beany0811 1 Report post Posted August 29, 2009 If I'm not wrong, the fridge should be planning to put beside the cabinet on the left ? you kitchen looking good. Afterall is from Classic ! The price kinda shun me away as I kinda out of budget ahahaha. how much was it to have them install the kitchen? speed of construction is amazing. but what impressed me was the coloured interiors... not the usual white PVC interiors most carpentry comes with Share this post Link to post Share on other sites
forkie 0 Report post Posted August 28, 2009 As promised, here are photos of my almost completed kitchen! The protective cover on the laminates are not removed yet. The granite top will be installed next week, with the hob and sink. If I'm not wrong, the fridge should be planning to put beside the cabinet on the left ? you kitchen looking good. Afterall is from Classic ! The price kinda shun me away as I kinda out of budget ahahaha. Share this post Link to post Share on other sites
JandG 0 Report post Posted August 28, 2009 Errr.. Where's the fridge? Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 (edited) Some more photos of my almost completed kitchen. Edited August 28, 2009 by tuababy Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 As promised, here are photos of my almost completed kitchen! The protective cover on the laminates are not removed yet. The granite top will be installed next week, with the hob and sink. Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 have they completed ur kitchen? Classic Furniture has done theirs. Now left my granite top to be installed next week, with the hob and sink! Share this post Link to post Share on other sites
Lise 0 Report post Posted August 28, 2009 have they completed ur kitchen? Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 no la, i saw those before you put the cardboard one. so you move on the 3rd week of Sept right? Those are the same tiles as yours, all from HDB. Maybe earlier. See how it goes! Share this post Link to post Share on other sites
elane1311 0 Report post Posted August 28, 2009 no la, i saw those before you put the cardboard one. so you move on the 3rd week of Sept right? Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 both of u seem to be super hands-on on the stuff in your house it will def create a stronger sense of belonging. glad to see things progressing along, seems super fast! btw, is tt formica laminate u used for your kitchen? is it exp? Yup, we have a tendancy to be hands-on, but it's also wanting to cut costs in areas which are possible. It does makes us treasure the place more I guess. The place should be more or less ready by end of next week! Yes, it's Formica laminates! The 2mm thick high gloss one. It is more costly than the usual type. I think you can actually request for that from your contractor and you may need to top up the cost depending on your contractor. We engaged Classic Furniture which is a kitchen specialist and they solely use Formica Laminates for their kitchens, hence it comes at a premium price too. Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 how come looks different? Different meh? Maybe you have mistaken the corrugated paper floor protection for the floor tiles! Share this post Link to post Share on other sites
beany0811 1 Report post Posted August 28, 2009 both of u seem to be super hands-on on the stuff in your house it will def create a stronger sense of belonging. glad to see things progressing along, seems super fast! btw, is tt formica laminate u used for your kitchen? is it exp? Share this post Link to post Share on other sites
~BBtBB 0 Report post Posted August 28, 2009 Yesterday was a busy day. There was so many things going on in the house. The workers from Classic came, then the oven from Teka and finally the hob, hood and microwave from Happiness. The whole house was bustling with life! Excellent services from all of them Teka called the night before informing me that the model I ordered is eh... damaged in the warehouse. In fact, all of remaining sets are slightly damaged! So what they offered to do is give me another model which is slightly better at no extra cost. At first, I was quite miffed about it since I really like the model I bought. But after some consideration, I thought that this was actually a blessing because I was getting a more expensive oven with better features! TuaBaby and I also painted our room. Had to be really careful since the parquet has already been polished. Yesterday, I think we accomplished quite a bit of painting though we were slowed down a little in the morning with the initial buzz. Now, we are looking forward to Sat and Sun where we will paint our feature wall. Workout time for us! Now I'm waiting in anticipation for our wardrobe and shoe cabinet to be in. Share this post Link to post Share on other sites
elane1311 0 Report post Posted August 28, 2009 More photos will come late tonight. Haven't uploaded yet. The tiles are the same as yours, from HDB. how come looks different? Share this post Link to post Share on other sites
tuababy 0 Report post Posted August 28, 2009 more pictures pls!!! your living room tiles is from gahmen or your ID one? More photos will come late tonight. Haven't uploaded yet. The tiles are the same as yours, from HDB. Share this post Link to post Share on other sites