Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
doremon2009

D'amour ~ A Home With Peace,love ,happiness And Good Blessing.

Recommended Posts

  kaori89 said:
Compared quotes from 3 sources for Curtains. 2 of them gave me around $1400-$1500 and the cheapest one(without compromising quality) is $920. Happy. :)

Anyone interested can pm me for contact. =)

By the way, anyone got cheap and good recommendation for 1) acid wash, 2) spraypaint services for my dressing table? Thanks much.

Hi Kaori,

Thanks for drop by here : )

So your curtains.. are meant for what and how many?

I need lots of curtain stuffs.. at least for all rooms windows + balcony blind + all doors + etc..

Can PM me the contact? Thanks!

Er.. for acid wash and paint.. for me.. it's within the renovator service .. unless he didn't deliver satisfactory service then will need to engage seperately with immediate action.. ie plan B.. which I'd yet to source. If you do get one pls PM me too : )

Hi all who happen to read this are welcome to advise too : )

Thanks!

PS: As my new house dateline is very tight and strictly abide..no delay permissable.. the after effect of the saga from the old house transaction ..we are now suffering more than thousands dollars damage per WEEK!!The clock is really ticking very loud..We need to move to the new house asap!

Edited by doremon2009
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
  ossify said:
doremon, what's your contractor's name/company name?

Don't think I will publish the name here at this juncture.. unless this company complete the work with good workmanship and it is worth recommending or definitely I hope not.. the total reverse..

Therefore, at this premature stage seems a bit inappropriate. Hope you understand : )

All I can share here is this contractor/company is not in any of this T-blog , Renotalk forum.. as I also can't find it when I was trying to do research of this contractor/company.

Anyway, this contractor already shared that mine is the last project he will accept till he finishes some projects on hand.

ie He will only accept new project when he got sufficient bandwidth and manpower.

 

Share this post


Link to post
Share on other sites
  doremon2009 said:
Don't think I will publish the name here at this juncture.. unless this company complete the work with good workmanship and it is worth recommending or definitely I hope not.. the total reverse..

Therefore, at this premature stage seems a bit inappropriate. Hope you understand : )

All I can share here is this contractor/company is not in any of this T-blog , Renotalk forum.. as I also can't find it when I was trying to do research of this contractor/company.

Anyway, this contractor already shared that mine is the last project he will accept till he finishes some projects on hand.

ie He will only accept new project when he got sufficient bandwidth and manpower.

good luck in your reno ahead! hope you will have good review of your contractor in due course... :D

 

Share this post


Link to post
Share on other sites
  doremon2009 said:
Hi Kaori,

Thanks for drop by here : )

So your curtains.. are meant for what and how many?

I need lots of curtain stuffs.. at least for all rooms windows + balcony blind + all doors + etc..

Can PM me the contact? Thanks!

Er.. for acid wash and paint.. for me.. it's within the renovator service .. unless he didn't deliver satisfactory service then will need to engage seperately with immediate action.. ie plan B.. which I'd yet to source. If you do get one pls PM me too : )

Hi all who happen to read this are welcome to advise too : )

Thanks!

PS: As my new house dateline is very tight and strictly abide..no delay permissable.. the after effect of the saga from the old house transaction ..we are now suffering more than thousands dollars damage per WEEK!!The clock is really ticking very loud..We need to move to the new house asap!

Hiya

the quote covers

1) living room, semi circle balcony, double curved tracks, day(stripe/semi-transparent design) and night curtains, 80% blackout..around 3.5m bah.

2) master bed room, night curtains only, around 80% blackout. With some simple prints. 3m.

3) Roman blinds(same material as 2), half length. 3m(hence 2 sets).

4) For walk-in-wardrobe hallway, 1.2m wide, full length. (same material as 2)

So far, their service are quite okay. Haven put up the curtains though coz reno not done yet.

But should be 1 of the cheapest around. =) He's recommended by my friend. If you're interested then PM me.

Wish u good luck

Edited by kaori89
 

Share this post


Link to post
Share on other sites
  kaori89 said:
Hiya

the quote covers

1) living room, semi circle balcony, double curved tracks, day(stripe/semi-transparent design) and night curtains, 80% blackout..around 3.5m bah.

2) master bed room, night curtains only, around 80% blackout. With some simple prints. 3m.

3) Roman blinds(same material as 2), half length. 3m(hence 2 sets).

4) For walk-in-wardrobe hallway, 1.2m wide, full length. (same material as 2)

So far, their service are quite okay. Haven put up the curtains though coz reno not done yet.

But should be 1 of the cheapest around. =) He's recommended by my friend. If you're interested then PM me.

Wish u good luck

Hi thanks kaori ; )

Got your PM already..

 

Share this post


Link to post
Share on other sites
  joseeng said:
good luck in your reno ahead! hope you will have good review of your contractor in due course... :D

Hi Thanks for the best wishes ; )

How is the progress from your side?

Today when I went up to the new house, the electrician has done the wiring already..

Target to have the laminate flooring for the rooms done by next week..

 

Share this post


Link to post
Share on other sites
  ossify said:
pictures :D

Ya.. been in mad rush all this while.. yet to be able to organised to upload pictures..haha..

Will sure upload when have more breather of time ; )

By the way, been started to pack the whole house .. throw away lots of those old time cassette, video nice collection.. heart pain.. anyway hard to find player to play these these day..

 

Share this post


Link to post
Share on other sites

Just some quick update on the 'amazing race' with both my side and my dear renovator..

Yesterday when I went up to the new house, the electrician has done the wiring already..

Have made arrangement that electrician comes 2 times ie 1st time to do up the wiring, 2nd time to install the light.

Likewise, the aircon arrangement next Mon will do the piping till the tail end of renovation then install the aircons.

As for painting, the renovator has arranged the 1st base coat to be paint on next Tue..before Laminate flooring done up.

And 2nd & 3rd coat after laminate flooring done up. Reason given ..gosh.. been so forgetful... can't recall what he told me..should sound convincing then..something like paint work will be more complete and better.. as I was trying check with him any possibility to do all painting first then the laminate flooring as I fear that the paint will drip..then the renovator also assured that they will ensure flooring are covered properly then paint the wall..

Need to inform the renovator what are the paint colors we have finalised by this TODAY!!..

Target to have the laminate flooring for the rooms done by next week..

Window grills installation after all the above done.

Gosh yesterday was the mad rush to shop for the lightings..has walked from one end to the other end of Balestier haha..but finally got it all purchased..yea! Achieved that within 4hours!!

But forgot to get door bell, and realised that we bought extra 1 light..

Think need to settled the extra light on TODAY for exchange of other things..

I really dont like to do things in tight schedule and in mad rush.. but too bad.. time is not at our side..

Now can only do my utmost best within my limits.. really xiong and tiring..

Gosh! Packing the whole house alone really a big chore.. backache..

Edited by doremon2009
 

Share this post


Link to post
Share on other sites

Pai Seh.. Pai Seh.. been too busy and tight up .. that's why MIA for long time..

Time just move super fast!! Yet there are still so many things need to work on it..

Moving house and doing up a new house is really 'Siong'..

Here I am trying to upload the photos. Urm.. not very good photo skills..but better than nothing to see la ..haha!

Will start with the original state of house..

 

Share this post


Link to post
Share on other sites

Hi,

These photos are before renovation ie the original state

Nov 2009 Photos are as follows :-

Main Door

IMG_9094.jpg

IMG_9093.jpg

IMG_9090.jpg

More photos forthcoming..

Edited by doremon2009
 

Share this post


Link to post
Share on other sites
  doremon2009 said:
Will con't to upload the photos.. now very tired..need to sleep..

looks like your flooring's still not done yet.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×