Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
br0wnskinnedb0y

Help: Need Comments On This Reno Quote

Recommended Posts

Hi,

Wah... really ex. :o Mine is 122 sqm, 5rm resale overhaul excluding bedrooms max quote I received so far is 38k. Maybe you got more carpentry but still, to me is ex. Think you should ask for more quotes. :)

Ya, been asking around and see if we can get better quotes.. :rolleyes:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Hi all,

1st time doing reno, and got a verbal quote of $48-50k for the following jobs (4A Std - 89m square)

Frankly speaking, both me & hubby find it really EXPENSIVE!

But would like to have some comments and suggestion as well :)

Hi,

Wah... really ex. :o Mine is 122 sqm, 5rm resale overhaul excluding bedrooms max quote I received so far is 38k. Maybe you got more carpentry but still, to me is ex. Think you should ask for more quotes. :)

 

Share this post


Link to post
Share on other sites

Hi all,

1st time doing reno, and got a verbal quote of $48-50k for the following jobs (4A Std - 89m square)

Frankly speaking, both me & hubby find it really EXPENSIVE!

But would like to have some comments and suggestion as well :)

Floorplan.jpg

MBR

- Bedframe for queen size bed,

- 6Ft full height wardrobe with TV feature and sliding door on platform

- 2Ft dressing table

MBR - Toilet

- Shower screen with sliding door

- 50mm shower kerb

- Vanity base for sink

Main Toilet

- Vanity base for sink

Bedroom 3

- To be hacked and join with MBR(STRONGLY REQUESTED BY ID)

Bedroom 2

- 6Ft full height wardrobe

Kitchen

- L-shaped cabinet

- Fridge base

- Cabinet base

Service yard

- Washing machine base

Living room

- TV console

- Wall feature

- Knee height shoe cabinet

Dining area

- Tic Tae wall feature for house shelter

Flooring

- Laminated flooring for 3 bedrooms

- Homogenous tiles for living, dining and passage way

 

Share this post


Link to post
Share on other sites

I had also received a quote today and am curious on whether is it as good as it was promise by the company.

would appreciate some comments. TIA =)

quotesq.jpg

 

Share this post


Link to post
Share on other sites
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

I think the price is ok. Do u mind to share your contractor contact with me? My email address is n2001ml@yahoo.com. Btw, have you done your renovation?

 

Share this post


Link to post
Share on other sites
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

Hi br0wnskinnedb0y,

Do you mind to share with me your quote contact to me? i am also looking for renovation firms. Thanks.

 

Share this post


Link to post
Share on other sites
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

Hi can you email your contractor's contact details to me (pigypigy@live.com) as well~~??? Thank u

 

Share this post


Link to post
Share on other sites

Hi br0wnskinnedb0y,

I also find the quotation quite reasonable. Maybe it is expensive compared to those by contractors. But if you are engaging an ID I think the carpentry work is lower than all those I have come across. But cost aside, the most important thing is you are comfortable with the ID and the company has a good track record.

 

Share this post


Link to post
Share on other sites

Hi br0wnskinnedb0y,

Can you PM me the contacts of your contractor? In fact I think the first quotation u posted in this thread isn't that expensive...

Thanks!

 

Share this post


Link to post
Share on other sites
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

I think it is quite reasonable, u have got quite a lot of carpentry work and carpentry work is the most expensive stuffs.

Try to get your ID/Contractor to give u a discount from the final bill or to waive some of the carpentry dismantle cost.

 

Share this post


Link to post
Share on other sites
Hi Dean

I am currently going thru my reno with Summit Design and honestly I think they are quite average. There are not much designs and workmanship is just above average compared to the price. U also have to monitor the work and schedule otherwise there will be deviation or delay in time (workers not available, work has not been finished, etc). So if u already know what u want to do (just browse thru some reno magazine/ internet for ideas), my advice to all will be to go for contractor rather than ID. Cause it will be a lot cheaper at the end.

Since I have learnt and benefited from so many forummers here, I thought I will also share my input for the benefit of others.

Can u pls pm me contractor of Summit desgin pls...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×