br0wnskinnedb0y

Help: Need Comments On This Reno Quote

Recommended Posts

  sff said:
Hi,

Wah... really ex. :o Mine is 122 sqm, 5rm resale overhaul excluding bedrooms max quote I received so far is 38k. Maybe you got more carpentry but still, to me is ex. Think you should ask for more quotes. :)

Ya, been asking around and see if we can get better quotes.. :rolleyes:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
  Bluemit said:
Hi all,

1st time doing reno, and got a verbal quote of $48-50k for the following jobs (4A Std - 89m square)

Frankly speaking, both me & hubby find it really EXPENSIVE!

But would like to have some comments and suggestion as well :)

Hi,

Wah... really ex. :o Mine is 122 sqm, 5rm resale overhaul excluding bedrooms max quote I received so far is 38k. Maybe you got more carpentry but still, to me is ex. Think you should ask for more quotes. :)

 

Share this post


Link to post
Share on other sites

Hi all,

1st time doing reno, and got a verbal quote of $48-50k for the following jobs (4A Std - 89m square)

Frankly speaking, both me & hubby find it really EXPENSIVE!

But would like to have some comments and suggestion as well :)

Floorplan.jpg

MBR

- Bedframe for queen size bed,

- 6Ft full height wardrobe with TV feature and sliding door on platform

- 2Ft dressing table

MBR - Toilet

- Shower screen with sliding door

- 50mm shower kerb

- Vanity base for sink

Main Toilet

- Vanity base for sink

Bedroom 3

- To be hacked and join with MBR(STRONGLY REQUESTED BY ID)

Bedroom 2

- 6Ft full height wardrobe

Kitchen

- L-shaped cabinet

- Fridge base

- Cabinet base

Service yard

- Washing machine base

Living room

- TV console

- Wall feature

- Knee height shoe cabinet

Dining area

- Tic Tae wall feature for house shelter

Flooring

- Laminated flooring for 3 bedrooms

- Homogenous tiles for living, dining and passage way

 

Share this post


Link to post
Share on other sites

I had also received a quote today and am curious on whether is it as good as it was promise by the company.

would appreciate some comments. TIA =)

quotesq.jpg

 

Share this post


Link to post
Share on other sites
  br0wnskinnedb0y said:
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

I think the price is ok. Do u mind to share your contractor contact with me? My email address is n2001ml@yahoo.com. Btw, have you done your renovation?

 

Share this post


Link to post
Share on other sites
  br0wnskinnedb0y said:
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

Hi br0wnskinnedb0y,

Do you mind to share with me your quote contact to me? i am also looking for renovation firms. Thanks.

 

Share this post


Link to post
Share on other sites
  br0wnskinnedb0y said:
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

Hi can you email your contractor's contact details to me (pigypigy@live.com) as well~~??? Thank u

 

Share this post


Link to post
Share on other sites

Hi br0wnskinnedb0y,

I also find the quotation quite reasonable. Maybe it is expensive compared to those by contractors. But if you are engaging an ID I think the carpentry work is lower than all those I have come across. But cost aside, the most important thing is you are comfortable with the ID and the company has a good track record.

 

Share this post


Link to post
Share on other sites

Hi br0wnskinnedb0y,

Can you PM me the contacts of your contractor? In fact I think the first quotation u posted in this thread isn't that expensive...

Thanks!

 

Share this post


Link to post
Share on other sites
  br0wnskinnedb0y said:
Hi all,

First time doing reno. Can the reno experts here comment on this quote? Is it reasonable?

A. Demolition Works

1. Hacking of existing floor tiles for kitchen --- 350

2. Hacking of existing floor and wall tiles for Master Toilet --- 300

3. Hacking of existing floor and wall tiles for Common Toilet --- 300

4. hacking of existing existing concrete base for sink/stove support at kitchen --- 150

5. Hacking of toilet bowls, basins and basin concrete supports --- 80

6. Hacking of existing wall between Master Bedroom and Bedroom 2 --- 280

7. Dismantle and dispose existing Kitchen Cabinets --- 180

8. Dismantle and dispose existing Wardrobe, Bedframe and Bedhead in Master Bedroom --- 200

9. Dismantle and dispose existing L-boxes in Living/Dining and Master Bedroom --- 200

10. Dismantle and dispose existing doors at Kitchen Entrance, Master Toilet entrance and Common toilet entrance --- 80

11. Hacking of wall between living hall and common bedroom & make good wall --- 260

12. Dismantle and dispose existing L-boxes in Bedroom 2 --- 120

B. Masonry Works

1. Supply and lay ceramic/homogeneous floor tiles for Kitchen (range of tiles $3psf) --- 880

2. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for master Toilet (range of tiles $3psf) --- 1400

3. Supply and construct non-slip ceramic/homogeneous floor and wall tiles for common toilet (range of tiles $3psf) --- 1400

4. Supply and construct shower kerb for master toilet --- 90

5. Supply and construct shower kerb for common toilet --- 90

6. Apply waterproofing membrane for master toilet --- 120

7. Apply water proofing membrane for common toilet --- 120

8. Apply water proofing membrane for kitchen --- 150

9. Supply and construct new wall between Master Bedroom and Common Bedroom at Proposed new location --- 980

10. Plaster smooth existing wall tiles at kitchen --- 650

11. To make good affected area after demolition of existing wall --- 180

12. Replace 15pcs of granite floor (include hacking) --- 1080

13. Supply and install granite skirting --- 150

C. Ceiling and Partition Works

1. Supply and install plasterboard false ceiling and cove light box at foyer/living & dining as discussed --- 980

2. Supply and install plasterboard flase ceiling and cove light box at master Bedroom --- 630

D. Plumbing Works

1. Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets) --- 650

2. Supply and replace new stainless steel piping for washing machine --- 50

3. Supply and replace new conceal drain pipe for washing machine --- 50

4. Supply and replace new stainless steel piping for sink --- 50

5. Supply and replace new conceal drain pipe for sink --- 50

6. Supply labour to install new kitchen sink and tap --- 60

7. Supply labour to intall all basins and tap --- 120

8. Supply labour to install all toilet bowls --- 160

9. Supply labour to install all toilet accessories --- 40

E. Doors/Glass/Windows

1. Supply and install timber door frame at new proposed Master Bedroom --- 150

2. Labour to remove and reinstall existing door for master bedroom --- 60

3. Supply and install 10mm tempered glass shower screen at master toilet c/w hand rail & towel rail ---380

4. Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail --- 380

5. Supply and install acrylic bi-fold door at common toilet --- 200

F. Carpentry Works

1. Foyer: Full height feature wall with Tic-Tac door & shoe cabinet to cover HHS door in laminate finish (7ft) --- 1400

2. Living: Half height TV feature wall in laminate finish (8ft) --- 830

3. Living: Suspended TV console in laminate finish (6ft) --- 720

4. New Dining: Construct full height feature wall with 2 strips of horizontal mirror in laminate finish (13ft) --- 2880

5. New Dining: Construct L-shaped settee with storage (13ft) --- 1500

6. New Study Area: Construct suspended working table (9ft) --- 590

7. Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmins finished c/w anti slam soft closing hinges. 1pc aluminium framed frosted glass door, stainless steel dish rack and cutlery tray (35ft) --- 3750

8. Kitchen: L-shape solid surface top for cabinet (15ft) --- 970

9. Kitchen: Labur to install cooker hob & hood --- 40

10. Master Bedroom: Construct partition wall to create walk-in wardrobe (15ft) --- 680

11. Master Bedroom: Construct frosted glass door for walk-in wardrobe --- 400

12. Master Bedroom: Construct walk-in wardrobe in color pvc --- 2090

G. Whole House and Generals

1. Painting of whole house walls/ceilings with Nippon Paint (5 color + 1 white for ceiling) --- 900

2. painting of all pipings, bedroom doors/frames and varnish main door --- 250

3. Supply and lay corrogated board to protect existing granite flooring (incude disposal) --- 150

4. Debris removal --- 300

5. haulage fee --- 350

6. Acid wash and general cleaning --- 180

H. Electrical Works

1. Add/shift 1 no. socket power outlet --- 45

2. Add/shift 1 no. double socket power outlet --- 55

3. Add 1 no. oven point --- 90

4. Add 1 no of light point/cooker hood point --- 35

5. Install 1 no. ceiling/false ceiling light/cove lighting --- 10

6. Add/shift 1 no SCV point --- 120

7. Add/shift 1 no tel point --- 45

GRAND Total of $32,530. Mine is a 4A HDB resale flat, 92 sqm.

Any comments? Please help!

I think it is quite reasonable, u have got quite a lot of carpentry work and carpentry work is the most expensive stuffs.

Try to get your ID/Contractor to give u a discount from the final bill or to waive some of the carpentry dismantle cost.

 

Share this post


Link to post
Share on other sites
  new_shopper said:
Hi Dean

I am currently going thru my reno with Summit Design and honestly I think they are quite average. There are not much designs and workmanship is just above average compared to the price. U also have to monitor the work and schedule otherwise there will be deviation or delay in time (workers not available, work has not been finished, etc). So if u already know what u want to do (just browse thru some reno magazine/ internet for ideas), my advice to all will be to go for contractor rather than ID. Cause it will be a lot cheaper at the end.

Since I have learnt and benefited from so many forummers here, I thought I will also share my input for the benefit of others.

Can u pls pm me contractor of Summit desgin pls...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×