Reno Day +18 (11-04-2010)

More updates, more pics.

Kitchen12010-04-11.jpg

Kitchen wall rebuilt

Kitchen22010-04-11.jpg

A view of inside the kitchen

Kitchen32010-04-11.jpg

Yet another view. Kinda difficult to convey the sense of spaciousness the kitchen has at the moment with a photograph. Don't think my photography is doing a good job at establishing a sense of scale. Anyway, once the cabinets and appliances are in, bye bye space, hello clutter.

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Reno Day +18 (11-04-2010)

Living2010-04-11.jpg

Marble tiles that will be eventually used for the MBR toilet (Curiously, not sure why there are so many pieces here for a really tiny toilet)

Living22010-04-11.jpg

A close up of the marble (Again, sorry about the condition of the lighting. Flash photography kills details :( )

 

Share this post


Link to post
Share on other sites
Thank you thank you :D

First appointment soon I see. Must be excited! :)

yeah!! can't wait..am counting down to it. :D

 

Share this post


Link to post
Share on other sites
hi,

very nice 3D design you have came up!!! Pei fu..Pei fu :good:

mind to share which ID firm did you went?

thank you so much

Hi mango88,

Our ID is;

I.D.+A

237 Alexandra Road, The Alexcier #07-02

Singapore 159929

+65 64796566

Ask for Frank Tang

and their associated contractor is;

Growth Builder Pte Ltd

(same contact as above)

Ask for Choo Man Wai

Great and very creative ID. On the contractor side of things, solid workmanship and Mr. Choo is very meticulous. :good:

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites
Reno Day +18 (11-04-2010)

Living2010-04-11.jpg

Marble tiles that will be eventually used for the MBR toilet (Curiously, not sure why there are so many pieces here for a really tiny toilet)

Ah, mystery solved. Asked my contractor about this.

Our very nice contractor brought a truck load of marble tiles (more in the MBR) and had them all splayed out on the floor. Was wondering why there was so many. Clearly our tiny toilet didn't need that many. As he explained it, he had all tiles laid out so that he could pick, match and tag the tiles that will be eventually used. This was to ensure aesthetic consistency. He will haul the remaining tiles back. Wah, this is how the professionals do it. Very very detailed and methodical. :good: :good: :good:

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

Reno Day +23 (16-04-2010)

False Ceiling, False Ceiling, False Ceiling

DSCF0174.jpg

Living room false ceiling is done! :D

DSCF0180.jpg

Kitchen false ceiling, checked! ;)

DSCF0178.jpg

Passageway false ceiling, up! :D

DSCF0179.jpg

Another view (Towards the MBR)

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×