takesion 0 Report post Posted November 1, 2009 (edited) We have already started renovating in beginning oct for our new 5-rm flat. Below is our floor plan with some scribbling. Will upload our other progressing pics soon. Edited November 2, 2009 by takesion Share this post Link to post Share on other sites
merryman 0 Report post Posted November 1, 2009 We have already started renovating in beginning oct for our new 5-rm flat. Below is our floor plan with some scribbling. Will upload our other progressing pics soon. Floorplan Welcome to t-blogs. I'll probably not have time to follow through your t-blog closely as I did with some others' but I do hope you'll get the same help with the forummers who are still active here and helping... Share this post Link to post Share on other sites
Nekorin 0 Report post Posted November 1, 2009 welcome to renotalk :3 Share this post Link to post Share on other sites
rainbowgal 0 Report post Posted November 1, 2009 welcome! we hv very similar layout! Share this post Link to post Share on other sites
necrosis 0 Report post Posted November 1, 2009 hello!! welcome....am a westie too... which part is your new place? mine's at west coast. Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 (edited) welcome! we hv very similar layout! Oh that is great Edited November 2, 2009 by takesion Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 (edited) hello!! welcome....am a westie too... which part is your new place? mine's at west coast. Thanks... Mine is at Choa Chu Kang Edited November 2, 2009 by takesion Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted November 2, 2009 (edited) welcome to RT - blog . Seem that u using flickr to upload the pic . Do rem to press the insert image then add in yr link So that it can display out Edited November 2, 2009 by Supersimon27 Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 (edited) Living room & balcony Common bathroom Kitchen Service balcony We have engaged Mr Yeak from Basic Image to carry out for our renovation work Edited November 2, 2009 by takesion Share this post Link to post Share on other sites
Reinshagen 0 Report post Posted November 2, 2009 Living room & balcony Welcome and congrats to your new dwell! It's going to be a tiring but worth every minute to see your home transforming bit by bit! Have fun! Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 Master toilet Bedroom More hacking works carried out by Mr Yeak's men. Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 All debris are removed two days later. Very efficient Living-room Dining hall Common bathroom Kitchen Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 (edited) Service balcony Walkway Bedroom Edited November 3, 2009 by takesion Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 (edited) We went to Hafary at Balestier to select our floor/wall tiles. This place was strongly recomended because Yeak said the tiles will not 'warp' and better quality compare to the other tile shops. We are given samples to bring back home and eventually finalised 3 days later Initially, we chose combination 2 & 4 and told Yeak that we want them all to be 300 X 600mm only. However, we only discovered that the floor tiles only comes in 300 X 300mm when we go check the tiles after the delivery on a faithful day and was not informed about it at all(nearly fainted ). Luckily Yeak did not start on tile laying too soon, and I will have to rush down to Hafary all the way again to change to the grey floor tiles with 300 X 600mm (pic 1 & 2) The moral of the story is that the close supervision by the house owner is highly recommended bah. Edited November 3, 2009 by takesion Share this post Link to post Share on other sites
takesion 0 Report post Posted November 2, 2009 We have sealed up an opening for our refrigerator. However, some blocks that are used for the sealing are in pieces as shown in the photo(poor quality? ). We highlighted these problems to Yeak, but he said these are not problems. Think the probability of wall collapsing should not be high bah(put my finger cross ) Share this post Link to post Share on other sites