Supersimon27 2 Report post Posted January 19, 2010 After almost 5 mths of wait, the time finally come and I am getting the keys officially today. Just hope the reno in the next 2 mths will be smooth smooth. Wow ... Hope to see the transform soon Share this post Link to post Share on other sites
Rasp 0 Report post Posted January 21, 2010 Hi Everyone, I have been reading this forum, soaking tons of info that everyone here contribute ever since I signed my OTP in Sep 09 to get this HDB 5rm in Shunfu. 1st Appt is scheduled on 1st Dec and I est my 2nd appt will be around mid Jan or so. Have been spending almost every weekend looking at reno stuff and also trying very hard to get quotes from all the good contractors recommended by friends here. I am leaning to engage a contractor and not an ID as my reno is rather simple type. Will try to update and post more photos upon getting my keys in Jan 2010, meantime here is my floorplan. Initial plan is to 1. Redo both toilets and kitchen, meaning everything to go. Reposition common toilet door to enable me to fix a glass shower screen there as well as the MBR 2. Laminate for my bedrooms and probably Living/Dining area as well. 3. Level up the balcony to make the living room more spacious 4. Rewiring whole house 5. Replaster whole house wall and ceiling 6. Carpentry works for wardrobe in all bedrooms Any suggestion welcome as I plan to confirm the contractor in Dec, probably would not rush for CNY Handover as it is almost impossible. Thanks Hi Eugela, Congrats on getting the keys and starting your reno. We got the same layout too. Hee.. I seen 5 t-blog with this layout and all of us came up with different layout after reno. Hee.. looking forward to seeing your completed works. Share this post Link to post Share on other sites
eugela 0 Report post Posted January 23, 2010 Took some final pictures of my place before the hacking comes in next week. Living Room from Entrance Living Room from Balcony Master Room Kitchen Somehow, we were being suck into the buying atmosphere at the Gain City Expo Show and bought these items:- 1. Hitachi System 3 Split Aircon with 5 Yrs Warranty 2. Sharp Fridge SJ PT 51R with 5 Yrs Warranty 3. Fisher Washer GWC 12 4. Taiyo Induction Cooker from Courts THIB 229 with 5 yrs Warranty Next weekend will hunt for toilet stuff and kitchen sink etc. Any good deal and places that I must visit for such stuffs, pls let me know. Will be out of town to Shanghai next whole week, hope the reno will starts smoothly Thats all for now. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted January 23, 2010 Poh joo Royal fanco Hoe Kee I think this few are the more popular one Share this post Link to post Share on other sites
dannywmp 3 Report post Posted January 23, 2010 Took some final pictures of my place before the hacking comes in next week. Living Room from Entrance Living Room from Balcony Master Room Kitchen Somehow, we were being suck into the buying atmosphere at the Gain City Expo Show and bought these items:- 1. Hitachi System 3 Split Aircon with 5 Yrs Warranty 2. Sharp Fridge SJ PT 51R with 5 Yrs Warranty 3. Fisher Washer GWC 12 4. Taiyo Induction Cooker from Courts THIB 229 with 5 yrs Warranty Next weekend will hunt for toilet stuff and kitchen sink etc. Any good deal and places that I must visit for such stuffs, pls let me know. Will be out of town to Shanghai next whole week, hope the reno will starts smoothly Thats all for now. Hi eugela, Congrats starting reno soon...hope everything is smooth sailing...need any help do approach the Henner Club guys...we are ready to help. toilet and kitchen stuff, beside what simon had recommended...I have one more to add on... GR Link. Also Along Jln Besar... U going Shanghai...may I suggest you go into the China Shopping Website http://www.taobao.com/index_global.php to do some shopping and if u see some you like, get your friends at SH to order for u first then u can collect them on time when u are there. Trust me alot of interesting stuff like clock, wall decal, wall papers...lighting etc... Share this post Link to post Share on other sites
eugela 0 Report post Posted January 24, 2010 Simon and Danny, Thanks for the recommendation, will definitely visit them next weekend. As for the China website, will explore too but maybe too late for this round as my schedules are all tied up liao Share this post Link to post Share on other sites
eugela 0 Report post Posted January 30, 2010 Quick update, this is what greeted me when I went to my place this morning after the 1st day of hacking yesterday, seems like the people is very efficient, just 1 day whole house flooring, walls all gone. Officially the beginning of my reno process...... Share this post Link to post Share on other sites
kruncho 0 Report post Posted January 31, 2010 Hey, I just added you on MSN! Share this post Link to post Share on other sites
eugela 0 Report post Posted February 1, 2010 Hey, I just added you on MSN! Good to chat with you, hope your reno is fast and smooth too Share this post Link to post Share on other sites
eugela 0 Report post Posted February 4, 2010 Almost a week after my reno started, few days back, drop over to check it out and saw this truck full of our debris: When we went up our place, we noticed the wall at the entrance foyer was gone - good, meaning the 2nd HDB approval is OK New toilet entrance And as we were leaving, saw this lorry unloading cement, pipe, hollow blocks for us We should be able to get most of our tiles laid before CNY holidays according to Michael, crossing our fingers. Share this post Link to post Share on other sites
ericmar 0 Report post Posted February 23, 2010 hi eugela, No updates on ur t-blog? Can share photos of ur newly renovated house? Thanks. Eric Share this post Link to post Share on other sites
eugela 0 Report post Posted February 23, 2010 Eric, the work was stopped for the CNY holidays and just resume this week. So far only the tiles are done and this week suppose to install windows, plaster and followed by electricals, aircon etc. Will post some pics after this week when the place is more clean up. Michael is confident that the HO can be by end mar. Share this post Link to post Share on other sites
fuzzybrain 0 Report post Posted February 27, 2010 Eric, the work was stopped for the CNY holidays and just resume this week. So far only the tiles are done and this week suppose to install windows, plaster and followed by electricals, aircon etc. Will post some pics after this week when the place is more clean up. Michael is confident that the HO can be by end mar. hi there.. how was ure reno with ID note...any major hiccups... Share this post Link to post Share on other sites
eugela 0 Report post Posted February 27, 2010 Not at all, so far they have been very prompt in delivering what they promise. My tiles are all done and windows changed 2 days back. Hope the rest of the reno like plastering, wiring, plumbing and carpentry will be smooth as well. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted March 1, 2010 Not at all, so far they have been very prompt in delivering what they promise. My tiles are all done and windows changed 2 days back. Hope the rest of the reno like plastering, wiring, plumbing and carpentry will be smooth as well. Good Good Another happy Henner Share this post Link to post Share on other sites