wtc 0 Report post Posted August 28, 2009 Need help!!! I am not overhauling my new flat, the major reno are the toilet, wardrobe, laminate floor and AC. Since I don't have ID to manage my reno, I need to schedule everything myself. I was thinking I should schedule like this: 1. Toilet 2. Painting 3. Laminate floor 4. Closet/wardrobe So, wondering where do I put AC? During Toilet? After the flooring, before or during Share this post Link to post Share on other sites
ivy 0 Report post Posted August 28, 2009 i suggest after painting but before flooring. After painting - so that the back of the air con unit, trunking all will be painted. Before flooring so that the air con contractor won't scratch ur floor. just a suggestion Share this post Link to post Share on other sites
yoongf 11 Report post Posted August 28, 2009 AC before toilet. AC got condensate water pipe to install. Embedding into the screed looks neater. AC got trunking that may need to be painted. Share this post Link to post Share on other sites