dannywmp 3 Report post Posted October 17, 2009 Hi, how much to set aside if I want to do up the following 1) 14 lighting points 2) 15 downlights 3) 2 x 15 amps point 4) 3 SCV points 5) 1 heater point 6) 2 telephone point 7) 1 door bell 8) New DB 9) 13amp (single) x 10 10) 13 amp (double) x 6 11) Rewiring 12) Grounding 13) PUB testing 14) All light switches (Big ones) 15) fitting of lights Did I miss out anything, please help me highlight. Thanks many many,. Share this post Link to post Share on other sites