (sealing, and 1st layer of paint)

- electrical wiring jobs, install lights

- pluming jobs, fix up toilet

- flooring (kichen tiles, room floor, etc)

- capentry (wardrobe, cabinet)

- paint (2nd layer, touch up)

Can someone advise if above is correct? or anything missing?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

hi all, could someone help see if this order is correct or wrong??? thanks

Order of works

1. Painting

2. Installation of air con piping

3. Installation of air con blower & compressor (cause window grilles install in room)

4. Painting

5. Kitchen cabinets, kitchen door, window grilles

6. Electrical (water heat, lights, HOOD – before kitchen cabinets)

actually for e hood I not sure if it's done by electrician or e hood ppl :bangwall:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×