Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
SmallCarrot

Ceiling, Walls Flooring Works Wanted

Recommended Posts

4 A 103sqm old HDB.

Please quote all in total.

1. 800x600 homogeneous flooring and hacking existing tiles service

2. New kitchen cabinet + sinks and hacking existing old cabinets

3. Rewiring whole house electrical

4. Brand new water piping whole house

5. Toilets flooring, basins and toilet bowl x 2

6. White Nippon Paint whole house including polishing to smooth out the wall ( 3 layers )

No wardrobe, no false ceiling and just basics renovation work.

No design jobs needed other and I will buy all materials. Thanks to recommend me any good contractor with warranty workmanship and to quote me for the above jobs. I will pass him the floorplan as well.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

I done up my place 4A 101sq meter with 21k

No wardrobe, no false ceiling (use back old one)

Can read up my thread see you interested on my contractor or not.

Cheer

 

Share this post


Link to post
Share on other sites
I done up my place 4A 101sq meter with 21k

No wardrobe, no false ceiling (use back old one)

Can read up my thread see you interested on my contractor or not.

Cheer

Wow it save me 10k. Good deal. I saw online most quotes 30~35k. Now financial crisis I hope contractors don't do cheating works like extending delivery date or bargain during constructions period. They could easily cut down the labour from 3 to 1 and do the work slowly. Instead of complete work in 3~4 weeks the contractors share labour in various projects and do in 8~12 weeks.

Another thing is warranty. I want to pay for warranty instead of reputation.

Edited by SmallCarrot
 

Share this post


Link to post
Share on other sites
Wow it save me 10k. Good deal. I saw online most quotes 30~35k. Now financial crisis I hope contractors don't do cheating works like extending delivery date or bargain during constructions period. They could easily cut down the labour from 3 to 1 and do the work slowly. Instead of complete work in 3~4 weeks the contractors share labour in various projects and do in 8~12 weeks.

Another thing is warranty. I want to pay for warranty instead of reputation.

mine done in within 1 month - everything quite fast except painting . That time , i rem only 1 guy doing the paint job slowing . ha.

Warranty wise - I think 3-5yrs on tile and cabinet . Can't rem already. Can call to find out if u need .

laminated wood is lifetime warranty .

 

Share this post


Link to post
Share on other sites
mine done in within 1 month - everything quite fast except painting . That time , i rem only 1 guy doing the paint job slowing . ha.

Warranty wise - I think 3-5yrs on tile and cabinet . Can't rem already. Can call to find out if u need .

laminated wood is lifetime warranty .

After saw your result i must say the quality is very good. How much time needed for discussion before the actual work really starts? So far I do not see anyone provide the service to polish/plaster the wall smoothly. What is this job call? I like smooth and flat wall and ceiling.

 

Share this post


Link to post
Share on other sites
I dun really know wor. But i found my contractor even b4 1st appointment . I think that one should be platering ba. Not too such

Instead of plastering, there are other choice like granite on the wall or wooden flooring on the wall. I just started to find the contractor now.

 

Share this post


Link to post
Share on other sites
4 A 103sqm old HDB.

Please quote all in total.

1. 800x600 homogeneous flooring and hacking existing tiles service

Total sqft? Hacking whole house flooring for 4Rm should be around $2K + disposal.

2. New kitchen cabinet + sinks and hacking existing old cabinets

Total sqft(top & bottom?) and doing what type of kitchen countertop? Hacking and disposal old cabinet is ard $200.

3. Rewiring whole house electrical

Mostly it calculate by how many electrical points.

4. Brand new water piping whole house

Changing to all s/s piping ~ $1K.

5. Toilets flooring, basins and toilet bowl x 2

1 toilet floor is ard $200 per day. basin and 2 toilet bowls are around $200.

6. White Nippon Paint whole house including polishing to smooth out the wall ( 3 layers )

Whole house painting is around $1.2K (3 coating), make good, plastering and smoothen the wall should be around $1K too.

No wardrobe, no false ceiling and just basics renovation work.

No design jobs needed other and I will buy all materials(what materials u are buying, waterproofing membere, cement, sand, bonding agent, tiles, laminate, etc?). Thanks to recommend me any good contractor with warranty workmanship and to quote me for the above jobs. I will pass him the floorplan as well.

Hi Smallcarrot,

U need to give more information so that others can help or give suggestion. :)

 

Share this post


Link to post
Share on other sites
Hi Smallcarrot,

U need to give more information so that others can help or give suggestion. :)

Very nice of you. I am going to post my Floor Plan tonight.

The material I refer to is those off-the-shelf stuff like what duravit toilet, whole-wall size large Mirrors, basins, lighting and etc. Construction materials I will choose the most commonly available one for easy sourcing of materials for contractors.

I want some contractor can commit to work from mid oct ~ end nov. 5~6 weeks for full house reno. All are welcome to PM me and I will contact you immediately.

 

Share this post


Link to post
Share on other sites
floorplan.gif

floorplan_new.gif

Not possible and no contractor or ID will able to do this for u. There no way u can make a full length windows at all. Hacking the beam and all the wall inside, I don't think PE will approve on it, especially on the beam.

 

Share this post


Link to post
Share on other sites
Not possible and no contractor or ID will able to do this for u. There no way u can make a full length windows at all. Hacking the beam and all the wall inside, I don't think PE will approve on it, especially on the beam.

For the renovation, sad to say i got myself a terrible contractor tat got my reno delayed by 1 mth, so i l not recommend on him, but i do have a gd experience on getting myself a gd deal on laminated flooring, from the sales person to installation, its perfect n the floor range looks really cool, coz i bought thier vintage range, its looks like a real wood compare to many brands out there looks more fake n like plastic.

i also tink its wise to contact them directly as u will get better offer. call Alex Aw at 9xxx xxxx if u need floorings, hes reliable.

Edited by JuzChris
Contact nos removal
 

Share this post


Link to post
Share on other sites
For the renovation, sad to say i got myself a terrible contractor tat got my reno delayed by 1 mth, so i l not recommend on him, but i do have a gd experience on getting myself a gd deal on laminated flooring, from the sales person to installation, its perfect n the floor range looks really cool, coz i bought thier vintage range, its looks like a real wood compare to many brands out there looks more fake n like plastic.

i also tink its wise to contact them directly as u will get better offer. call Alex Aw at 9xxx xxxx if u need floorings, hes reliable.

How come you keep spamming all over the threads?

I have a feeling your name is Alex Aw.

Edited by JuzChris
Contact nos removal
 

Share this post


Link to post
Share on other sites

yaa....sad to say my contractor is also taking his own sweet time with my works.....(it's been 7weeks) and only wet works are almost completed. everyday only 1 to 2 workers showed up.....i got so fed up that i scolded him and tell him to put in writing a reasonable completion handover date, otherwise I will consider imposing a LD clause. :bangwall:

however, i am thinking how am i suppose to call on the warranty (1yr) should the need arise since the final payment will be made upon completion and satisfactory handover. there's no retention sum or banker's guarantee like in other commercial contracts. so how to enforce our warranty rights?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×