Tiler Seng 57 Report post Posted January 28, 2011 Hi need quotation, reno to start end march 2011. 5rm hdb hack all tiles in kitchen and 2 toilets. ( tiles i will source) Remove one wall in kitchen. lay tiles in kitchen floor, toilets wall and floor. plaster kitchen wall. conceal plumbling if possible building of false ceiling. installation of led downlight and led cove lighting painting of whole house revarnish 3room varnish floor. special request, i have already custom made kitchen cabinet, tv console, vanity cabinet, walk-in-wardrobe and bedframe from china, and they will ship over flatpacked with holes pre-drilled, so i will need to have them fix up and mounted onto the wall. please drop me a pm or send me a email desmond.sum@gmail.com i will be best if we can meet up to discuss. Thanks, Desmond Hi Desmond, Have sent you email. Share this post Link to post Share on other sites
lwd80 0 Report post Posted January 31, 2011 With so many ppl asking for quotation, is there anyone who had engage their service? Hardly can find any review of their job. Can give a review of their workmanship? Share this post Link to post Share on other sites
blue_skies 3 Report post Posted February 1, 2011 With so many ppl asking for quotation, is there anyone who had engage their service? Hardly can find any review of their job. Can give a review of their workmanship? Hi lwd80 My place was just renovated, this is my blog mostly with before and after reno pictures, no time to write report everyday after reno I also haven't updated the blog with the final photos yet coz still settling in to my new place. http://www.renotalk.com/forum/index.php?sh...rt=#entry607144 A review of the reno works: Renovation completed as according to schedule and every 1-2 days, Sam (the project manager overseeing my reno) would update me on the progress and ask me if I was satisfied with everything that had been done so far. I would normally drop by every 1-2 days to check on the progress of the reno and also during some important stages such as air-con installation - to decide how the trunking or draining pipes would be run. If any issues, you can call them and they'll arrange to come down to see the problem asap. All the reno works will be discussed with the project manager managing the reno (e.g. Sam) or Ronald so that the sequence of renovation is done correctly and you know when to arrange for what to be done. E.g. carpentry, air con installation etc, in case you engage someone else to do these works. They can also advise (if you want) on what would look nice or be more practical in case you cannot decide. Sam also advised when he needed me to be around to make decisions, e.g. - Plumbing (I was particular about how I wanted the hot water pipes to run) - Electrical (Where to place 2 way switch, where to position lights etc) - Toilet (I wanted a particularly low kerb between my toilet and external area) I engaged Ronald & Tiler Seng to: - Hack & lay tiles for flooring in study, kitchen & service balcony - Hack & lay tiles for walls for kitchen & service balcony - Hack & lay tiles for 2 toilets flooring - Whole house electrical - Whole house plumbing - L-box in living room and dining - Hack study room walls and some beams (that needed PE approval) - Install bathtub, WC, sink, hot water tank for 2 toilets - Change louvered windows in 2 toilets - Change casement windows to sliding windows in living area - Whole house plastering - Whole house painting - Plus a lot of other misc stuff here and there.... Overall, had no problems with the guys that did the renovation at my place. The plasterer is very good, my rock stone walls are history! The plumber and tilers are also good, no issues with them. Pipes were run according to how I wanted them, tiles also laid very nicely and as planned. Any potential problems with tiles were raised by tilers before they laid it, i.e. they do not proceed without your approval. I had some areas where the new tiles meet the old tiles and we discussed how best the tiles would be joint before they proceeded. I changed my toilet doorway and they made my new doorway the "standard" sized doorway - I told them that I preferred a bigger doorway so they were nice enough to remove the cement before it dried and re-did it. My toilet kerb was too high so they knocked off the tiles and cement (it had already set) and redid it. We had already bought the tiles for setting the 2 bathtubs and then decided that we wanted to change the tiles. They had to go back to the shop to buy more tiles and still meet the schedule. Workmanship is good, tiles are laid very evenly and I am happy with what has been done. I remember changing my mind a few times about the reno works but they (Sam & Ronald) were very patient and obliging. I think it's really hard work managing all these workers and your ever demanding customer (us, that is). They were working full day on Christmas Eve and New Year's Eve, and Sam returned all my phone calls if he missed them. My renovation with them has been a pleasant one and I hope yours will be too Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted February 1, 2011 (edited) Thanks Grace Edited February 1, 2011 by Tiler Seng Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted February 2, 2011 Nobody bother to post in RT today due to holiday season.. BTW, i would like to Take this opportunity to wish All RT member a Happy Lunar New Year, and don't forget our Adminstrator behind the screen to keep RT going..Happy CNY to you!! Share this post Link to post Share on other sites
sweetjeandar 0 Report post Posted February 7, 2011 Hi Need a quote for laying tiles on my living room and the three bedrooms only. 600mm by 600mm homogenous tileas, please quote granite as well as I want to do a comparison. please call me if possible 97775382 Share this post Link to post Share on other sites
joey530 0 Report post Posted February 8, 2011 Hi, can a have a quote for the following: (110 sqm resale) 1) Hack off existing floor tiles for kitchen & 2 bathrooms 2) Hack off existing wall tiles for kitchen & 2 bathrooms 3) Remove existing kitchen cabinet 4) build kerb at shower area (2 bathrooms) 5) Supply labour to dismantle & install 2 wash basin with tap, shower head (mixer) and 2 toilet bowl for 2 bathrooms 6) Supply labour to dismantle 1 bath tub at master bedroom toilet 7) Supply and lay homogenous floor tiles kitchen & 2 bathrooms 8) Supply and lay wall tiles for 2 bathrooms 9) supply and install 2 x shower screen(glass) for 2 bathrooms. 10) supply and install 2 x toilet door (glass swing door) 11) polish existing broken marble flooring for living/ dinner and 3 bedrooms. 12) build concrete base for the kitchen cabinet 13) Hack 1 kitchen wall 14) supply and install 1 kitchen glass door. Please itemise cost for me and list the tile price for floor and wall. We are looking at big pieces of tile for both wall and floor. We have a contractor for kitchen cabinet, we need you to work with him for the kitchen drainage and water supply layout. Please drop me a mail and I will forward my floorplan. Thank you Joey Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted February 8, 2011 Hi Joey, Have sent you email Share this post Link to post Share on other sites
trowaid 0 Report post Posted February 8, 2011 Hi Tiler Seng, Would like to get your quote for the following (5 room flat - 122sqm) 1) Hack and lay tiles for whole house (Kitchen, 2 toilets, living room and 3 bedrooms) 2) Hack and lay tiles for kitchen and toilet walls 3) Whole house electrical 4) Whole house painting 5) Change of toilet metal pipes to PVC ones 6) Kitchen cabinet and 3 wardrobes 7) 1 foldable toilet door and a seated toilet bowl Thanks in advance and looking forward to your reply Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted February 9, 2011 Hi trowaid, have PM you, Happy New Year Share this post Link to post Share on other sites
Kobelala 8 Report post Posted February 9, 2011 Hi Tiler Seng, Can u quote me the following for my Gen2 EM (waiting for 1st appt, can start reno immediately after 1st appt) : 1) Relay 1st floor living / dining / study with big Homogenuous tiles 2) Relay staircase with big parquet planks with acrylic railings 3) Polish 2nd floor parquet 4) replace kitchen current cabinet top with granite top and change kitchen sink 5) relay 3 toilets floor 6) painting whole house and touch up wall 6) change whole house windows to sliding powder coated blue glass windows and powder coated grills 7) light holder **** / dining n study (1st floor) 8) build parquet platform for king bed in masterbedroom 9) construct false wall in masterbedroom and living room Thanks, u can email me at : psdang@yahoo.com Hope to hear from u soon. Share this post Link to post Share on other sites
stefchin 0 Report post Posted February 9, 2011 Hi Tiler Seng, May I get your quote for a small job? Just overlay tiles (with or without tile cost) in my common bathroom and how long does it take? Problem is, the new pedestal pan is already installed. I also have some questions to ask. Please pm me. Thank you! Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted February 9, 2011 Have pm you 2 Share this post Link to post Share on other sites
trowaid 0 Report post Posted February 14, 2011 Hi trowaid, have PM you, Happy New Year Thanks Tiler Seng, now waiting for the quotes. Share this post Link to post Share on other sites
r104_for 0 Report post Posted February 16, 2011 Budget reno(103 sqm 4 room resale) 1) Hack off existing floor tiles living room and 1 MasterRm 2 BedRm & 2 bathRms 2) Hack off existing wall tiles 1 side of kitchen wall & 2 bathrooms 3) Remove existing 1side kitchen cabinet and masterRm build in. 4) Dismantle & install 2 wash basin with tap, shower head (mixer) and 2 toilet bowl for 2 bathrooms 5) Supply and lay floor tiles 3Rms & 2 bathrooms 6) Supply and lay wall tiles for 2 bathrooms 7) install 2 x shower screen(glass) for 2 bathrooms. 8) supply and install 2 x toilet door (glass swing door) Share this post Link to post Share on other sites