lynnzlq 11 Report post Posted December 17, 2009 our 3ng amk flat toilet is a major pain in the *** right from the beginning pls see below for pre-renovation condition. http://s779.photobucket.com/albums/yy77/ly...mview=slideshow Share this post Link to post Share on other sites
born_again 0 Report post Posted December 19, 2009 our 3ng amk flat toilet is a major pain in the *** right from the beginning pls see below for pre-renovation condition. http://s779.photobucket.com/albums/yy77/ly...mview=slideshow it'll be very nice marble flooring after polishing and marble is lasting and add value to your flat. Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted December 25, 2009 it'll be very nice marble flooring after polishing and marble is lasting and add value to your flat. renovation will begin sometime in early jan 2010. stay tuned for more pictures and updates Share this post Link to post Share on other sites
deltaforce9 0 Report post Posted December 29, 2009 i wonder what's your budget to renovate? i was looking at similar flats, about 5 months ago.. in fact one that was down right ROTTEN... i mean it was used by a lion dance troupe... with cement walls and cement floors.... and an added bonus - it smelled of SWEAT... so was ready to spend $25K - $30K to do it up real nice... but in the end settled for something already renovated... and we've just been looking at minor repairs and painting... very interested to see what you get to do with your 3ng... i kinda didn't get a chance to renovate mine... but pretty happy with it still... Share this post Link to post Share on other sites
lee_sg_123 0 Report post Posted December 29, 2009 the super big pipes in toilet can be changed? if i'm not wrong it is linked to the whole building, all the sh**, water will go down that pipe. how to change? Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 6, 2010 http://m779.photobucket.com/albumview/albu...xf5l0E%2F3yw%3D today is 3rd day of hacking n finally done. so far it went as scheduled (for a start). They shd start all wet works tmr we can't wait to see the end result. Stay tuned for more pics. Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 6, 2010 (edited) http://m779.photobucket.com/albumview/albu...xf5l0E%2F3yw%3D today is 3rd day of hacking n finally done. so far it went as scheduled (for a start). They shd start all wet works tmr we can't wait to see the end result. Stay tuned for more pics tiles from lian seng hin at balestier lightings fr chan huat wc baron brand, kitchen tap frm serangoon rd toilet and kitchen sink poh choo aircon panasonic system 3 frm Gain wardrobe from Lumiera at plaza hotel Edited January 6, 2010 by lynnzlq Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 16, 2010 Kichen cement sink And cooker support is done. I'm very anal abt the cement grey color n I specifically told my I'd not to start any cement work w/o me. but the worker just went ahead. i almost flipped! My hall flooring will be cement screeded floor w stainless steel strips master toilet walls cement screed common toilet walls partial cement screed kitchen no wall tiles just painted white only bottom cement cabinet http://m779.photobucket.com/albums/lynnzlq...xf5l0E%2F3yw%3D Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted January 20, 2010 Kichen cement sink And cooker support is done. I'm very anal abt the cement grey color n I specifically told my I'd not to start any cement work w/o me. but the worker just went ahead. i almost flipped! My hall flooring will be cement screeded floor w stainless steel strips master toilet walls cement screed common toilet walls partial cement screed kitchen no wall tiles just painted white only bottom cement cabinet http://m779.photobucket.com/albums/lynnzlq...xf5l0E%2F3yw%3D finally i found someone who's doing cement screeded floors and walls. looking forward to seeing the pictures when its completed! Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 22, 2010 hi pre renovation pictures collection of keys : 28 dec 09 (waited 5 months!) Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 22, 2010 (edited) hi pre renovation pictures collection of keys : 28 dec 09 (waited 5 months!) now left abt 20% work to be completed. a lot of touch up to be done, like my kitchen cement table top, cement flooring and cement toilet walls. that is quite alot! Edited January 22, 2010 by lynnzlq Share this post Link to post Share on other sites
lynnzlq 11 Report post Posted January 22, 2010 hi all collection of keys : 28 dec 09 (waited 5 months!) now left abt 20% work to be completed. a lot of touch up to be done, like my kitchen cement table top, cement flooring and cement toilet walls. that is quite alot! pls see renovation process pictures master toilet with white grouting cement floor still very patchy and some big area darker than the rest, need to do serious buffering before we decided to screed the floor according to my ID cement kitchen table top, need to re screed again cos very patchy master room moisac wall for the mirror and wash basin Share this post Link to post Share on other sites
milkywhite 0 Report post Posted January 22, 2010 wow the old flooring is so retro. I like.:> Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted January 22, 2010 (edited) hey lynn, would you mind sharing how much you paid for the screeding of your floors? the whole house cement screed with metal strips between right? can PM me if more convenient..thanks! Edited January 22, 2010 by lilithfiend Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted January 22, 2010 Hi!have u set up a blog? nope not yet..still early days! Share this post Link to post Share on other sites