feimei 0 Report post Posted December 11, 2009 went shopping today... bought a kitchen sink and tap... both toilet and shower taps... plus tiles have been up today... mbr toilet tiles: kitchen tiles: we having the same kitchen tiles!!!! Share this post Link to post Share on other sites
momo13 0 Report post Posted December 11, 2009 we having the same kitchen tiles!!!! oh is it? looks like this tiles is v popular Hi Momo13, I just realised your kitchen tiles is my kitchen toilet tiles... yup saw that when u mentioned about the window issue. hihi.. my toilet theme is same as urs too! lime green + white.. a v refreshing combi... hope to see more pics! thanks plants no use, unless you use man-eating plants erm where to find them? white and green!Good choice! thanks Share this post Link to post Share on other sites
dannywmp 3 Report post Posted December 16, 2009 Bro... How is everything so far...Never see you update your progress for so many days liao... The plumbing work settle liao or not? Checkout my blog for the flooring picture updates... cheers Share this post Link to post Share on other sites
lohwl2000 0 Report post Posted December 16, 2009 oh should be fast... mine thurs going fix water pipes n etc... Hi Rey, How's things going sorry MIA for a while as my reno is having some hiccups so have to spend time remedy the issue before it can progress further... Glad that your reno is going well, all the best in your reno. I will update mine once things are in progress again. All henners club members can gather once we have done up our place. Cheers William Share this post Link to post Share on other sites
momo13 0 Report post Posted December 16, 2009 Hi Rey, How's things going sorry MIA for a while as my reno is having some hiccups so have to spend time remedy the issue before it can progress further... Glad that your reno is going well, all the best in your reno. I will update mine once things are in progress again. All henners club members can gather once we have done up our place. Cheers William Yup william, it had been a long time since u updated on ur blog Bro... How is everything so far...Never see you update your progress for so many days liao... The plumbing work settle liao or not? Checkout my blog for the flooring picture updates... cheers hi danny, after much discussion, the water pipes issue have been settled.. friday the city gas people will come and install the piping.. now awaiting for false ceiling and L box, carpenter was also there yesterday to confirm kitchen cabinets dimension, MBR wardrobe, shoe cabinet and tv console that will take 2 weeks to manufacture. left only to give the painting colour code to henry.... Share this post Link to post Share on other sites
momo13 0 Report post Posted December 16, 2009 anyone been to golden leaf @ whampoa drive for curtains or blinds? any advice? anyone? was quoted 200+ for a "tana??" roller blind system with black out fabric for my utility room.. is it expensive? they do have the takachiwa (jap brand) system but forgotten abt the price.. Share this post Link to post Share on other sites
momo13 0 Report post Posted December 29, 2009 (edited) mini update.... lights partially installed... will let the 'pigs' do the talking Common BR Kitchen Dinning area Living area without T5 yet Edited December 29, 2009 by momo13 Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted December 29, 2009 looking good. Now left what thing to finish ? Share this post Link to post Share on other sites
momo13 0 Report post Posted December 29, 2009 looking good. Now left what thing to finish ? should be left kitchen cabinets, tv console, mbr wardrobe, sliding glass panel, window grilles, main gate , main and room doors, pd door and some other misc stuffs which will be only be delivered next week.. sounds alot... scary Share this post Link to post Share on other sites
SGBuzz 0 Report post Posted December 29, 2009 mbr toilet tiles: We choose the same tiles as you but ran out of guts to make the whole toilet like that. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted December 29, 2009 should be left kitchen cabinets, tv console, mbr wardrobe, sliding glass panel, window grilles, main gate , main and room doors, pd door and some other misc stuffs which will be only be delivered next week.. sounds alot... scary I think the cabinet already make in factory. Just need 1-2days to install. Dun worry too much Share this post Link to post Share on other sites
dmay 0 Report post Posted December 29, 2009 should be left kitchen cabinets, tv console, mbr wardrobe, sliding glass panel, window grilles, main gate , main and room doors, pd door and some other misc stuffs which will be only be delivered next week.. sounds alot... scary Actually not bad liao, you started in Nov... I start in Oct and the hse is still not ready And consider I only doing toilet + balcony + kitchen Share this post Link to post Share on other sites
momo13 0 Report post Posted December 29, 2009 Actually not bad liao, you started in Nov... I start in Oct and the hse is still not ready And consider I only doing toilet + balcony + kitchen Hi dmay, how come? from ur blog, i was still thinking ur has already completed... Share this post Link to post Share on other sites
coffee_o 1 Report post Posted December 30, 2009 (edited) Wah bro long time nvr heard from you leh how are you ?? anyway your house looking good love your kitchen leh open concept + the wall tiles very chio :good: Edited December 30, 2009 by coffee_o Share this post Link to post Share on other sites
dannywmp 3 Report post Posted December 30, 2009 Hello Bro, Look time never see your updates...anyway me too, not been updating my blog for a week liao.Super busy with unpacking and DIY some stuff... Your house looks good...Carpentry work very fast one lah...My kitchen cabinets only take 1 day...so no worries. Grill...few hours... But all u need to do is making sure that you schedule them properly... Share this post Link to post Share on other sites