Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
LQSL

- Our Shelter - 我们的 “避风港"

Recommended Posts

Hi Lord Vader,

If I am not wrong, it means the flame ignitor is operated by battery.

We too didnt noticed this during our hob purchase. It's only when my electrician is doing up the wiring that he asked us whether he need to run an extra point for the hob. We got no idea. But the lucky part is... our contractor told us to deliver our stuff early, so the electrician is able to open up the box to check for us. :D

Ya, think no electrical point is needed with this :)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Tomorrow will be the starting of the renovation. Hope everything goes well.. More photos will be up soon ^.^

New Update : Bed Purchased.

Englander 15" mattress (they say it is their highest range mattress) and the emporer bedframe and divan.. Hope I didnt make a wrong choice!

how much is your mattress.

Went to do a recce, mattress 14" and above, all bedsheets ex ex leh... :o

really must buy when there's sale..

 

Share this post


Link to post
Share on other sites
how much is your mattress.

Went to do a recce, mattress 14" and above, all bedsheets ex ex leh... :o

really must buy when there's sale..

My mattress after "squeeze out" discount is less than 3K with very tall leather bedhead and divan set.. Lol..

Englander NaturalTech 4.. They say its their highest bed range already..

 

Share this post


Link to post
Share on other sites

2nd Bedroom Aircon Piping - The only piping in the common rooms.

P1090649.jpg

1st Bedroom Aircon Location (Same as the masterbedroom aircon location)

P1090650.jpg

Aircon pipes coming out of the common toilet

P1090651.jpg

Master Bedroom Aircon Pipings

P1090655.jpg

 

Share this post


Link to post
Share on other sites

Homogenous Tiling works all done. Left with laminated floorings for bedrooms.

P1090657.jpg

P1090661.jpg

Wall Colors Choosen

SL-Wall-Colors.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Homogenous Tiles after Acid Wash

P1090707-1.jpg

False Ceiling with Lightings Installed

P1090710-1.jpg

Kitchen Light

P1090714-1.jpg

Dining Light

Untitled-1-1.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites
hi!

Your quotation seems quite low for so many things. Mine is 3rm flat and but some quotation came back about 25k lioaz.

How's the service and workmanship so far?

hihi, so far not bad.. can say to be 95%, next up with be my supreme flooring and my carpentary.

Hope it can still hit the 95% range.. Lol..

Ya, my id quote me quite a reasonable price, I went down to at least 15 companies, out of so many, I selected Ken Home Design (Thomas) cos I find him more earnest.. Unlike some other IDs, everything also say OK, everything also add $$$, most are empty say only..

If my carpentary are up to my expectation, will surely recommend him in this forum.. Wait for my pictures ba! :)

 

Share this post


Link to post
Share on other sites
hihi, so far not bad.. can say to be 95%, next up with be my supreme flooring and my carpentary.

Hope it can still hit the 95% range.. Lol..

Ya, my id quote me quite a reasonable price, I went down to at least 15 companies, out of so many, I selected Ken Home Design (Thomas) cos I find him more earnest.. Unlike some other IDs, everything also say OK, everything also add $$$, most are empty say only..

If my carpentary are up to my expectation, will surely recommend him in this forum.. Wait for my pictures ba! :)

Great! Keep us posted! :)

 

Share this post


Link to post
Share on other sites

Supreme Laminated Flooring Up + 1st coat of painting done, very dusty..

Bedroom Walkway

P1090722.jpg

Master Bedroom

P1090730.jpg

Bedroom 1 : As big as Master Bedroom

P1090731.jpg

Bedroom 2 : Medium Room

P1090734.jpg

Bedroom 3 : Smallest Room

P1090738.jpg

 

Share this post


Link to post
Share on other sites

Shoe Cabinet (90% Completed) - Still got a lot of dark finger prints left on the white laminates

P1090774.jpg

P1090802.jpg

P1090786.jpg

Solid Ply Wood Used

P1090779.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Living Room Feature Wall (60% Completed)

P1090797.jpg

P1090808.jpg

P1090791.jpg

P1090811.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Bomb Shelter + Dining Feature Wall Backing

P1090883.jpg

90% Done Living Room Feature Wall + Console

P1090884.jpg

Kitchen + Dining Area 40% Done

P1090885.jpg

P1090889.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×