must get model 005? cant settle on model 001?

model 001 too small, my chute hole very big. dunno why so big :D

you have any complaints about model 005?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Day 7

1 man hacked the remaining of the flooring for bathroom and toilet, gas pipe was terminated

Total cost for the day's work: $100

Accumulated cost for labour: $700

Total cost for raw materials: $1055

Total reno bill as of now: $2755

Hi ossify,

Just had a peek at your blog....

Reno going on smooth smooth yah... :good: ...!....looking forward for more updates...... :D ....

Cheers!

:yamseng:

 

Share this post


Link to post
Share on other sites
was just informed that the rubbish chute I must get is model 005, not 001. model 005 costs $130, compared to 001's $80 :(

my old chute's dimensions are 485mm by 535mm

chutet.jpg

my new chute's dimensions are 500mm by 550mm, yellow colour (they only had blue, pink and yellow at the time)

005se.jpg

i don't know why my contractor say it can fit even though it looks bigger by 15mm length and width to me, guess i'll leave it to him :D

Edited by ossify
 

Share this post


Link to post
Share on other sites

Day 8

2 men came today, hacked skirtings, chipped off damaged tiles, planned plumbing, cleared debris

2 men working today

noon.jpg

Concrete skirting removed

skirting.jpg

Chipping off chipped tiles one by one

chipped2.jpg

Plumbing planning for washing machine, 2 basins and for bathroom, all these will be hidden when tiles are ready

waterplanning.jpg

All debris cleared, cost me $300

cleared.jpg

Total cost for the day's work: $200

Clearing debris: $300

Bought some more materials + sand + rubbish chute (model 005): $283.5

Hacking 50ft walls and clearing of debris: $1000

Accumulated cost for labour: $1200 (including clearing of debris)

Accumulated cost for raw materials: $1338.5

Total reno bill as of now: $3538.5

Edited by ossify
 

Share this post


Link to post
Share on other sites

got this from my first contractor's permit application, i like :D thank you HDB for approval :D

permit.jpg

approved.jpg

i only attached the top part of the approval letter, don't think it's necessary to upload all of it :D

Edited by ossify
 

Share this post


Link to post
Share on other sites
i am still constantly amazed at how you can DIY!

thanks :D went to Hansgrohe during lunch time to buy a set of Hansgrohe Raindance E AIR 1jet and a tap mixer for my MBR, total cost $258.41 after 25% discount :unsure:

lg-raindance-e-100-air-1-jet-porter-d-sh31700000.jpg

Edited by ossify
 

Share this post


Link to post
Share on other sites
ossify,

uhmm...are you a contractor or an ID before ? :dunno:

no.. i am just a reno newbie, my first house to be reno :D

you want to hire me? :D

contractors earn big money :rolleyes:

 

Share this post


Link to post
Share on other sites
no.. i am just a reno newbie, my first house to be reno :D

you want to hire me? :D

contractors earn big money :rolleyes:

HHAHAHA......how I wished I can hire you...but.....mine hse already done-up....no major reno.....so no big $$ for you bro!

cheers!

:yamseng:

 

Share this post


Link to post
Share on other sites
Day 8

2 men came today, hacked skirtings, chipped off damaged tiles, planned plumbing, cleared debris

Total cost for the day's work: $200

Clearing debris: $300

Bought some more materials + sand + rubbish chute (model 005): $283.5

Hacking 50ft walls and clearing of debris: $1000

Accumulated cost for labour: $1200 (including clearing of debris)

Accumulated cost for raw materials: $1338.5

Total reno bill as of now: $3538.5

Your house looks damm big after hacking away the walls. You sure it is a 3 room? :D

 

Share this post


Link to post
Share on other sites

Day 9

1.5 (one came at noon) men came today, planned and erected walls

Planning wall, laying strings took all morning

planningl.jpg

Zoom in on the strings, can you see them? :D

layingstrings.jpg

By evening time, walls are partially up (house seems smaller?)

wallsup.jpg

Zoom in on the MBR shower area (see the strings?)

mbrtoilet.jpg

Zoom in on the common toilet, sorry for blurness (strings?)

toiletk.jpg

Total cost for the day's work: $150 (one man half day)

Hacking 50ft walls and clearing of debris: $1000

Accumulated cost for labour: $1350 (including clearing of debris)

Accumulated cost for raw materials: $1338.5

Total reno bill as of now: $3688.5

Edited by ossify
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×