Tiler Seng 57 Report post Posted June 8, 2015 Hi Tiler Seng We have just collected keys for our new 4-room BTO flat and am looking around for some basic renovation Can you kindly quote us for the following works: 1) Hacking of full L-shaped wall between kitchen and living room2) Tiling of living room, master bedroom and two other bedrooms (Are tiles included or should we purchase our own?)3) For both common and master Bath- Remove existing standard wash basins and install new wash basins with storage cabinets below (suspended off the floor)- Construct shower stall with single sided glass partition We are still considering kitchen options but would like to request a quote to install kitchen sink, top and bottom cabinets with counter top (on one side of kitchen only). Thank you very much! Hello i've PM you Share this post Link to post Share on other sites
xiaofang 0 Report post Posted June 9, 2015 hi tiler seng, can u pm me your contact? im looking to reno my house. thanks a lot! Share this post Link to post Share on other sites
bsxk 0 Report post Posted June 15, 2015 (edited) Hi,Can you help to quote flooring with homogeneous tiles for a BTO 4rm flat living room and 3 bedrooms? Pls leave your contact too. Edited June 15, 2015 by bsxk Share this post Link to post Share on other sites
McMoo 0 Report post Posted June 17, 2015 Hi Tiler Seng, can you quote me for flooring using homogeneous tiles for BTO 5rm living rm and 3 bedrooms? Thanks. Share this post Link to post Share on other sites
iceychie 0 Report post Posted June 17, 2015 HiI'm new to this forum as only recent gg to get key for new 3room BTO flat.Am looking around for quotes for "small" job (as for small house )Thus, can you provide quote for the following basic stuff that i need to do up? Thanks1. Tiling work2. Kitchen cabinets (top/bottom on one side and bottom on the other short short side)3. Maybe going to hack a small irrating wall at kitchen entrance (this cause the kitchen layout seems small)4. 4ft wardrobe for both bedrooms5. Shower kerb (no shower glass as place will be small for the "cage" to be installed)Not sure if you have do window and window grilles or not. But basically above are the confirm item required.Thanks Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted June 17, 2015 Have Replied you"we have completed shifting of our Showroom from 629 Balestier to Balestier Plaza #01-24 Guys.....please contact me again if i haven't get back to your enquiry yet ! Share this post Link to post Share on other sites
blue_skies 3 Report post Posted June 19, 2015 (edited) Just wanted to say a big thank you to Ronald and his team of workers for being so accomodating and patient during the renovation works at my place.I had waterproofing problems in my windows, walls and outdoor area which they helped to repair. They did not rush the job and made sure it was done properly.MANY THANKS Edited June 19, 2015 by blue_skies Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted June 19, 2015 Just wanted to say a big thank you to Ronald and his team of workers for being so accomodating and patient during the renovation works at my place.I had waterproofing problems in my windows, walls and outdoor area which they helped to repair. They did not rush the job and made sure it was done properly.MANY THANKS Thanks Grace has always been so patience & sweet with us, positive comment has again drove us on Share this post Link to post Share on other sites
yczenn 0 Report post Posted June 30, 2015 Hi, pls kindly pm me your contact. Need a quote for 5rm BTO flat. Tks! Share this post Link to post Share on other sites
kappa 0 Report post Posted July 1, 2015 Do you do repairs? I need help with the kitchen area. Please leave contact. Share this post Link to post Share on other sites
kappa 0 Report post Posted July 1, 2015 This Young couple came to me to ask about renovation for their BTO, they are the last to get FOC cement screed for their vinyl floor finish, while taking photos, happy to hear that they have spend less than $40K for the whole renovation, including appliances.They are very daring in some way, they have decided not to do laundry with a regular way, so the whole entire Service Yard had been expended to be part of kitchen,washing machine and dryer has replaced laundry.Everything that should comes along with a Kitchen will not be compromised, oven, dish washer, what do you want more for a Kitchen Lover?What material is used as countertop? Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted July 1, 2015 http://www.kompacplus.com/ Share this post Link to post Share on other sites
dancingshoes 0 Report post Posted July 7, 2015 Hi Tiler Seng,I have a piece of tiled wall, thinking of retiling it to another tile design, can you quote me the price for removing existing tile and tile new set?My wall is around 2.6m wide by 2.6m height.Thanks! Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted July 8, 2015 Hi Tiler Seng,I have a piece of tiled wall, thinking of retiling it to another tile design, can you quote me the price for removing existing tile and tile new set?My wall is around 2.6m wide by 2.6m height.Thanks!Pm Sent Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted July 10, 2015 Hi Guys,it has left with 5 more weeks to Chinese Hungry Ghost Festival, Have you had your renovation planning yet to avoid this ghost month?If not please do it now it will be hard to get contractor to work during that period of time Share this post Link to post Share on other sites