coffee_o 1 Report post Posted September 7, 2009 Hi Hi Hi Been lurking around the forum for months so I guess it's about time that I should start my blog since everyone is asking about it. The reason why I took so long to start one is due to that fact that my renovation will only start in Nov and other than the contractor, I've yet to finalize anything. Anyway I would like to take this opportunity to thank Fannie for letting us view her beautiful home and give me advices whenever I have doubts. So to cut story short, below is my floor plan: Oh btw I've engaged Jason to overhaul my whole house. Which I believe he will do a good job hehe Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 Since I have not collected my keys, I can only post pre-reno pics which I've scanned from the val report. One of the common bedroom Another common bedroom Living Room Kitchen By looking at the pic, I believe you guys will know the reason why I will be doing a major overhaul of the whole house Share this post Link to post Share on other sites
ivy 0 Report post Posted September 7, 2009 1 kopi-o siew tai pls! Share this post Link to post Share on other sites
familyof4 0 Report post Posted September 7, 2009 (edited) teh-c please! btw, wat is the status of u wanting to buy ur recess? Edited September 7, 2009 by familyof4 Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 1 kopi-o siew tai pls! Sorry wor mine trying to improve the image of coffee shop, so my coffee shop only provide cappuccino, latte, cheese cakes...etc leh no kopi siew tai wor Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 teh-c please! btw, wat is the status of u wanting to buy ur recess? My recess area till now, no sound no picture from HDB eversince I submitted the form sigh...... Share this post Link to post Share on other sites
adrian_john 1 Report post Posted September 7, 2009 Congrats Coffee_O. Cute pic of your doggie there! Look forward to seeing the transformation of your coffee shop. Can I place advance order for 1 hot chocolate with marshmallows then? Share this post Link to post Share on other sites
Planfor2 0 Report post Posted September 7, 2009 Serve me americano, please. glad u start ur blog... look forward to ur reno progress. Share this post Link to post Share on other sites
ivy 0 Report post Posted September 7, 2009 Sorry wor mine trying to improve the image of coffee shop, so my coffee shop only provide cappuccino, latte, cheese cakes...etc leh no kopi siew tai wor aiyoh like that de ahh? no kopi-o siew tai and loti kaya also dun hv lah?? ok lor i upgrade image I'll like to have a latte with a newyork cheesecake pls. when getting keys? Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 Congrats Coffee_O. Cute pic of your doggie there! Look forward to seeing the transformation of your coffee shop. Can I place advance order for 1 hot chocolate with marshmallows then? Hi Adrian Thanks thanks, hope I dun disappoint you since I have absolutely no design sense hahaha I shall reserved one hot choco with marshmallows for you when my kopitiam is officially open Serve me americano, please. glad u start ur blog... look forward to ur reno progress. Hi Plan, ya someone kept asking when I will start wor so started on it eventhough I have nothing much to write abt aiyoh like that de ahh? no kopi-o siew tai and loti kaya also dun hv lah?? ok lor i upgrade image I'll like to have a latte with a newyork cheesecake pls. when getting keys? Sorry you went to the wrong tiam liao, that one belongs to N.Y.D.C nia, me no have hahaha 1st appt is on the 8th next mth, but had an agreement with the seller that I can proceed with my reno once we received the sales approval from HDB. Therefore hopefully I can start my reno latest by Nov Share this post Link to post Share on other sites
ivy 0 Report post Posted September 7, 2009 aiyoh simi also dun have.... how to do biz like that or is it u selectively choose which customer to serve huh??? hor hor, guilty hor! Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 aiyoh simi also dun have.... how to do biz like that or is it u selectively choose which customer to serve huh??? hor hor, guilty hor! Aiyah, no le 大人冤枉 ah ! I where got choose customer, moreover there're 1001 Ivy here leh so if I dun serve Ivy hor I will lose alot of customer leh Just that newyork cheesecake belong to NYDC mah so cannot copy them else kena sue leh I got coffee_o cheesecake nia, nice leh black black color like coffee_o de and only got coffee taste no cheese taste de hahahaha Share this post Link to post Share on other sites
familyof4 0 Report post Posted September 7, 2009 My recess area till now, no sound no picture from HDB eversince I submitted the form sigh...... bring yoshi along and ask her to show her charm to the officer hmm...my fave oreo cheese cake have bo? with a cuppa hot chocolate ya? Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 (edited) bring yoshi along and ask her to show her charm to the officer hmm...my fave oreo cheese cake have bo? with a cuppa hot chocolate ya? Wei wei wei Yoshi is a he leh not her le though my wife made him a eunuch le:( Anyway whatever you order sure have de hahahaha Oops am i showing favoritism ? *whisper to F4* Dun let Ivy see this hor, else she sure unhappy de Edited September 7, 2009 by coffee_o Share this post Link to post Share on other sites
coffee_o 1 Report post Posted September 7, 2009 Ok just in case anyone asked what I will be doing Below are the list of items I'm doing: DEMOLITION WORKS ALL Hack floor tiles KITCHEN Hack wall tiles 2 TOILETS Hack floor and wall tiles MASTER BEDROOM Hack wardrobe, false ceiling ALL BEDROOMS Remove bedroom doors ALL Haulage MASONRY LIVING ROOM & DINNING AREA Supply and lay 600mm X 600mm homogenous floor tiles 3 TOILETS Supply and lay wall tiles 3 TOILETS Supply and lay floor tiles (includes waterproofing) KITCHEN Supply and lay wall tiles KITCHEN Supply and lay floor tiles BALCONY Supply and lay floor tiles 2nd FLOOR LANDING Redo 2nd floor flooring to parquet (walkway and staircase) WOODWORKS & WETWORKS TOILET Supply and install glass shower screen 2 TOILETS (UPSTAIRS) Supply and install vanity top complete with mirrors MAIN DOOR, 4 BEDROOMS Supply and change wooden door (include lock) with S/S MAIN DOOR Supply and change wooden door (1/2 hr fire-rated, include lock) 3 TOILETS Supply and change aluminium bifold door KITCHEN, LIVING Supply and install glass divider door (Tempered glass) CARPENTRY KITCHEN 20ft bottom kitchen cabinet (top and bottom) KITCHEN Supply and install granite table top 12ft MASTER BEDROOM Design and build 8ft wardrobe MASTER BEDROOM Design and build bedside table and bedhead BEDROOM 2 Design and build 8ft book cabinet BEDROOM 2 Design and build 11ft study table LIVING ROOM Design and build TV Console LIVING ROOM Design and build 13ft shoe/storage cabinets along dining area below windows PAINTING WORKS ALL Plaster wall ALL ICI/NIPPON PAINT for all internal wall and ceiling PLUMBING 3 TOILETS Supply labour to install three toilet bowls ALL Supply and install stainless steel hot and cold water pipings OTHERS KITCHEN Supply and install stainless steel rubbish chute ALL Supply and install false ceiling (include balcony) ALL Supply and install aluminium window grills c/w white powder coating (exclude balcony) ALL Supply and install aluminium windows c/w white powder coating (include balcony) LIVING ROOM Supply and install iron-wrought gate ROOF Replace balcony roof with polycarbonate roofing STAIRCASE Redo staircase handrail with metal frame and tempered glass panels ALL Cleaning and Chemical Wash ELECTRICAL ALL Supply and rewire ALL ceiling light points and electrical points (40pts) ALL Supply and install 4 SCV point ALL Supply and install 2 telephone point Share this post Link to post Share on other sites