reckless 0 Report post Posted March 6, 2014 Hi Tiler Seng... sorry but i didnt receive any email from you... Share this post Link to post Share on other sites
fats 4 Report post Posted March 7, 2014 DEAR TILER SENGI am new to renotalk. I wish to remodel my kitchen and common toilet.I also want to have a wall featured in the living room with suspended tv console. Paint the whole house (5 room flat).I had a contractor do site visiting and below was what he had quoted to me. Please advise if his pricing is reasonable.1 Supply and lay homogenerous floor tiles at kitchen. 1,200.00 2 Supply and lay homogenerous wall tiles at kitchen. 2,862.00 3 To construct 14ft L-shape concrete sink/stove with tiles finishing. 1,540.00 4 To supply and install 14ft India Granite surface for kitchen worktop. 1,820.00 5 Design and fabricate 14ft bottom kitchen cabinets. 1,540.00 6 To construct kitchen cabinet bases (1 = 4'6" and 1 = 6') 320.00 7 Design and fabricate long kitchen cabinet 4'6" 1,104.00 8 Design and fabricate 12ft top and bottom kitchen cabinets. 1,440.00 9 To supply and install 6ft India Granite surface for kitchen worktop. 780.00 10 To construct kitchen entrance kerb. 120.00 11 To supply and install stainless steel pipes at common toilet and kitchen toilet. 1,100.00 12 Supply and lay homogenerous floor tiles and wall tiles at common toilets. 2,174.00 13 To supply and install toilet bowl at common toilet. 350.00 14 To supply and install wash basin at common toilet. 160.00 15 To box up 8ft sewage pipes with partition and PVC board at common toilet. 720.00 16 To box up 8ft sewage pipes with partition and PVC board at master toilet. 750.00 17 Provide ICI/Nippon paint service for whole unit. 1,450.00 18 Design and fabricate 8ft suspended TV console in hall. 1,040.00 19 Design and fabricate 8ft wall feature panel (craftstone or ledgestone) in hall. 2,300.00 20 To supply and install 1no Pd door at common toilet. 580.00 21 To supply and install 3nos Veneer doors for 3nos bedroom. 1,080.00 22 To supply and install wrought iron at main door. 640.00And I forgot the hackingProvide hacking & dismantling service for existing kitchen and common toilet floor tiles 2,760.00 and wall tiles; existing concrete sink & stove support and ktichen cabinets c/wclear debris service.Please advice as I am like pulling my hair out with the total 27 000 dollar quote and it is not even the whole house.Anyway I chose the materials and design myself. Share this post Link to post Share on other sites
fats 4 Report post Posted March 7, 2014 DEAR TILER SENGI am new to renotalk. I wish to remodel my kitchen and common toilet.I also want to have a wall featured in the living room with suspended tv console. Paint the whole house (5 room flat).I had a contractor do site visiting and below was what he had quoted to me. Please advise if his pricing is reasonable.1 Supply and lay homogenerous floor tiles at kitchen. 1,200.00 2 Supply and lay homogenerous wall tiles at kitchen. 2,862.00 3 To construct 14ft L-shape concrete sink/stove with tiles finishing. 1,540.00 4 To supply and install 14ft India Granite surface for kitchen worktop. 1,820.00 5 Design and fabricate 14ft bottom kitchen cabinets. 1,540.00 6 To construct kitchen cabinet bases (1 = 4'6" and 1 = 6') 320.00 7 Design and fabricate long kitchen cabinet 4'6" 1,104.00 8 Design and fabricate 12ft top and bottom kitchen cabinets. 1,440.00 9 To supply and install 6ft India Granite surface for kitchen worktop. 780.00 10 To construct kitchen entrance kerb. 120.00 11 To supply and install stainless steel pipes at common toilet and kitchen toilet. 1,100.00 12 Supply and lay homogenerous floor tiles and wall tiles at common toilets. 2,174.00 13 To supply and install toilet bowl at common toilet. 350.00 14 To supply and install wash basin at common toilet. 160.00 15 To box up 8ft sewage pipes with partition and PVC board at common toilet. 720.00 16 To box up 8ft sewage pipes with partition and PVC board at master toilet. 750.00 17 Provide ICI/Nippon paint service for whole unit. 1,450.00 18 Design and fabricate 8ft suspended TV console in hall. 1,040.00 19 Design and fabricate 8ft wall feature panel (craftstone or ledgestone) in hall. 2,300.00 20 To supply and install 1no Pd door at common toilet. 580.00 21 To supply and install 3nos Veneer doors for 3nos bedroom. 1,080.00 22 To supply and install wrought iron at main door. 640.00And I forgot the hackingProvide hacking & dismantling service for existing kitchen and common toilet floor tiles 2,760.00 and wall tiles; existing concrete sink & stove support and ktichen cabinets c/wclear debris service.Please advice as I am like pulling my hair out with the total 27 000 dollar quote and it is not even the whole house.Anyway I chose the materials and design myself. I forgot to provide email address. You can contact me via fathimanacchiar@gmail.com. Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted March 7, 2014 Comment Sent Share this post Link to post Share on other sites
tessina 9 Report post Posted March 12, 2014 Hi Ronald,Are you a full service contractor, or just specialised in tiling/plumbing only still? Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted March 22, 2014 Feel Free to Visit our website www.designerhouse.com.sgwhile I when through numerous of ID company website, I realised that their project reference are mostly 3D-make,reason behind are simply:1. Project never happened2. Not able to take picture on the real one.3. Can't afford to pay for photographing.For what I think, a ID film should show the real picture of the created work, it shown how satisfied are your client for allowing you to return for photography,a ID film should has its photographing skill somehow so to keep its project as future portfolios.Just my two cents Share this post Link to post Share on other sites
kiwibird 0 Report post Posted March 23, 2014 Hi, Is it possible to do a totally flat floor using tiles instead of marble? Or at least with a gap of 1.5 mm or less between the tiles? Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted March 24, 2014 Any lesser than 3mm gap are consider dangerous, warranty will not be provided for tile popping up due to contraction expansion. There's a way to fill the gaps with epoxy to replace cement grout, follow polishing on homogenous surface, but the cost of this polishing is as good as laying a new marble floor,and yet the homogenous surface may de-gloss by 20%. Share this post Link to post Share on other sites
cyberevo 1 Report post Posted March 26, 2014 Hi Tiler Seng,Can you send me your quote for typical reno works for new 4 Room BTO. My flat does not come with flooring (main hall and bedrooms) and doors. Toilets already have flooring and fixtures. Kitchen also already come with flooring.Thanks. Share this post Link to post Share on other sites
EthanDad 2 Report post Posted March 26, 2014 Hi, my mother-in-law's bathroom tiles popped up.. what can i do? and the cost? her flat is old, toilet and bathroom separated.. Please PM. Thanks in advance. Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted March 30, 2014 I am totally disappointed with the youngster now a day!When I was a trainee with age of 20, I did my work in detail, listening to my senior to learn!Apart from the other trainee I had, this guy who name as Gary is a 30+ young man from JB, with 4 kids, he was introduce to my company half a year ago and has someexperience from his last company, he couldn't speak like a salesman so I've been trying my best to guide him along the way.He has "MIA" with reason for the last two times and I am willing to give 3 times in chance, The day before, I was telling him to think about what he want to do nextcause he was very careless in his quotation doing, somehow, he disappeared again...For customer who has served by him before, I would sincerely hope you could contact me for anything left behind by him... apology Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted April 3, 2014 Looking for Good & Reliable Sales Designer x 5 , higher profit sharing than market rate for independent designer, transport are claimableinterested please contact me at 82008901, Ronald Share this post Link to post Share on other sites
tyxben 0 Report post Posted April 20, 2014 boss need you to quote Supply labour and material (exclude tiles) to lay 2 bathroom tiles (ceramic) 3 kind of tiles (wall, floor , feauture) 4 room new punggol BTO. Share this post Link to post Share on other sites
KeVnAsH 0 Report post Posted April 21, 2014 Hi, the bathroom floor in my mother-in-law's hdb flat is getting very slippery when wet and the wc are in quite bad condition. Need you to quote on the following works;1. Overlay floor and wall tiles.2. Supply and install wc.3. Supply and install wall hung basin and tap.Please note that for item 3, the basin will be mounted above the counter top. Hope to receive a quote from you soon. Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted April 23, 2014 Hi KeVnAsh, if don't want spend money, you can buy a bottle of anti-slipped chemical will do? Share this post Link to post Share on other sites