lionbo 0 Report post Posted September 14, 2009 hi, condos i understand not many 'packages'. can i know isit condos are much more expensive to do for the same work as say a 4 room hdb? same size, same work to be done.. why is condo so much more? if a hdb id package is 15k. What is the equivalent for condo? 18? 20? thanks for answering and helping me understand Share this post Link to post Share on other sites
blackcar 0 Report post Posted September 14, 2009 hi, condos i understand not many 'packages'. can i know isit condos are much more expensive to do for the same work as say a 4 room hdb? same size, same work to be done.. why is condo so much more? if a hdb id package is 15k. What is the equivalent for condo? 18? 20? thanks for answering and helping me understand Err its all depends what kinda of work, material and design etc for the renovation. A simple 3 room can cost an arm or a leg too. Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted September 15, 2009 hi, condos i understand not many 'packages'. can i know isit condos are much more expensive to do for the same work as say a 4 room hdb? same size, same work to be done.. why is condo so much more? if a hdb id package is 15k. What is the equivalent for condo? 18? 20? thanks for answering and helping me understand There is a 20% different due to the districted working hour in condo, hope i answered your question Share this post Link to post Share on other sites
lionbo 0 Report post Posted September 15, 2009 There is a 20% different due to the districted working hour in condo, hope i answered your question oic... meaning the condo workers have to work harder ( more manpower)? what if i don't have a strict time frame, say the workers can work longer no problem, from your experience , is this 20% markup negotiable? thanks Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted September 15, 2009 oic... meaning the condo workers have to work harder ( more manpower)? what if i don't have a strict time frame, say the workers can work longer no problem, from your experience , is this 20% markup negotiable? thanks it's depend on the reno company, but for i have experienced, time frame without distriction were impossible. good luck to you. Share this post Link to post Share on other sites