LQSL 0 Report post Posted September 14, 2009 Hi Lord Vader, If I am not wrong, it means the flame ignitor is operated by battery. We too didnt noticed this during our hob purchase. It's only when my electrician is doing up the wiring that he asked us whether he need to run an extra point for the hob. We got no idea. But the lucky part is... our contractor told us to deliver our stuff early, so the electrician is able to open up the box to check for us. Ya, think no electrical point is needed with this Share this post Link to post Share on other sites
dyleen 0 Report post Posted September 14, 2009 Tomorrow will be the starting of the renovation. Hope everything goes well.. More photos will be up soon ^.^ New Update : Bed Purchased. Englander 15" mattress (they say it is their highest range mattress) and the emporer bedframe and divan.. Hope I didnt make a wrong choice! how much is your mattress. Went to do a recce, mattress 14" and above, all bedsheets ex ex leh... really must buy when there's sale.. Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 15, 2009 how much is your mattress. Went to do a recce, mattress 14" and above, all bedsheets ex ex leh... really must buy when there's sale.. My mattress after "squeeze out" discount is less than 3K with very tall leather bedhead and divan set.. Lol.. Englander NaturalTech 4.. They say its their highest bed range already.. Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 16, 2009 Door Kerb Done Ceiling Done Master Bedroom Pelmet Done Stainless Steel Pipes Changed Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 16, 2009 2nd Bedroom Aircon Piping - The only piping in the common rooms. 1st Bedroom Aircon Location (Same as the masterbedroom aircon location) Aircon pipes coming out of the common toilet Master Bedroom Aircon Pipings Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 16, 2009 (edited) Homogenous Tiling works all done. Left with laminated floorings for bedrooms. Wall Colors Choosen Edited September 17, 2009 by LQSL Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 28, 2009 (edited) Homogenous Tiles after Acid Wash False Ceiling with Lightings Installed Kitchen Light Dining Light Edited September 28, 2009 by LQSL Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted September 28, 2009 hi! Your quotation seems quite low for so many things. Mine is 3rm flat and but some quotation came back about 25k lioaz. How's the service and workmanship so far? Share this post Link to post Share on other sites
LQSL 0 Report post Posted September 28, 2009 hi! Your quotation seems quite low for so many things. Mine is 3rm flat and but some quotation came back about 25k lioaz. How's the service and workmanship so far? hihi, so far not bad.. can say to be 95%, next up with be my supreme flooring and my carpentary. Hope it can still hit the 95% range.. Lol.. Ya, my id quote me quite a reasonable price, I went down to at least 15 companies, out of so many, I selected Ken Home Design (Thomas) cos I find him more earnest.. Unlike some other IDs, everything also say OK, everything also add $$$, most are empty say only.. If my carpentary are up to my expectation, will surely recommend him in this forum.. Wait for my pictures ba! Share this post Link to post Share on other sites
sanpokchubby 0 Report post Posted September 29, 2009 hihi, so far not bad.. can say to be 95%, next up with be my supreme flooring and my carpentary. Hope it can still hit the 95% range.. Lol.. Ya, my id quote me quite a reasonable price, I went down to at least 15 companies, out of so many, I selected Ken Home Design (Thomas) cos I find him more earnest.. Unlike some other IDs, everything also say OK, everything also add $$$, most are empty say only.. If my carpentary are up to my expectation, will surely recommend him in this forum.. Wait for my pictures ba! Great! Keep us posted! Share this post Link to post Share on other sites
LQSL 0 Report post Posted October 1, 2009 Supreme Laminated Flooring Up + 1st coat of painting done, very dusty.. Bedroom Walkway Master Bedroom Bedroom 1 : As big as Master Bedroom Bedroom 2 : Medium Room Bedroom 3 : Smallest Room Share this post Link to post Share on other sites
LQSL 0 Report post Posted October 9, 2009 (edited) Balcony Light Edited October 9, 2009 by LQSL Share this post Link to post Share on other sites
LQSL 0 Report post Posted October 9, 2009 (edited) Shoe Cabinet (90% Completed) - Still got a lot of dark finger prints left on the white laminates Solid Ply Wood Used Edited November 13, 2009 by LQSL Share this post Link to post Share on other sites
LQSL 0 Report post Posted October 9, 2009 (edited) Living Room Feature Wall (60% Completed) Edited October 9, 2009 by LQSL Share this post Link to post Share on other sites
LQSL 0 Report post Posted October 14, 2009 Bomb Shelter + Dining Feature Wall Backing 90% Done Living Room Feature Wall + Console Kitchen + Dining Area 40% Done Share this post Link to post Share on other sites