Warrior88 0 Report post Posted December 30, 2009 Dear forumers, Got this quote to do 2 toilet. For simplicity, I divide by 2 Hack floor tile = 150 Hack Wall tile = 200 water proofing = 150 Install floor tile = 450 ( include homogenous tile ) Install wall tile = 1375 ( include ceramic tile ) install pwc & basin = 215 ( pwc / basin not included ) haulage = 200 remove debris = 150 Total = 2890 ... So, if I buy pwc & basin & bidget spray = 400 Fixed glass shower panel = 600 Average / toilet = 4000. Pls advised and comment if I did not kanna carrot from contractor. Thanks in advance Share this post Link to post Share on other sites
kruncho 0 Report post Posted December 30, 2009 Sounds quite reasonable except for shower panel, shd be ard 400-500 range. Share this post Link to post Share on other sites
jadens28 1 Report post Posted December 30, 2009 Dear forumers, Got this quote to do 2 toilet. For simplicity, I divide by 2 1.Hack floor tile = 150 2.Hack Wall tile = 200 3.water proofing = 150 4.Install floor tile = 450 ( include homogenous tile ) 5.Install wall tile = 1375 ( include ceramic tile ) 6.install pwc & basin = 215 ( pwc / basin not included ) 7.haulage = 200 8.remove debris = 150 Total = 2890 ... So, if I buy pwc & basin & bidget spray = 400 Fixed glass shower panel = 600 (380 fixed tempered glass with swing door) Average / toilet = 4000. ( 3000 for item 1 to 8 including pwc & basin) Pls advised and comment if I did not kanna carrot from contractor. Thanks in advance Hi here to share, average of a toilet reno should be ard 3k. Share this post Link to post Share on other sites
mowaxchua 0 Report post Posted December 30, 2009 Dear forumers, Got this quote to do 2 toilet. For simplicity, I divide by 2 Hack floor tile = 150 Hack Wall tile = 200 water proofing = 150 Install floor tile = 450 ( include homogenous tile ) Install wall tile = 1375 ( include ceramic tile ) install pwc & basin = 215 ( pwc / basin not included ) haulage = 200 remove debris = 150 Total = 2890 ... So, if I buy pwc & basin & bidget spray = 400 Fixed glass shower panel = 600 Average / toilet = 4000. Pls advised and comment if I did not kanna carrot from contractor. Thanks in advance Does it include: 1) construct shower kerbs 2) vanity work top with bottom cabinet 3) Tempered Glass Shower Screen 4) Lay protection paper to protect existing floor tiles You have to check carefully with the contractor. If not, it will become hidden cost. Share this post Link to post Share on other sites
Warrior88 0 Report post Posted December 31, 2009 Sounds quite reasonable except for shower panel, shd be ard 400-500 range. Thanks Kruncho for the info Hi here to share, average of a toilet reno should be ard 3k. Last he told me for glass panel china = 450, Aust = 550 Does it include: 1) construct shower kerbs 2) vanity work top with bottom cabinet 3) Tempered Glass Shower Screen 4) Lay protection paper to protect existing floor tiles You have to check carefully with the contractor. If not, it will become hidden cost. No shower kerb, step down concept ( wet/dry area ) No vanity work top glass panel china = 450, Aust = 550 Corrugated paper , he quoted = 200 Oh..still got 1 more , must pay for rewiring inside toilet :( Share this post Link to post Share on other sites
home_sweet_home 0 Report post Posted December 31, 2009 Dear forumers, Got this quote to do 2 toilet. For simplicity, I divide by 2 Hack floor tile = 150 Hack Wall tile = 200 water proofing = 150 Install floor tile = 450 ( include homogenous tile ) Install wall tile = 1375 ( include ceramic tile ) install pwc & basin = 215 ( pwc / basin not included ) haulage = 200 remove debris = 150 Total = 2890 ... So, if I buy pwc & basin & bidget spray = 400 Fixed glass shower panel = 600 Average / toilet = 4000. Pls advised and comment if I did not kanna carrot from contractor. Thanks in advance so expensive to do up 1 toilet? if common toilet + Masterbed room toilet = $8000?? Share this post Link to post Share on other sites
Trust7780 0 Report post Posted December 31, 2009 Thanks Kruncho for the info Last he told me for glass panel china = 450, Aust = 550 No shower kerb, step down concept ( wet/dry area ) No vanity work top glass panel china = 450, Aust = 550 Corrugated paper , he quoted = 200 Oh..still got 1 more , must pay for rewiring inside toilet :( For the above quotation, I feel it may be a bit on the high side. I think you should get a few quoatations. Since you are doing renovation on your toilets, suggest you look for contractors instead for ids as it will be slightly cheaper. So far I never heard of panel glass from china or australia. Better get a few quotations. Share this post Link to post Share on other sites
Trust7780 0 Report post Posted December 31, 2009 so expensive to do up 1 toilet? if common toilet + Masterbed room toilet = $8000?? I think we should not add the cost of toilet bowls and basins as they have different price ranges. The price can be as low as $100 (Made in China) to $800 (Made in Spain or Italy). Share this post Link to post Share on other sites