jthk18 0 Report post Posted November 10, 2009 jthk18 i think i saw quite a few design tt have stools underneath the coffee table @ s&c, u might want to check them out there and its cheaper too, $380 if i m not wrong. wow... 380? a lot more cheaper le. I'm looking for a squarely blk coffee table. will visit S&C n Hommage one day for my furniture. Thanks for your info Diana. Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 Leaving for 1st appointment. wish me luck frens. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted November 10, 2009 Leaving for 1st appointment. wish me luck frens. gogogogo jthk18 .... Wish u shun shun li li Share this post Link to post Share on other sites
coffee_o 1 Report post Posted November 10, 2009 Leaving for 1st appointment. wish me luck frens. Good luck it should be very fast eh regarding my trunking hor, I might have to run through my toilets leh sianz so ugly Share this post Link to post Share on other sites
red_devil 0 Report post Posted November 10, 2009 Good luck it should be very fast eh regarding my trunking hor, I might have to run through my toilets leh sianz so ugly Alamak....no chance to re-route har? Btw, jthk18, good luck! heehee. Buy the queue number for 4D..maybe might strike! Share this post Link to post Share on other sites
coffee_o 1 Report post Posted November 10, 2009 Alamak....no chance to re-route har? Btw, jthk18, good luck! heehee. Buy the queue number for 4D..maybe might strike! no leh cos the FSM say my aircon die die must install on top of the door of my MBR then that one beam cannot hack the hole so the trunking bo pian have to go thru the toilet lor Share this post Link to post Share on other sites
zerochristy 0 Report post Posted November 10, 2009 no leh cos the FSM say my aircon die die must install on top of the door of my MBR then that one beam cannot hack the hole so the trunking bo pian have to go thru the toilet lor Erms... thought usually the Air-con is place on top of the bedroom door de... My aircon trunking also go thru our MBR bathroom too Share this post Link to post Share on other sites
coffee_o 1 Report post Posted November 10, 2009 Erms... thought usually the Air-con is place on top of the bedroom door de... My aircon trunking also go thru our MBR bathroom too eh dunno leh the GC technician says cannot dunno if it's too ma fan to them to do so that why they tries to smoke me or really cant Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 gogogogo jthk18 .... Wish u shun shun li li Thx man... completion date tentatively fix on 5th Jan 2010. wah.. still very long le Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted November 10, 2009 Thx man... completion date tentatively fix on 5th Jan 2010. wah.. still very long le Wah , not bad , so fast know 2nd appointment date le. I only knew it 1 week b4 the completion date Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 Good luck it should be very fast eh regarding my trunking hor, I might have to run through my toilets leh sianz so ugly What very fast? Completion? need another 8 weeks le. search for the installer advice lo.. see they have better idea or not Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 Alamak....no chance to re-route har? Btw, jthk18, good luck! heehee. Buy the queue number for 4D..maybe might strike! okok.. buy tomorrow.. HUAT AHHH!!! Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 no leh cos the FSM say my aircon die die must install on top of the door of my MBR then that one beam cannot hack the hole so the trunking bo pian have to go thru the toilet lor if boh pian then have to run thru toilet lo... then ask your contractor how to cover (boxup) the trunking nicely lo Share this post Link to post Share on other sites
jthk18 0 Report post Posted November 10, 2009 Wah , not bad , so fast know 2nd appointment date le. I only knew it 1 week b4 the completion date 8 weeks should be the longest period for 2nd appointment right? As seller request, so we tentatively fix on 8 weeks. She will check with her contractor, if she can move to her new place earlier, then we will request HDB to change the 2nd appointment to earlier date. Share this post Link to post Share on other sites
coffee_o 1 Report post Posted November 10, 2009 8 weeks should be the longest period for 2nd appointment right? As seller request, so we tentatively fix on 8 weeks. She will check with her contractor, if she can move to her new place earlier, then we will request HDB to change the 2nd appointment to earlier date. Mine is 6 weeks nia next thur my 2nd appt liao anyway 8 weeks is the norm lah Share this post Link to post Share on other sites