Kengar 0 Report post Posted December 2, 2009 Hi All, Has any Forumer here completed their installation recently? My cables and pipes were all boxed up during renovation last year, does anyone have any experience / suggestion how best can i still hide the new Opennet cable without using their trunking? Thanks in advance! Share this post Link to post Share on other sites
creatrixnator 0 Report post Posted January 14, 2010 Hi All, Has any Forumer here completed their installation recently? My cables and pipes were all boxed up during renovation last year, does anyone have any experience / suggestion how best can i still hide the new Opennet cable without using their trunking? Thanks in advance! Hi Kengar, have you done your opennet yet? any ideas? Share this post Link to post Share on other sites
MTlot 0 Report post Posted January 14, 2010 (edited) Don't worry about that, they'll advise you accordingly. I told them that i don't let them touch my false ceiling and ask them to propose another way. Their trunking is less than a foot long because use my existing trunking and size around 20cmx20cm max. Edited January 14, 2010 by MTlot Share this post Link to post Share on other sites
creatrixnator 0 Report post Posted January 14, 2010 Don't worry about that, they'll advise you accordingly. I told them that i don't let them touch my false ceiling and ask them to propose another way. Their trunking is less than a foot long because use my existing trunking and size around max 20cmx20cm max. thanks, i hope so & all turns out well - it looks rather complicated not to mess things up to me Share this post Link to post Share on other sites
MTlot 0 Report post Posted January 14, 2010 (edited) thanks, i hope so & all turns out well - it looks rather complicated not to mess things up to me Don't stress too much, which ever place you think that you don't want them touch just tell them. Ask them to propose, if you're happy with the proposal, then only ask them to do, not happy ask them to propose again. Anyway you've got around 15meters to play around before they start to charge additional cable run. Edited January 14, 2010 by MTlot Share this post Link to post Share on other sites