Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
LQSL

- Our Shelter - 我们的 “避风港"

Recommended Posts

Side Note : All Photos are working fine. If the pictures cannot come out, you may right click "SHOW PICTURE" or copy and paste the pix link to another explorer :) Don't know why sometimes the pictures cannot show, sometimes can.. Lol.

EA 130sqm

Renovation Commencement Date 01.09.2009

ID Firm : Ken Home Design (Thomaz)

Projected Reno Cost : 33,310

525831900407_0_ALB.jpg

Preliminaries

Space planning and Furniture layout plan

Perspectives presentations

Materials selections / colour scheme proposal

Site coordination / supervision

Hacking Works

Dismantle & dispose existing toilet bowls & wash basins for 2 toilets

Dismantle & dispose existing aluminum louver window for service balcony

Hack off wall at study room x 11.5 feet

Dismantle existing door,door frame & partition wall at study room

Haulage & debris (uploading sand for living room)

Wet Works

Lay waterproof membrane for 2 toilets, service balcony & kitchen

Overlay homogenous floor tiles for 2 toilets (non-slip)

Ly homogenous floor tiles for kitchen & service balcony (non-slip)

Lay homogenous floor tiles for living/dinning area c/w skirting

Construct 50 mm ht base for fridge,washing machine & fridge

Construct 50mm shower kerb for master toilet

Construct main door kerb c/w homo tiles fininshes

Plumbering Works

Change stainless steel piping for 2 toilets ,kitchen & service balcony

Installation of 2(sit-sit) toilet bowl for 2 toilets

Installation of vanity basin/wall mounted basin

Lay inlet/outlet piping for kitchen sink,washing machine & 2 basins

Installation of 2 instant heater

Installation of all kitchen/toilet accessories

Supply 2 sets of Standard 7pcs toilet accessories

Carpentry Works

Fabricate kitchen cabinet c/w laminated ply,handles & ABS trimming x 12 feet (normal)

Fabricate kitchen cabinet c/w laminated ply,handles & ABS trimming x 10 feet (2 sided lamination)

Supply and install black galaxy granite worktop for kitchen cabinet x14 feet

Fabricate t/v feature wall **** area c/w laminated ply & glass panels x 8 feet

Fabricate t/vconsole c/w laminated ply **** room x 8 feet

Fabricate feature wall at household shelter c/w laminated tic-tac door x 5.5 feet

Fabricate full height shoe rack c/w settee c/w laminated ply **** room x 3 feet

Fabricate feature wall at dinning area c/w laminated ply & mirror panels x L-shape 5.5 feet

Fabricate t/v feature wall at master bedroom at outside toilet area c/w laminated ply x 7 feet

Fabricate t/v sideboard c/w laminated ply at master bedroom x 4 feet

Fabricate full height wardrobe at master bedroom c/w laminated ply x L-shape12 feet

Fabricate 1 queensize bedhead at master bedroom c/w laminated ply & cushion (half height)

Fabricate wall to wall vanity cabinet for master toilet c/w laminated ply x 5 feet

Supply & install wall to wall vanity mirror for master toilet

Supply & install laminated frame & glass panel for service balcony

Electrical Works

Lay wire looping for downlights x 35 points

Installation of all ceiling lights

Repositioning of 1 lighting switch & 1 SCV point

Ceiling Works

Supply & install false ceiling for foyer/dinning area & bedroom passageway

Supply & install L-box c/w coove light desingn for living area

Supply & install false ceing/ L-box c/w coove light design

Supply & install full height false wall **** room (4 feet t/v wall)

Supply & install partial false wall at study room(shift doorway)

Others

Supply & install 1 new wooden door frame at study room

Supply& install 4 veneer door c/w locksets

Supply & install 1 10mm tempered glass partition wall for master toilet

Supply & install 1 10mm tempered glass door for service balcony entrance

Supply & install tempered glass panel for kitchen cabinet ( 70 sq feet)

Overlay supreme laminated floorboard c/w wooden skirting for 4 rooms & bedroom passageway

Painting for the whole house c/w ICI/NIPPON PAINT emusion paint

Chemical washing for the whole house

Alteration of main gate

Edited by LQSL
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Pictures of my empty house.. sorry, taken with mobile phone, not so clear. Hehe.

View of my kitchen

930312900407_0_ALB.jpg

Space outside my kitchen

478312900407_0_ALB.jpg

Study Room

862032900407_0_ALB.jpg

Kitchen Service Balcony

377722900407_0_ALB.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Master Bedroom

577722900407_0_ALB.jpg

Master Bedroom Toilet

838591900407_0_ALB.jpg

Second Common Bedroom

294022900407_0_ALB.jpg

First Common Bedroom (Almost the same size as the master bedroom)

271532900407_0_ALB.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Living Room + Balcony

772902900407_0_ALB.jpg

Living Room + Bomb Shelter + Dining Room

908991900407_0_ALB.jpg

Edited by LQSL
 

Share this post


Link to post
Share on other sites

Proposed Layout Plan (Subjected to Changes)

285042900407_0_ALB.jpg

Glass Panel "Open Concept" Kitchen

Feature Wall - Master Bedroom

Feature Wall - Living Room 8Ft

Feature Wall - Bomb Shelter

Feature Wall - Dining Area

Edited by LQSL
 

Share this post


Link to post
Share on other sites
Congrats!

Any layout to share?

Nice big area.

Thanks! :) Was quite excited about the whole thing. Lol.

A lot of things are not finalised yet. *Faint*

Need to finish the whole reno by end Oct. Haha.. Pray hard

 

Share this post


Link to post
Share on other sites

Sofa from Uninnova (Sungei Kadut)

$1207

3 Seaters

Adjustable Headrest

Half Leather (Italy)

402891900407_0_ALB.jpg

Mitshubishi Fridge from Gain City

$999

2 Doors

510L

Graphite Grey

Mitshubishi StarMex Aircon from Creation Air

$1499 x 2

System II x 2 sets for 4 rooms

Edited by LQSL
 

Share this post


Link to post
Share on other sites
Gong xi gong xi

So you doing your reno now ? when you started de ?

Oct should be able to bah

Eh, haha, starting 1st September :) ID says enough time to complete.. Haha.. Hopes so!

 

Share this post


Link to post
Share on other sites
hey hey.. congrat. Must be very excited now. Going to choose your tiles on Sep soon?

Ya, Thanks! Tiles already chosen.. Starting to lay tiles on 1st Sept. Haven take the photos of the tiles yet.. Next week ba.. Lol

 

Share this post


Link to post
Share on other sites
Just to let everyone who need to purchase something for your new house know.

Mayer is having a warehouse sale this weekend.

You might be interested to go down and take a look smile.gif

Click below for more details

http://www.mayer.sg/

Wow! Thanks alot!! :D

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×