creatrixnator 0 Report post Posted January 13, 2010 The wardrobe in the master bedroom is one of a kind...go through wardrobe to go into toilet...... cos of the floor plan. i have similar floor plan, find it very hard on how to combine with next bed room, or place to put wardrobe so would be interested in seeing your updated floor plan/ placement.. (still long more to get keys -- still building! so lots more time to think Share this post Link to post Share on other sites
amrasenelya 1 Report post Posted January 13, 2010 (edited) actually, its not hack everything....nothing much to hack in the first place other than the floors and toilets. very little carpentry to remove quite alot of things la.. walls and floors... mine even lesser carpentry, only green wardrobes n blue kitchen cabinets.. urs got red... green... wooden wardrobes.... and orange kitchen cabinets to hack... Edited January 13, 2010 by amrasenelya Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 14, 2010 cos of the floor plan. i have similar floor plan, find it very hard on how to combine with next bed room, or place to put wardrobe so would be interested in seeing your updated floor plan/ placement.. (still long more to get keys -- still building! so lots more time to think Actually, we didnt hack any bedroom walls. So its a challenge to put in the wardrobe in the master bedroom. Coupled with a king size bed, we are still planning the exact placement of the wardrobe. Wont have to get through to the wardrobe to the toilet though You're in punggol too? Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 24, 2010 Tiling Works (Completed) Aircon Installation (Completed) Plumbing (Completed) Electrical Works (Completed) Sanitary Wares Installation (90% completed) False Ceiling + L-Box Kitchen Cabinet Glass Works Door Installation Lights Installation Painting Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 24, 2010 (edited) L-box and false ceiling works in progress Edited January 24, 2010 by lord vader Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 24, 2010 Kitchen: Gas Piping, Water Piping, Cabinet Base completed Left and Right side of kitchen: Alternate view of kitchen: Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 24, 2010 Toilets: Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 24, 2010 Aircon Installed: Master Bedroom wall levelled: Cabinet drawers waiting to be installed: Share this post Link to post Share on other sites
CJREDDEVIL 0 Report post Posted January 24, 2010 Tiling Works (Completed) Aircon Installation (Completed) Plumbing (Completed) Electrical Works (Completed) Sanitary Wares Installation (90% completed) False Ceiling + L-Box Kitchen Cabinet Glass Works Door Installation Lights Installation Painting Hey LV... reno progress looking good & smooth yea !.. ..looking for more transformation pics. Cheers! Share this post Link to post Share on other sites
creatrixnator 0 Report post Posted January 24, 2010 Actually, we didnt hack any bedroom walls. So its a challenge to put in the wardrobe in the master bedroom. Coupled with a king size bed, we are still planning the exact placement of the wardrobe. Wont have to get through to the wardrobe to the toilet though You're in punggol too? yep, punggol too, but still in the process of building Share this post Link to post Share on other sites
Mickey M 0 Report post Posted January 26, 2010 LV, progress seems to be going well for u. . Have not been reading up as I was away on reservist. Share this post Link to post Share on other sites
lord vader 0 Report post Posted January 26, 2010 LV, progress seems to be going well for u. . Have not been reading up as I was away on reservist. Thanks. So far so gd. But this week and next week are crunch weeks. Hows reservist? free food...free lodging.... Share this post Link to post Share on other sites
Mickey M 0 Report post Posted January 26, 2010 Thanks. So far so gd. But this week and next week are crunch weeks. Hows reservist? free food...free lodging.... Yah yah. Free food! Free ice-cream. Free flow somemore.. ha.. Share this post Link to post Share on other sites
lord vader 0 Report post Posted February 11, 2010 Date Reno Started : 28 Dec 09 Date Handover : 11 Feb 10 Now, its all mine ! Mine ! *Evil laugh* Share this post Link to post Share on other sites
CJREDDEVIL 0 Report post Posted February 11, 2010 Date Reno Started : 28 Dec 09 Date Handover : 11 Feb 10 Now, its all mine ! Mine ! *Evil laugh* hey LV... Congrates to your reno completion and HO lieow.......so any pics to show ornot?....already unpacked and ready for CNY celebrations....????? Wishing you Happy & Prosperous Lunar New Year 2010.........HHHuuuuuaat Ah !!!!! ...... ........ye nyek nyek nyek.......this is evil-evil laugh..... ....cheers! Share this post Link to post Share on other sites