Warrior88 0 Report post Posted December 29, 2009 Dear forumers, Would appreciate very much for your valuable time to help me evaluated this quotation. Really need all your expertise in this area DESIGN WORKS & PRELIMINARIES Haulage fee for the whole house = 400 Removal of debris from site = 300 labour & materials to lay corrugate paper **** & dining = 200 labour & materials to chemical wash whole flooring = 200 DEMOLISHING WORKS labour & materials to hack 01 x tv console **** = 150 labour & matterials to hack 01 x bedhead & dresser at master bedroom = 150 labour & materials to hack existing flooring at bath / wc 1 & 2 = 300 labour & materials to hack existing wall tiles at bath / wc 1 & 2 = 400 WET WORKS labour & materials to do water proofing at bath / wc 1 & 2 = 300 labour & materials to lay homogenous floor tiles at bath / wc 1 & 2 = 900 labour & materials to lay ceramic wall tiles at bath / wc 1 & 2 ( 430 @ 2/sqft ) =2,750 labour & materials to touch up existing fridge base with tiles = 120 PAINTING WORKS labour & materials to paint whole house with ICI / NIPPON paint =1,100 TIMBER WORKS labour & materials to install 01 x nyatoh door with standard lockset at bath / wc = 250 PLUMBING WORKS labour & materials to lay cold copper piping for bath / wc 1, 2 & kitchen = 450 labour to install 02 x basin, basin tap, pwc & bidet spray = 430 labour & materials to install 02 x instant heater = 120 labour to install 01 x kitchen sink & sink tap = 120 labour to install 01 x washing machine tap =15 ELECTRICAL WORKS ( Subject to site conditions ) labour & materials to install 02 x scv point = 280 labour & materials to install 01 x hood point to heater point = 120 labour to install 10 x lightings = 100 labour & materials to reinstall wiring at bath / wc 1 & 2 =300 CARPENTRY WORKS labour & materials to install wardrobe & shoe cabinet with new laminates = 320 labour & materials to install 3ft tall cabinet at existing fridge location = 660 labour & materials to touch up existing timber border on 01 x door at kitchen = FOC ALUMINIUM WORKS / OTHERS labour & materials to polish existing marble flooring for whole house = 1,700 labour & materials ( gypsum ) to install 03 x aircon pelmet at 03 x bedrooms = 360 labour & materials to install 01 x aluminium bifold door at bath / wc 3 ( BESGLAS ) = 280 ========================================== 12,775 Share this post Link to post Share on other sites
Mr Anything 0 Report post Posted December 30, 2009 I can't help much but here is some similar items i have from an id that you may compare with Supply and laying of corrugated protection paper roll at site. = 180.00 Supply labour / tools / materials for haulage / delivery of materials at site. = 150.00 Supply labour / tools / materials for clearing of debris at site. = 280.00 Supply labour / tools / materials for clearing of debris for hacking at site. = 560.00 Supply labour / tools / materials to provide general cleaning / chemical washing upon completion of renovation. = Inclusive All relevant renovation permits and documentation fees. = Inclusive Hacking of existing floor tiles @ Master Bathroom. = 150 Supply labour / tools / materials to paint complete with ICI Pentalite / Nippon Vinilex 5000 with a choice of up to 6 colours @ whole unit. = 1380 Supply and install white powder coated aluminium bi-fold door. = 260 Share this post Link to post Share on other sites
Warrior88 0 Report post Posted December 30, 2009 Thanks Mr Anything for the info Share this post Link to post Share on other sites
Mr Anything 0 Report post Posted December 30, 2009 =) no problem Try and help each other loh, coz i also looking ard for quotes... Happy New Year Share this post Link to post Share on other sites