Supersimon27 2 Report post Posted September 23, 2009 i just got a quote from an ID. Breakdown are as follows. Any comments...plsss..... Design & Services Interior and space planning Design services Interior Design and Space Planning Floor Plan Layout Perspective Drawing Material & Colors Proposal & Selection Site Coordination & Supervision Application of HDB Renovation Permit Hacking & Demolition Works To Supply Labour & Tools to Hack Away: Floor tiles for living & Dining Halls Floor tiles for 3 bedrooms Floor & Wall tiles for kitchen Floor & Wall tiles for common toilet Floor & Wall tiles for MBR Toilet$1800 Dismantle Existing Cabinet for whole house $150 To demolish wall at top of door entrance for 3 bedroom and store. (old door frame is arc type. Want to change to square type door frame) To hack away tiles inside store room. (ex owner Indian, altar inside storeroom) $350 Masonry Works To waterproof Kitchen $200 Master bathroom $100 Common bathroom $100 To supply & install ceramic wall tile up to ceiling height Kitchen (expose area only) $1680 Master bathroom $1435 Common bathroom $1400 (this does not include those designer tiles) To supply & install homogenous non slip Kitchen $1200 Master bathroom $500 Common bathroom $450 To supply & install homogenoue tiles Living & Dining Area&Bedroom $5850 To do base for kitchen cabinet $250 To do base for fridge & WM $160 To supply & Install SS Pipe Kitchen & 2 Bathroom $580 To Supply Labour Only to Install Kitchen Sink & Tap $80 Washing Machine Taps $60 2 pedestal pans $160 2 basin & taps $120 2 water heater $140 2 Shower sets $120 2 bidet spray & valve $100 2 toilet accessories $100 Ceiling works To supply and install false ceiling @living and store entrance $600 L box for living & dining $480 Painting whole House $1200 Painting door frame, door, Pipe and gate $200 TO supply install sliding windows ****, dining & MBR $1400 To suppy install casement windows At kitchen & Bedroom 3 $638 To supply install Louver windows At 2 toilet $240 To supply install anodized windows Grill house $1014 Wood stuff & door Supply install door frame At bedroom & Store 4 no $720 Supply install veneer door & lock 4 nos $1360 Supply install Wrought iron gate $450 Kitchen cabinet 47.5 feet $4988 SS cutlery tray $150 Supply install wardrobe 8Ft $1800 Solid surface $1875 Houlage Debris $800 Total $32866 And plus GST $35166 water proof / painting / ceiling look expensive to me GST turn out to be 2k + . Can ask him to discount ? Usually contractor can offset that away Share this post Link to post Share on other sites
samdolmat 0 Report post Posted September 24, 2009 Erhmm.....cannot say here 1, shssh wait the moderator stop our T-Blogs huh can pm where the story continue Share this post Link to post Share on other sites
samdolmat 0 Report post Posted September 24, 2009 water proof / painting / ceiling look expensive to me GST turn out to be 2k + . Can ask him to discount ? Usually contractor can offset that away i was thinking about getting uncle ahsoon.. but i am afraid he cannot fullfill the target deadline of 5 weeks. anyone got any suggestion or recommendation Share this post Link to post Share on other sites
vio.ple 0 Report post Posted September 24, 2009 hi samdolmat, congrats on your new home! where are you staying? really have to spend some time designing.. anyway i'm engaging jason to do my house.. he told us normally he'll take about 6 weeks.. not sure whether he is able to finish in 5 weeks.. you have to check with him.. Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted September 24, 2009 i was thinking about getting uncle ahsoon.. but i am afraid he cannot fullfill the target deadline of 5 weeks. anyone got any suggestion or recommendation u want to try my contactor ? Share this post Link to post Share on other sites
samdolmat 0 Report post Posted September 24, 2009 (edited) sure pm the HP nomber and your quatation if possible Edited September 24, 2009 by samdolmat Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted September 24, 2009 sure pm the HP nomber and your quatation if possible Pm send Share this post Link to post Share on other sites
ngcg 0 Report post Posted December 1, 2009 Hi Sam, long time no update, how is the renovation work? can let me know how much you brought the house? Thanks Share this post Link to post Share on other sites
Supersimon27 2 Report post Posted December 2, 2009 Hi Sam, long time no update, how is the renovation work? can let me know how much you brought the house? Thanks If i'm not wrong he got chew to do his house I still keep in contact with Abul Share this post Link to post Share on other sites
samdolmat 0 Report post Posted December 4, 2009 sorry been buzy working and preparing all stuff that i forgot to update my blog. here are b4 reno pic Share this post Link to post Share on other sites
samdolmat 0 Report post Posted December 4, 2009 The First day of work has begun...that is on the 9 Nov 09... Hacking taking three days... no need so many pics lah.. all hacking same... Share this post Link to post Share on other sites
samdolmat 0 Report post Posted December 4, 2009 Hi Sam, long time no update, how is the renovation work? can let me know how much you brought the house? Thanks sooryyy me buy for 295 + 8 Share this post Link to post Share on other sites
samdolmat 0 Report post Posted December 4, 2009 on the 12- 14 Nov, cement stuff comes...cement works doing... Share this post Link to post Share on other sites
samdolmat 0 Report post Posted December 4, 2009 and on 16 nov to 25 nov tiling works are done.. here are some of the pic while tiling ongoing.. sorry will upload latest pics tomolo.. now stress to liase with movers Share this post Link to post Share on other sites