Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
koxxic

Any Sembawang Homers?

Recommended Posts

according to my ID, its all done leh... he said last wk of july was chemical washing week leh but duno true or not? maybe i wil go by later to peek lo... i jus hope i go peek the door is opened.. if nt waste my time leh.. furthermore i dwn with sore throat n flu... heh..

that time i saw the notice outside my unit supposed to be finished le but i have not gone to see the plc for quite awhile lor... wil u be goin by later?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

i think the notice only refers to the tiling work, because the hacking, etc will disturb the neighbours. But it doesn't cover the touch up work, such as painting, chemical washing, changing doors...etc

Won't be going there today because my ID went down and look yesterday le, he told me they are painting the walls of my unit.

 

Share this post


Link to post
Share on other sites
eh only 1 cn license ah? my bro has 2 dogs leh... hmmm one GR and one poodle. hmmm... mus ask him heh

albert - yeah man.. tell me abt it.. hmmm.. maybe i shld go peek later... buden wait my unit locked then also sian go all the way there... heh...

Private property dun need license to keep dog. Maybe you can register the 2nd dog under your parent house instead.

 

Share this post


Link to post
Share on other sites

have you guys tried calling up your technical officer before? To check on the status of your unit? These technical officers are those on the ground ones which handles those contractors and defects/etc.

Those officer we had are purely from the HDB head office which have no ground ideas on how much rectification job have been done

 

Share this post


Link to post
Share on other sites

didnt knw abt that...

anyway, i called my ID to enquire and he says all done olredi but i didnt believe him la... hee heee... so despite having this bl**dy cough and nose issue, i went dwn to see the ongoings of our area jus nw.. Heh .... my door is locked! D**N!! Anyway, the workers are painting the external of 357B & 357C. My block i think the upper floors are done.. i saw one worker leveling the cement floor along the corridor on the 7th floor... i actually wanted to see if they were stil wrking on the units in my blk so i followed the noise and got a shock to see the guy leveling the floor with this heavy duty machine .. heh so i faster take lift dwn to 1st flr la... kekeke... looks scary la...

hmmm saw the bulletin board and it seems all will be completed by 27th Aug 2007. :yamseng: they started in June and will end by the end of this month... that's the date for the painting of interior and exterior... hmmm i think it means for all rectifications also bah... good news i guess... hehehe

also looked into the letterbox.. its full of trash! okie... leaflets.. Heh... managed to dig some out ... other half was saying shld leave it wait they stuff more inside.. hehehe i itchy hand la... also nth to do... hee hee hee...

also saw that the town council closed down already...

albert - u called the TO? any updates? Hehehehe

 

Share this post


Link to post
Share on other sites
didnt knw abt that...

anyway, i called my ID to enquire and he says all done olredi but i didnt believe him la... hee heee... so despite having this bl**dy cough and nose issue, i went dwn to see the ongoings of our area jus nw.. Heh .... my door is locked! D**N!! Anyway, the workers are painting the external of 357B & 357C. My block i think the upper floors are done.. i saw one worker leveling the cement floor along the corridor on the 7th floor... i actually wanted to see if they were stil wrking on the units in my blk so i followed the noise and got a shock to see the guy leveling the floor with this heavy duty machine .. heh so i faster take lift dwn to 1st flr la... kekeke... looks scary la...

hmmm saw the bulletin board and it seems all will be completed by 27th Aug 2007. :bangwall: they started in June and will end by the end of this month... that's the date for the painting of interior and exterior... hmmm i think it means for all rectifications also bah... good news i guess... hehehe

also looked into the letterbox.. its full of trash! okie... leaflets.. Heh... managed to dig some out ... other half was saying shld leave it wait they stuff more inside.. hehehe i itchy hand la... also nth to do... hee hee hee...

also saw that the town council closed down already...

albert - u called the TO? any updates? Hehehehe

candyprincess, albert, ur flats are completely new one is it? thus they do all the rectification together?

town council closed down?! how can?! lol

 

Share this post


Link to post
Share on other sites
also saw that the town council closed down already...

albert - u called the TO? any updates? Hehehehe

I didn't call the TO but my ID wanted to, because he wanted to check something with them.

Town council? You mean the Sembawang HDB office isit? :bangwall:

It didn't close that, but they are renovating that place to accomdate a 2 level NTUC inside the office :bangwall:

candyprincess, albert, ur flats are completely new one is it? thus they do all the rectification together?

town council closed down?! how can?! lol

Our is a vacant unit for a few years, so for this exercise, HDB offered to rehack and relay all tiles for us, touch up the paint job, change the toilet bowls etc for us.

 

Share this post


Link to post
Share on other sites

ooo kie... if ur ID have info let us knw ahhh heheheheh but i think end aug we shld be able to get dates of key collection... and maybe sept cn start renovating le bah hehe

 

Share this post


Link to post
Share on other sites

Alamak! Me slower than u, candyprincess... just found out abt this thread.. hahaha..

Let me see how I can upload the few pics that my hb managed to salvage fr the camera. But his photography skills abit kaput la. Wanted to go down today to take more pics n inspect the hse but then his cousin dropping by later.. so prob go on sat.

Kayser, u engaging EI? Me oso in the midst of selecting and EI is one option. How much did they quote u? Their kitchen exp leh! Mine now abt 17-18k for all the basics.

 

Share this post


Link to post
Share on other sites

Test test..

http://img522.imageshack.us/my.php?image=dsc00090ik0.jpg

aiya.. how cme the HS door open, blocking the view. !!

http://img505.imageshack.us/my.php?image=dsc00091pc3.jpg

(living room)

http://img253.imageshack.us/my.php?image=dsc00094ug8.jpg

(dining area)

http://img505.imageshack.us/my.php?image=dsc00095eg0.jpg

(kitchen from dining area.. the drainage is at the window, so if want to shift, have to do some hacking I believe?)

http://img253.imageshack.us/my.php?image=dsc00097tn6.jpg

(they left a "present" for me, in the form of a ladder.. haha)

That's all that I got fr the camera..

But for the toilets, here are the ones I took from the sample flat. Exactly the same..

http://img527.imageshack.us/my.php?image=150207014ls2.jpg

(common toilet)

http://img505.imageshack.us/my.php?image=150207017zx6.jpg

(MBR toilet)

 

Share this post


Link to post
Share on other sites

yeh... heee cant wait to see ur plc transform! eh the floor looks good leh... hehe... the walls are repainted also right? looking good.. hee hee... but the doors for the bedrooms quite ugly colour... Hehh...

 

Share this post


Link to post
Share on other sites

just got my keys on wednesday!! yeah

Alamak! Me slower than u, candyprincess... just found out abt this thread.. hahaha..

Let me see how I can upload the few pics that my hb managed to salvage fr the camera. But his photography skills abit kaput la. Wanted to go down today to take more pics n inspect the hse but then his cousin dropping by later.. so prob go on sat.

Kayser, u engaging EI? Me oso in the midst of selecting and EI is one option. How much did they quote u? Their kitchen exp leh! Mine now abt 17-18k for all the basics.

Yup. I'm engaging EI. I find their price reasonable among a few IDs I have contacted. My quotation is about 22-23k. Maybe you would like to pm me what are your basic items?

Of course the price cannot compared with contractors I think.

 

Share this post


Link to post
Share on other sites
kayser share ur quotation here also cn or not ah? heheh u have any pics to post or not??? share share k? heee so exciting!:jawdrop:!:)

I try to summarize cos i got no softcopy, so basically is typing out. As for pictures, i have not taken yet but will do so on sat cos was doing the opening ceremony on wed. anyway, the pictures are exactly the same as mystique !!

Wetwork: cabinet base; washing machine base; fridge base; MBR Toilet kerb

Celing: False ceiling, L-box, alcove lighting for living, dining, foyer, passage and MBR

Windows + Doors: Kitchen sliding glass door; MBR Toilet glass shower screen; casement window for service balcony

Plumbing: change whole house stainless steel water piping, install sinks, taps, shower heads + mixers, storage heater, basin, etc

Electrical: 19 lighting/switch points + install 30 light fixtures + additional aircon point

Painting: Whole house + all doors + pipings + varnish main door

Kitchen: 30 Ft cabinet + 21 ft solid surface + stainless steel backing; install sink, hood, hob, dish rack

Living + Foyer: 5Ft feature wall, 10 Ft half height shoe-cabinet, 2 ft full height cabinet

MBR: 13 ft wardrobe + 3 ft tv feature wall + 3 ft side table

Study: 10 Ft table + 8ft wall hung cabinet with shelves + 5 ft full height book cabinets

MBR Toilet: Vanity cabinet + box up piping + light pelmet

Miscellaneous: General cleaning + Floor protection + install kitchen & bathroom accessories + clear debris + permit

Total: 23k

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×