Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts

Looking for good contractors? Click here for your request

Hi Tiler Seng,

Pls quote & PM following, thanks.

1) hacking & re-tiling of kitchen floor

2) hacking & re-tiling of service balcony floor

3) hacking exiting kitchen cabinet

4) hacking the wall between kitchen & service balcony

5) Build a new 20ft top & bottom cabinet.

 

Share this post


Link to post
Share on other sites

Hi Tiler Seng,



Pls quote & PM following, thanks.



Hacking:


1. Kitchen entrance L wall


2. Kitchen Window Louvers & Door plus wall between kitchen and service yard.



Laying of Homogeneous tiles


1. Kitchen floor & partial wall


2. Service Balcony floor & Wall


3. Overlay 2 x Toilets floor and wall


 

Share this post


Link to post
Share on other sites

Hi Tiler Seng

I am looking to renovate a resale 5 room HDB.

Could you kindly quote us roughly how much it would cost to do the following please?

1) hack and retile entire living room / dining / 2 common rooms and master bedroom with homogeneous tiles

2) hack and retile entire kitchen with homogeneous tiles

3) hack and retile MBR toilet and common toilet with homogeneous tiles

4) hack and refabricate kitchen cabinet in kitchen (not sure about length)

5) remove false ceiling in living room

6) replace all room doors and main door

This is a rough idea of what we would like to do

Thanks in advance.

 

Share this post


Link to post
Share on other sites

Today is our most memorable day, the father of Singapore has left us....

Whatever we have today are a Gift he gave to us....

Thank You again :good:

 

Share this post


Link to post
Share on other sites

hi Mr Tiler Seng, can i seek ur advice? is it true that we cant hack the bathroom tiles in a 1yr old bto.

3-year restriction period on removal of toilets wall and floor finishes

The toilets in your flat come with wall and floor finishes. As the toilets are designed to be wet areas, a waterproofing membrane has been laid on the cement screed before laying the floor finishes. This is to prevent water from leaking through the ceiling of the flat immediately below your flat.

Hence, flat owners are not allowed to replace the toilet floor and wall finishes provided by HDB/developer for a period of 3 years. Flat owners may however lay new toilet floor finishes over the existing floor finishes using adhesives.

The 3-year restriction period will commence from the completion date of the block.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×