azman79 0 Report post Posted May 18, 2010 Hi Azman, you have pm. Received. I send you some other works to be done as well. Please quote. Your quote for overlaying is attractive. Share this post Link to post Share on other sites
vinzbiz 0 Report post Posted May 18, 2010 Hi Tiler Seng, Can pm me your email? Will send you my renovation plan, hope you can provide your best quote. Share this post Link to post Share on other sites
mafacifa 0 Report post Posted May 20, 2010 Hi Tiler Seng, Can you PM me what other works u do besides tiles for HDB. Thanks Share this post Link to post Share on other sites
eteo 0 Report post Posted May 20, 2010 Hi Ronald, Have sent you PM. Thanks Teo Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted May 20, 2010 Hi Ronald, Have sent you PM. Thanks Teo Dear All, we are stucked with paper work again, for anyone that has waited for more than a week.. please pardon us, we will come back to you once is available. For anyone that is urgently needed the quote, just highlight to us in your enquiry, will make you first. But for those who just want to ask for fun, please don't come disturb us at this time, thanks in advance! Share this post Link to post Share on other sites
Dinspired 0 Report post Posted May 26, 2010 Hi Ronald, Still waiting for your quote. Sent u PM. I need it asap to make a decision on the contractor. Thanks. Share this post Link to post Share on other sites
nemphus 0 Report post Posted May 28, 2010 Hi Tiler Seng, how much do you charge for the following items? Please PM me if necessary please. Its a 5room resale. Thanks! Living hall area 01) To supply labour to lay marble flooring **** and dining hall 2 Bath room area 01) To supply and lay 2 bathroom Heavy Duty Homogenous floor tiles 02) To supply and lay 2 bathroom designer wall tiles Kitchen area 01) To supply labour to lay kitchen wall tiles 02) To supply labour to lay kitchen Heavy Duty Homogenous floor tiles 03) To construct cabinet base, fridge base and washing base Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted May 28, 2010 Hi James_Yoo, tried to send Quotation to you but email being rejected, got any other email address? Share this post Link to post Share on other sites
bishop 0 Report post Posted May 29, 2010 Hi! Mine is a 5rm flat. Like to check is it possible to overlay tiles **** and Bedrooms? if yes, pls provide quote for following If Living and Bedroom cannot overlay, then pls add a Labour for Hacking of existing floor. 1. Laying of Homogeneous floor with skirting **** and dinning 2. Laying of Homogeneous floor with skirting at 3 bedroom (living + dinning + 3 bedrrom abt 1000 sqft) Pls also advise if there's anything necessary that I've left out Pls send reply to roguebishopsg@yahoo.com.sg PS: I suppose charge include cement and etc?? Tks Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted June 2, 2010 Hi Ronald, Still waiting for your quote. Sent u PM. I need it asap to make a decision on the contractor. Thanks. Hi Dinspired, am doing it now, please hold on deciding contractor Share this post Link to post Share on other sites
queenzee 0 Report post Posted June 3, 2010 Hi Tiler Seng, Can you quote for me masonry works: 1) Demolish kitchen yard walls 2) Demolish kitchen + kitchen yard floor tiles 3) Demolish common bathroom floor tiles 4) Supply and lay anti-slip homo floor tiles for kitchen+yard+common bathroom 5) Supply and lay waterproofing for kitchen+yard+bathroom 6) Construct and supply cement base with tiles finish for cabinet+washing machine and fridge base 7) Supply and install copper piping for kitchen and bathroom Its a 4rm HDB flat. Let me know what details ive missed out. Appreciate a reply with the quote the soonest as i need to choose the contractor and preference to start the job end of this month or early next month. Thanks!! Share this post Link to post Share on other sites
IDseeker 0 Report post Posted June 4, 2010 Hi Tiler Seng, I'm also awaiting on your quote which I've given my requirements to you earlier. Estimate date on renovation commencement: Aug or Sept 2010 Thanks! Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted June 4, 2010 Hi Tiler Seng, I'm also awaiting on your quote which I've given my requirements to you earlier. Estimate date on renovation commencement: Aug or Sept 2010 Thanks! Hi IDseeker, been busy with side work, will arrange your quote asap. Share this post Link to post Share on other sites
Stone23 0 Report post Posted June 8, 2010 Hi Tiler Seng, may I have ur email address??? Share this post Link to post Share on other sites
ahpan 0 Report post Posted June 12, 2010 New 4RM BTO 1 Supply & lay floor tiles at kitchen floor. 2 Supply & lay floor tiles at 2 toilet floor. 3 Supply & lay floor tiles **** room 4 Supply & lay timber floor in x3 bedrooms. 5 Construct shower Kerb in MBR toilet. 6 Install 2 toilet bowl 7 Install 1 basin in common toilet Pls advise on qutotation. thanks Share this post Link to post Share on other sites