sanpokchubby 0 Report post Posted December 22, 2009 (edited) Hacking begins on 14/12/09 to 18/12/09 Some photos View from Kitchen MBR Common BR Edited January 1, 2010 by sanpokchubby Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted December 22, 2009 (edited) Photos taken on 18/12/09 Good News to know that the ugly pillar (now I know it is called stiffener) can be hacked. Will go down tonight to see if it is hacked already. Tiling should have also begun yesterday. Edited January 1, 2010 by sanpokchubby Share this post Link to post Share on other sites
ossify 1 Report post Posted December 22, 2009 hmm why not add the photo into your post Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted December 22, 2009 hmm why not add the photo into your post got leh. Have to click the link to see... not sure how to post so that it can be seen directly Share this post Link to post Share on other sites
CJREDDEVIL 0 Report post Posted December 22, 2009 Been so caught up with work that haven't had time to update! 01/12/09 - Got my keys on 1 Dec 09 07/12/09 - Confirmed contractor, IDS Interior Furnishing Pte Ltd (recommended by my client) (1st payment of $2000) 11/12/09 - Select tiles 14/12/09 - Start hacking 18/12/09 - Hacking completed and tiles delivered (2nd payment of $9000) Items purchased so far Gain City 17/12/09 - Panasonic System 2 unit with piping & stainless steel bracket (Model: CU-2C18EKH) Kong Tai Electrical Trading 18/12/09 - Super gd price! - Mitsubishi Fridge (Model: MR-F42U Gold) - Electrolux Washer (Model: EWF8576) - Turbo Gas Stove (Model: 703VTSC LPG Black) - Turbo Cooker Hood (Model: TC2-90SS) - Panasonic 37" LCD TV (Model: TH-L37X10) - 707 Water Heater (Model: Compact) hello chubby.... Congrate to your new hse and the start of reno. Doing a major reno? Cheers! Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted December 30, 2009 Yesterday, contractor brought me to a very lok pok shop at Bukit Panjang to buy toilet and kitchen stuff (i.e. basins, sinks, WCs). Price cheaper than those Hoe Kee , Sim Siang Choon at IMM. Spent $880 in all! Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted December 30, 2009 hello chubby.... Congrate to your new hse and the start of reno. Doing a major reno? Cheers! Hi! Should be considered quite major ba ... hacking away everything... Share this post Link to post Share on other sites
ossify 1 Report post Posted December 30, 2009 Yesterday, contractor brought me to a very lok pok shop at Bukit Panjang to buy toilet and kitchen stuff (i.e. basins, sinks, WCs). Price cheaper than those Hoe Kee , Sim Siang Choon at IMM. Spent $880 in all! Contact please! Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted December 30, 2009 Contact please! Its called Chye Sheng Hardware Ptd Ltd opposite 10 mile junction. Tel: 67625055 But warning first, it doesn't have a lot of choices but if you are looking for the basic items, it should serve you well. Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted January 1, 2010 Hi! Went down to Balestier to shop for lights today. After walking into many shops, we ended up buying from STRASS Lightings because the prices seemed much lower. However, after coming back and viewing the forums, seems that that is many negative comments on them! I bought $430 worth of items from them which includes - 2 nos of round lights for kitchen - 2 nos of rectangular lights for 2 bedrooms - 2 nos of smaller rectangular lights of 2 bathrooms (similar to bedroom ones, except smaller - 8 nos of 13w x 2 round downlights for living room (he quote $15 per pc) ` I am pretty worried abt all the comments but my hubby says as long as the shell (the light itself) is ok, the bulbs (even if lousy quality) can be replaced. I hope he is right!! As for their service and delivery, i have to cross my fingerS and pray it is ok. Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted January 1, 2010 Hai, pillar in the middle of the house still cannot hack. HDB request for PE endorsement which means I have to pay another $650. In process for about 1 week already, so hopefully can pass by next week. Contractor seems quite confident can passed though. If cannot, means the whole layout have to be changed. Photos taken on 24 Dec Laying of tiles for MBR toilet Photos taken on 31 Dec Tiles laid for common toilet Tiles laid for kitchen Concrete base for washing machine Tiles laid for bedroom floors Share this post Link to post Share on other sites
rainbowgal 0 Report post Posted January 1, 2010 hi sanpokchubby.. great to see ur reno process is progressing quite well... juz a note: the fridge base looks slanted to me.. not sure if it is because of the photo angle.. Share this post Link to post Share on other sites
Mickey M 0 Report post Posted January 1, 2010 hi sanpokchubby.. great to see ur reno process is progressing quite well... juz a note: the fridge base looks slanted to me.. not sure if it is because of the photo angle.. Yup, I also think so. Other than that, everything is progressing well I believe. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted January 1, 2010 Hi! Went down to Balestier to shop for lights today. After walking into many shops, we ended up buying from STRASS Lightings because the prices seemed much lower. However, after coming back and viewing the forums, seems that that is many negative comments on them! I bought $430 worth of items from them which includes - 2 nos of round lights for kitchen - 2 nos of rectangular lights for 2 bedrooms - 2 nos of smaller rectangular lights of 2 bathrooms (similar to bedroom ones, except smaller - 8 nos of 13w x 2 round downlights for living room (he quote $15 per pc) ` I am pretty worried abt all the comments but my hubby says as long as the shell (the light itself) is ok, the bulbs (even if lousy quality) can be replaced. I hope he is right!! As for their service and delivery, i have to cross my fingerS and pray it is ok. Jus check properly lor . When I buy my coffee table from mode studio , i also dun know that they are from red apple . Worried for 1 month after I read abt bad comment . So what I do is , I call them 1 week b4 delivery date to confirm delivery and check all my stuff property upon arrival . Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted January 1, 2010 hi sanpokchubby.. great to see ur reno process is progressing quite well... juz a note: the fridge base looks slanted to me.. not sure if it is because of the photo angle.. the angle itself is not a 90 deg angle... think it is more than 90 deg, hence, look slanted. My place is full of odd angles Share this post Link to post Share on other sites