zhiz 4 Report post Posted November 26, 2009 (edited) Doing my reno now. After painting, watermark stains appeared esp during heavy rainfall recently. Informed Town council immediately and HDB went to view my place along with my ID. They saw the leakage and checked the roof and confirm there is a problem. Town council say they will retify. I ask them when, they cannot commit. Say depend on weather and schedule. So i ask them what basis/guideline they are working on for weather prediction, she couldnt answer me. So she just say these 2 months rainy season. Give them 3 month! After a lot of dragging she say will do by end jan. After talk a lot more, she say will try to do the kitchen and toilet. But my master bedroom ceiling also!! She say must waterproofing the whole ceiling and if raining will affect the others cos it will leak through. if waterproofing must do the whole roof cannot be partial. I need more ideas to force them to get the job done when they are trying to be ambiguous. Edited November 26, 2009 by zhiz Share this post Link to post Share on other sites
zhiz 4 Report post Posted November 26, 2009 Doing my reno now. After painting, watermark stains appeared esp during heavy rainfall recently. Informed HDB immediately and HDB went to view my place along with my ID. They saw the leakage and checked the roof and confirm there is a problem. HDB say they will retify. I ask them when, they cannot commit. Say depend on weather and schedule. So i ask them what basis/guideline they are working on for weather prediction, she couldnt answer me. So she just say these 2 months rainy season. Give them 3 month! After a lot of dragging she say will do by end jan. After talk a lot more, she say will try to do the kitchen and toilet. But my master bedroom ceiling also!! She say must waterproofing the whole ceiling and if raining will affect the others cos it will leak through. if waterproofing must do the whole roof cannot be partial. I need more ideas to force them to get the job done when they are trying to be ambiguous. Paiseh I mean town council... Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted November 26, 2009 Doing my reno now. After painting, watermark stains appeared esp during heavy rainfall recently. Informed Town council immediately and HDB went to view my place along with my ID. They saw the leakage and checked the roof and confirm there is a problem. Town council say they will retify. I ask them when, they cannot commit. Say depend on weather and schedule. So i ask them what basis/guideline they are working on for weather prediction, she couldnt answer me. So she just say these 2 months rainy season. Give them 3 month! After a lot of dragging she say will do by end jan. After talk a lot more, she say will try to do the kitchen and toilet. But my master bedroom ceiling also!! She say must waterproofing the whole ceiling and if raining will affect the others cos it will leak through. if waterproofing must do the whole roof cannot be partial. I need more ideas to force them to get the job done when they are trying to be ambiguous. U staying at the top floor ar ... Actually me having the same problem too wor . But my lucky only affect 1 room and they fix the roof within 1 week . (they did told me it will be longer if everyday rain). Now pending the ceiling Can read up more at page 24/25 of my thread . Share this post Link to post Share on other sites
zhiz 4 Report post Posted November 26, 2009 U staying at the top floor ar ... Actually me having the same problem too wor . But my lucky only affect 1 room and they fix the roof within 1 week . (they did told me it will be longer if everyday rain). Now pending the ceiling Can read up more at page 24/25 of my thread . ya lo top floor....... Share this post Link to post Share on other sites