That's a good price that you pay for a big unit....good bargain!

I also recently bought a 4rm in Sengkang (not too far from you!) and will hv first appt on 19/4/2010...that's even longer! due to the HDB backlog and also cos the buyer of my unit needs to drag their first appt....

so likely i will start reno only somewhere in June :o but am very kiasu, started to gather data in RT :P

Hi samgalz, greetings. We haven't been updating the blog on the account that we were still waiting for our keys. But we are back from our hiatus. Getting our keys soon. Completion date set on the 10th March. Yay! Can't believe we had waited nearly 5 month since we signed the OTP. C'mon HDB, shake a leg.

Yes, completely understandable the urge to start early. Nothing kiasu about it. The more info gathered, the more informed the decisions made. At least that's the way I see it. We are pretty much done with our planning stages. Purchases are at 80% complete.

Do keep us updated on your progress. Happy hunting.

On our end; 25 days to go.... :D

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Hi samgalz, greetings. We haven't been updating the blog on the account that we were still waiting for our keys. But we are back from our hiatus. Getting our keys soon. Completion date set on the 10th March. Yay! Can't believe we had waited nearly 5 month since we signed the OTP. C'mon HDB, shake a leg.

Yes, completely understandable the urge to start early. Nothing kiasu about it. The more info gathered, the more informed the decisions made. At least that's the way I see it. We are pretty much done with our planning stages. Purchases are at 80% complete.

Do keep us updated on your progress. Happy hunting.

On our end; 25 days to go.... :D

hello!

back to track ur reno progress.. 18 more days! :)

 

Share this post


Link to post
Share on other sites

We're back!

Gotten our keys on 10/03/10 and renovation's starting soon. Hacking begins on 25/03/10.

I guess its a good time for some "before" pictures then;

MBR

MBR1.jpgMBR2.jpgMBR4.jpgMBR5.jpg

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

The MBR toilet is pretty small. The door is literally fraction of an inch away from the toilet seat when swung in. Kinda poor design decision. We're taking out the door to remedy this problem.

MBR8copy.jpg

MBRToilet.jpg

MBR7.jpg

MBR6.jpg

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

And finally, the Kitchen

Kitchen1.jpg

Kitchen2.jpg

Kitchen3.jpg

Kitchen4.jpg

The view from directly outside the kitchen. This wall will also be removed.

Kitchen5.jpg

This will be the dining area (next to the kitchen).

More photos to come once hacking commences. :D

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

hey thirdrock! finally starting soon eh? :D

i see your layout's same as nolit's... and ure having quite a fair bit of open concept stuff eh? lotsa glass too? :P

yah, the mbr toilet is superbly tiny, so we changed to bifold, at least now its not as squeezy in the toilet... haha.. but i realise your basin area at the mbr toilet also got a column of wall, so its shorter by abit...

major overhaul it seems.. :P wads the estimated quote as of now?

 

Share this post


Link to post
Share on other sites
hey thirdrock! finally starting soon eh? :D

i see your layout's same as nolit's... and ure having quite a fair bit of open concept stuff eh? lotsa glass too? :P

yah, the mbr toilet is superbly tiny, so we changed to bifold, at least now its not as squeezy in the toilet... haha.. but i realise your basin area at the mbr toilet also got a column of wall, so its shorter by abit...

major overhaul it seems.. :P wads the estimated quote as of now?

Yes, it has been torturous waiting. Things are finally moving. Yay! :D

As for the reno plan, won't really have any open concept per se but will be replacing the kitchen and study room walls with glass. Just to create an illusion of space. And yes, pretty major overhaul.

Our MBR toilet counter top is a lot shorter than yours. That annoying column. The door doesn't help too. We are taking away the door and replacing it with another that swings outwards.

Estimated quotation is almost $60k :(

Edited by thirdrockdweller
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×