Marcus168 0 Report post Posted December 4, 2009 Hope this can help you guy to filter out some sub-contractor who do short-cut job. Is the steps below correct? Any one got better steps? Or standard practice steps. Steps: 1. Paint the floor or wall tile with adhesive and let it dry. 2. Lay the tiles with good adhesive. Some sub-contractor just lay the tiles without step 1. Share this post Link to post Share on other sites
SolutionProvider 0 Report post Posted December 6, 2009 I hv never seen before that the adhesive can be paint coz the adhesive is mix from liquid and prepacked powder adhesive till it is paste form and there is no way that the worker can paint. Regrads to the good tile adhesive, I would strongly recommend Mapei Adhesive. If contractor are using W1, please ask them to provide a test report by the manufacturer on the strenght for tiling. I saw b4 the tiles hollow after the contractors did the tiling job. You can check out the website : http://www.mapei.com They are specialist in tile adhesive. Share this post Link to post Share on other sites