wonderbeezz 0 Report post Posted November 27, 2009 (edited) Tiling Process: Start Date: 18/11/09 End Date: Still in progress Experience: Good so far Comment: Tilers are very experience, tiling progress is rather fast, no hiccups so far. Kitchen Tiling: Master Bedroom Toilet: Tiling: Edited November 27, 2009 by wonderbeezz Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted November 27, 2009 Close Up on Master Bedroom Toilet: Living Room Floor Tiles: Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted November 28, 2009 Hmm...Blue glass window!Soooo nice! Haha, actually the windows are dark grey, not sure why it turn out green in the photo. Share this post Link to post Share on other sites
Rasp 0 Report post Posted November 30, 2009 Hey Wonderbeezz, I hasn't popped into renotalk recently. Hee.. didnt realised you have started your t-blog until princessdella dropped me a message. Hee.. must come & support your t-blog~!! Er.. I think we are the first few around to know your reno started... but still..... CONGRATS!! And may everything goes smoothly til the end. We look forwards to seeing the final results~~ must invite us over, okie? PS. We noticed that your main door is removed, so peeped in through the gate over the wkends... your white gloss floor look pretty nice. Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 1, 2009 Hey Wonderbeezz, I hasn't popped into renotalk recently. Hee.. didnt realised you have started your t-blog until princessdella dropped me a message. Hee.. must come & support your t-blog~!! Er.. I think we are the first few around to know your reno started... but still..... CONGRATS!! And may everything goes smoothly til the end. We look forwards to seeing the final results~~ must invite us over, okie? PS. We noticed that your main door is removed, so peeped in through the gate over the wkends... your white gloss floor look pretty nice. Haha, thanks! So far so good for everything. How's your big planning coming up? Share this post Link to post Share on other sites
happypie 0 Report post Posted December 1, 2009 welcome!! hope ur reno journey is smooth! cheers Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 2, 2009 welcome!! hope ur reno journey is smooth! cheers Thank! I hope so too! Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 2, 2009 (edited) Updates Separation wall in master bedroom toilet Going to be wardrobe area (Combine store room into master bedroom) Edited December 2, 2009 by wonderbeezz Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 2, 2009 (edited) Change in Kitchen entrance Common toilet shower area Edited December 2, 2009 by wonderbeezz Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 2, 2009 (edited) Foyer area Edited December 2, 2009 by wonderbeezz Share this post Link to post Share on other sites
Rasp 0 Report post Posted December 3, 2009 Updates Separation wall in master bedroom toilet Going to be wardrobe area (Combine store room into master bedroom) Good Morning Wonderbeezz, The big planning... er... still in progress. We kinda just started our planning. Hee.. shaking legs for too long.. Your reno progress looks good. hee.. your black & white bathrooms look very different from mine. Look very neat too. Mbr bathroom with vertical wall tiles and common one with horizontal wall tile.. different effects for each bathroom. Foyer area also different, hee.. even the overall layout plan is different cause we built and hack different wall. Hee.. seems like everyone who start with this layout, all came up with different layout plan. Really look forward to your final outcome. By the way, you changed your wardrobe location? Looking at your layout plan, I thought your bed is suppose to be at combine store area. Umm.. then no wiw? Share this post Link to post Share on other sites
wonderbeezz 0 Report post Posted December 3, 2009 Good Morning Wonderbeezz, The big planning... er... still in progress. We kinda just started our planning. Hee.. shaking legs for too long.. Your reno progress looks good. hee.. your black & white bathrooms look very different from mine. Look very neat too. Mbr bathroom with vertical wall tiles and common one with horizontal wall tile.. different effects for each bathroom. Foyer area also different, hee.. even the overall layout plan is different cause we built and hack different wall. Hee.. seems like everyone who start with this layout, all came up with different layout plan. Really look forward to your final outcome. By the way, you changed your wardrobe location? Looking at your layout plan, I thought your bed is suppose to be at combine store area. Umm.. then no wiw? Yup, decided to change as due to the beam which separate the store and mbr. Cause above bed can't havbe beam, so need to do false ceiling, which will make the ceiling very "short". Hmmm... for ur planning, what else is missing? Most have settle already right? Share this post Link to post Share on other sites