sherwinsm 1 Report post Posted August 17, 2009 wow, your place is huge! Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 19, 2009 wow, your place is huge! Yes. The area size is 151 sqm. Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 19, 2009 Wah so huge Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 20, 2009 Wah so huge Hahahahaha it's really HUGE! We have finalized the design last Monday and I am now waiting for their final quotation. I am so so excited to start this project. Share this post Link to post Share on other sites
Happy Gal 0 Report post Posted August 21, 2009 Hahahahaha it's really HUGE! We have finalized the design last Monday and I am now waiting for their final quotation. I am so so excited to start this project. Hi, Can you share your final quotation with me. Your house design really nice, I wish to have an idea how munch will it need. thansk you Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 22, 2009 Hi, Can you share your final quotation with me. Your house design really nice, I wish to have an idea how munch will it need. thansk you I have just sent u a PM. Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 22, 2009 Hahahahaha it's really HUGE! We have finalized the design last Monday and I am now waiting for their final quotation. I am so so excited to start this project. Great ! do remember to post pics as you goes along Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 22, 2009 Great ! do remember to post pics as you goes along Sure dear... Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 23, 2009 (edited) By the way, here's the quotation from my ID as of our last meeting last Monday: HACKING & HAULAGE Hack Existing Master Toilets' Floor and Wall Finishes Hack Existing Common Toilets' Floor and Wall Finishes Hack Existing Kitchen's Floor Finishes Hack Existing Skirting for Overlaying of Laminate **** Room Remove Existing Carpet Finishes at Bedroom 3 Haulage of New & Raw Materials Clearing of Debris HACKING OF WALL(s) (Subject to Approval) Hack Existing Wall at Common Toilet PRELIMINARY WORKS Make Good Hacked Skirting Area(s) & Plaster Smooth Make Good Hacked Doorway & Plaster Smooth (Existing Doorway; TM Preparation Work for New Doorframe) Seal Up Existing Doorway w/ Hollow Blocks & Plaster Smooth C/w Lintor WET WORKS COMMON TOILET Supply & Lay Homogeneous Wall Tiles > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Supply & Lay Homogeneous Floor Tiles > Selection of Tiles: Up to $2.50 psf Waterproofing MASTER TOILET Supply & Lay Homogeneous Wall Tiles > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Supply & Lay Homogeneous Floor Tiles > Selection of Tiles: Up to $2.50 psf Waterproofing BATHTUB SUPPORT Construct Tiled Cement Support for Bathtub KITCHEN Supply Labour and Material to Plaster Smooth Kitchen Wall Supply & Lay 600 x 600 Homogeneous Floor Tiles > Selection of Tiles: Up to $3.00 psf Waterproofing Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets Construct Tiled Cement Base for Refrigerator Construct Tiled Cement Base for Washing Machine CEILING WORKS Construct False Ceiling ****/Dining Room Construct Curtain Pelmet ****/Dining Room (Window Areas) Construct False Ceiling at Master Bedroom LAMINATE FLOORING Supply & Install Laminate Flooring ****/Dining Room (Includes: Skirting) Supply & Install Laminate Flooring at 2x Bedrooms (Includes: Skirting) PARQUET FLOORING REPAIRS of EXISTING PARQUET FLOORING Re-Grind & Re-Varnish Existing Parquet Flooring at 3x Bedroom 3 room WALLPAPER WORKS Supply & Install Wallpaper at Master Bedroom Bedhead CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. LIVING ROOM Supply & Install Full-Height Feature Wall For TV Console 7 feet Supply & Install Suspended TV Console 7 feet MASTER BEDROOM Supply & Install Built-In Full-Height Walk-In Wardrobe Carcuss (Interior: Colour Polykem) 10 feet KITCHEN Supply & Install Built-In Kitchen Counter Top 7 ft run Supply & Install Built-In Kitchen Cabinets 40 ft run > Includes: Choice from FULL RANGE Latest Laminates (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply & Install Solid Surface Top 21 ft > Includes: Standard Back-Splash & Front-Edge Profiling PARTITION WORKS Construct Partition Wall at Bedroom 4 288 feet Construct Waterproof Partition Wall at Kitchen GLASS WORKS Supply & Install Full-Height Clear Tempered Glass Panel(s) (10mm) at Master Toilet 21 sq feet DOORS, SCREENS & WINDOWS ROOM DOORS Supply & Install Nyatoh Doorframes 2 nos. Supply & Install Classic Room Doors w/ Lockset 2 nos. Supply & Install Toilet Bi-Fold Doors - Aluminium Frame w/ Acrylic Panels 1 nos. Supply & Install Swing Door at Kitchen Entrance 1 nos. SHOWER SCREENS Supply & Install Frameless Tempered Glass Shower Screen (Includes: Towel/Hand-Rail) 1 unit PLUMBING WORKS Supply & Connect Copper Piping for Whole House ( 2x Toilets) (for HDB Exposed Piping Only) Labour to Install Instant Water Heater & Shower Labour to Install Toilet Wash Basin & Mixer 2 nos Labour to Install Pedestal W.C.. 2 nos Labour to Install Bathroom Accessories (5 pcs) 2 nos Supply & Connect Water Point for Bathtub 1 nos Labour to Install Bathtub 1 nos PAINTING WORKS Painting Works for Whole House > FULL RANGE of Paints from NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) Washing of Whole House (Twice: 1 Acid Wash + 1 General Cleaning) Thanks. Edited August 29, 2009 by yhanie_17 Share this post Link to post Share on other sites
winnie 0 Report post Posted August 23, 2009 (edited) Hi yhanie, 3D beri beri nice. I like it. Quote look ok. But, why dun have electrical ? Edited August 31, 2009 by JuzChris Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 24, 2009 Hi yhanie, 3D beri beri nice. I like it. Quote look ok. But, why dun have electrical ? Electrical will be assessed once they see the unit on 13th Sept. Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 25, 2009 Hope you can comment out on the quotation given above so I can re-negotiate the price with my ID. Thanks. Share this post Link to post Share on other sites
wywy219 0 Report post Posted August 28, 2009 Hi I'm new here and our new home is also in Tampines! Yhanie17, you are not doing retile for living room? Mine is a 4A 104sqm. our first quote from one of the shortlisted ID is abt 30k. *stressed* with simple design, minimal fixture but change all tiles. We also shortlisted **. but haven't got a quote from them. Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 28, 2009 Hi I'm new here and our new home is also in Tampines! Yhanie17, you are not doing retile for living room? Mine is a 4A 104sqm. our first quote from one of the shortlisted ID is abt 30k. *stressed* with simple design, minimal fixture but change all tiles. We also shortlisted **. but haven't got a quote from them. Mine is laminated flooring only which we really prefer. By the way who is your ID? I can refer you to my ID if u want. Can you PM me your details so I can help you to work with them. Share this post Link to post Share on other sites
yhanie_17 0 Report post Posted August 30, 2009 Here's the new Master Bedroom Look with Wall Paper. Share this post Link to post Share on other sites