Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
koxxic

Any Sembawang Homers?

Recommended Posts

actually i tink 359 & 357 mbr's are rectangular and not rounded... these are the only 2 blks which EAs are rectangular and not rounded... i do not have the floor plan with me... mus check with albert... :bow:

Whoops.... sorry, candyprincess is right. :bow:

You can see the shape in the pic.

The blue one is the EA.

357lm8.jpg

359cm4.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
softballer, you just booked your flat? i remember seeing some mssg in the earlier threads. which block you in? I just called up HDB again. And sighz... tell me to wait somemore. cos got a lot of other admin work after the retiling and stuff completed.

wait wait wait wait

:deal::P:(:furious::furious:

sorry haven come in here for a while.. busy with stuff...

me in 356b.. still waiting for keys.. looking for wedding stuff.. busy busy busy..8|!

 

Share this post


Link to post
Share on other sites

yo neighbours... long time no see... quite a no of new ones...

can i checked with anyone who got their keys... are both toilet doors the same?? i've got two diff designs for the bi-fold doors...

 

Share this post


Link to post
Share on other sites
yo neighbours... long time no see... quite a no of new ones...

can i checked with anyone who got their keys... are both toilet doors the same?? i've got two diff designs for the bi-fold doors...

i went to check out my new house (though i haven't got the keys yet). The bi-fold doors are different. The one at the common toilet looks :jawdrop: should be changing that..

 

Share this post


Link to post
Share on other sites

looks wise... the MBR's one is better... but hor... when we try to close it... we noticed that the common toilet's is more smooth... and when we close and lock up the MBR's toilet's door, the door is not parallel to the kerb (there is a slight 'V')... dunno can change or nt...

 

Share this post


Link to post
Share on other sites
looks wise... the MBR's one is better... but hor... when we try to close it... we noticed that the common toilet's is more smooth... and when we close and lock up the MBR's toilet's door, the door is not parallel to the kerb (there is a slight 'V')... dunno can change or nt...

I dun think can change. How is ur toilet bowls?

 

Share this post


Link to post
Share on other sites
looks wise... the MBR's one is better... but hor... when we try to close it... we noticed that the common toilet's is more smooth... and when we close and lock up the MBR's toilet's door, the door is not parallel to the kerb (there is a slight 'V')... dunno can change or nt...

hmmm if u see it as a defect then jus put it into the list... i think if you cannot close properly then jus get them to change it... anyway when u submit, the officer will meet up with ya'l at ur plc to check out the defects together.... my mbr closure also nt smooth but i jus close one eye la... anyway will be oni hubby & me using for nw.. becos we plan to overhaul our toilets in 2-3 yrs time bah... agree that common toilet door smoother but doesnt look that nice... argh! mus tahan!:jawdrop:

when u start reno ?

 

Share this post


Link to post
Share on other sites

must see when the hdb contractors finish the rectifications leh... sianz... the contractor says they will try to do something to the door so tat the closing will be smoother...

I want a new main door... sniff sniff...

 

Share this post


Link to post
Share on other sites
must see when the hdb contractors finish the rectifications leh... sianz... the contractor says they will try to do something to the door so tat the closing will be smoother...

I want a new main door... sniff sniff...

Ask HDB to change lor... Heh... actually ur ID cn start doing carpentry in their workshop 1st.. hmmm my ID needs to be :bleah:zz:P i very sian liao... keep telling me problems.. today i told him... if i wana mean i wil tell u... it is ur problem not my problem.. go settle it! he claims the people doing my carpentries did in wrong colour so had to redo... then now the person go msia becos someone in his family sick.. tomorrow then come back... anyway i told him by this weekend everything mus be finished!;) he also told me painting 5 days... started last week Wed... then tell me will probably finish today... :unsure:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×