Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
br0wnskinnedb0y

Help: Need Comments On This Reno Quote

Recommended Posts

Can i email you the quote from Summit Design and Linewerkz. Although Summit Design price is more than Linewerkz. Their price is average.

I only got 1 house to choose 1 of 3 Reno company.

The above quotation at Post #8 is hand written from 1 of contractor (Shing Soon Aluminium Co - HB-02-2428C), the quote abit unclear as it hand wriiten.

No issues. You can PM me your quotes

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Hi Dean

I am currently going thru my reno with Summit Design and honestly I think they are quite average. There are not much designs and workmanship is just above average compared to the price. U also have to monitor the work and schedule otherwise there will be deviation or delay in time (workers not available, work has not been finished, etc). So if u already know what u want to do (just browse thru some reno magazine/ internet for ideas), my advice to all will be to go for contractor rather than ID. Cause it will be a lot cheaper at the end.

Since I have learnt and benefited from so many forummers here, I thought I will also share my input for the benefit of others.

Can i email you the quote from Summit Design and Linewerkz. Although Summit Design price is more than Linewerkz. Their price is average.

I only got 1 house to choose 1 of 3 Reno company.

The above quotation at Post #8 is hand written from 1 of contractor (Shing Soon Aluminium Co - HB-02-2428C), the quote abit unclear as it hand wriiten.

Edited by dean
 

Share this post


Link to post
Share on other sites
ok thanks. i think alot not mention cos no proper standard agreement contractor. i am waiting for summit design quotation. i don't cook.

Hi Dean

I am currently going thru my reno with Summit Design and honestly I think they are quite average. There are not much designs and workmanship is just above average compared to the price. U also have to monitor the work and schedule otherwise there will be deviation or delay in time (workers not available, work has not been finished, etc). So if u already know what u want to do (just browse thru some reno magazine/ internet for ideas), my advice to all will be to go for contractor rather than ID. Cause it will be a lot cheaper at the end.

Since I have learnt and benefited from so many forummers here, I thought I will also share my input for the benefit of others.

 

Share this post


Link to post
Share on other sites
hi dean,

seem item 1 is exp ley... only 15ft cabinet, is it enough?bcos they count top n bottom separate ley.. that mean only 7.5ft for top n bottom liao..better ask probaly or u might got the hidden cost after lo... not understand item 2 ley.. another cabinet in kitchen? if yes that mean ur kitchen cabinet total almost 6k le.. wow... does it inclu kitchen sink, tap?

weiwei

ok thanks. i think alot not mention cos no proper standard agreement contractor. i am waiting for summit design quotation. i don't cook.

 

Share this post


Link to post
Share on other sites
Today 1 contractor went to view my flat and show me so many photos of reno work that he have done. Some kitchen are old dated, some kitchen are latest. I think he is a contractor not a ID. He also provide drawing for you. His price still can negotiable.

N o 9 1 0 5 3 5 0 3 HDB Licence No: HB-02-2428C

From His hand written quotation:

1. construct 15ft L shape kitchen top cabinet and bottom cabinet, top surface using man made stone surface $4045

2. 8ft Full height cabinet @ kitchen with 4 door (free Transfer 1 switch socket to other side) $1920

3. Flat Dustbin Chute $150

4. Hack away wall tile, plaste smooth paint $600

5. 1 toilet bifold door $120

6. Master Bed Room Toilet Supply & Labor WC x 1 and Basin x 1 $480

7. Relocate SCV $120

8. Wardrobe $1320

9. 4 ft feature wall with tv console $500

10. Paint whole house $700 (2 color with Sealer), plus touch up here and there.

Total $9955

Free CLeaning house, free install 4 switch sockets @ kitchen

Kitchen $4045 include hacking concrete cement tile Sink, dismantle and remove existing kitchen cabinet

I think man made stone should be solid surface top. Kitchen doors are plywood material. He show me so many photos, catalogs.

Before reno vacant flat

hi dean,

seem item 1 is exp ley... only 15ft cabinet, is it enough?bcos they count top n bottom separate ley.. that mean only 7.5ft for top n bottom liao..better ask probaly or u might got the hidden cost after lo... not understand item 2 ley.. another cabinet in kitchen? if yes that mean ur kitchen cabinet total almost 6k le.. wow... does it inclu kitchen sink, tap?

weiwei

 

Share this post


Link to post
Share on other sites
Hi Dean, can you share your contractor with me?? email me at wng@qserv.com.sg or pm me.. Pleaseeee

PM U. First time I seen such contractor brought many many photos, sample catalogs for you to see. the wood is plywood

Hi br0wnskinnedb0y, sorry i hijacked your thread, hope u don't mind.

 

Share this post


Link to post
Share on other sites

Today 1 contractor went to view my flat and show me so many photos of reno work that he have done. Some kitchen are old dated, some kitchen are latest. I think he is a contractor not a ID. He also provide drawing for you. His price still can negotiable.

HP No. 9 1 0 5 3 5 0 3 HDB Licence No: HB-02-2428C

From His hand written quotation:

1. construct L shape kitchen top cabinet and bottom cabinet, top surface using man made stone surface $4045

2. 8ft Full height cabinet @ kitchen with 4 door (free Transfer 1 switch socket to other side) $1920

3. Flat Dustbin Chute $150

4. Hack away wall tile, plaste smooth paint $600

5. 1 toilet bifold door $120

6. Master Bed Room Toilet Supply & Labor WC x 1 and Basin x 1 $480

7. Relocate SCV $120

8. Wardrobe $1320

9. 4 ft feature wall with tv console $500

10. Paint whole house $700 (2 color with Sealer), plus touch up here and there.

Total $9955

Free CLeaning house, free install 4 switch sockets @ kitchen

Kitchen $4045 include hacking concrete cement tile Sink, dismantle and remove existing kitchen cabinet

I think man made stone should be solid surface top. Kitchen doors are plywood material. He show me so many photos, catalogs.

I don't know how many ft of kitchen cabinet

Edited by dean
 

Share this post


Link to post
Share on other sites

I find it quite ok leh.. The quotes that I have gotten, is much more higher leh cheapest is 34k which involves overlaying and not hacking of floor tiles.. Heng I haven't signed. Think I have to source for quotations somemore. Sad, no money no time.. :s

 

Share this post


Link to post
Share on other sites

I m not the expert, the above items quoted is seems on the high side. Ask them to drop the price to around $25K or so, is a waste of time to nego for cost down on indivdual item. Do nego for lump sum job instead of breakdown for individual item, such as hacking, electrical, piping etc.

 

Share this post


Link to post
Share on other sites
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

Yes, 2 words...very expensive.

 

Share this post


Link to post
Share on other sites

Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×