dsman 0 Report post Posted August 22, 2009 heee..is okie.. I got another tile. Thanks. need your advise. jason asking me to go look n select tiles. thing is...i do not know how he's gonna redo my toilets. yours got mosaic? Share this post Link to post Share on other sites
dsman 0 Report post Posted August 22, 2009 n its a small world. we r neighbours for now. im at blk 2c upper boon keng. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 22, 2009 n its a small world. we r neighbours for now. im at blk 2c upper boon keng. Oh....neighbours for now. I am Blk 2A at the moment. You will need to roughly know the color theme or how u would be doing your toilets. Most probably he will ask you to go Sin Lek to choose your tiles. I presume you will need to re-do your living room, dining room, balcony, kitchen and 3 toilets ya? You might want to go down and take a look at the tiles first and at the same time have a rough idea how u will want your toilets, kitchen and other rooms to look like. You have absolutely free-play to mix and match. Mine mosaic is more for my mirror. Most owners are using mosaic as part of the deco in align with the toilet wall tiles. Share this post Link to post Share on other sites
pinkydot 0 Report post Posted August 22, 2009 Hi Red_devil, Do u mind PM me ur quotation? Cos i will be doing an overhaul for my EM too. So far i only got one quotation fr an ID but is not within my budget... been to a few IDs & Contractors but no ans fr them yet Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 22, 2009 (edited) Hi Red_devil, Do u mind PM me ur quotation? Cos i will be doing an overhaul for my EM too. So far i only got one quotation fr an ID but is not within my budget... been to a few IDs & Contractors but no ans fr them yet Sure. No problem. Could you pm me your e-mail so I can email to u? huh...did you call every of the IDs and contractors and chase them for a quote. Do hope u find a contractor or ID for your EM soon. Edited August 22, 2009 by red_devil Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 22, 2009 hi. wats the stuff u want done? lots of carpentry? Not really but I will have to redo all my flooring and stairs thus the high cost. Share this post Link to post Share on other sites
pinkydot 0 Report post Posted August 22, 2009 Sure. No problem. Could you pm me your e-mail so I can email to u? huh...did you call every of the IDs and contractors and chase them for a quote. Do hope u find a contractor or ID for your EM soon. Tat's great. Thank u so much. Ya...I did call them after 2 to 3 wks of waiting...some of them would just say "Ohh..ya ya ya...I reber. Just gv me another one more wk". Actually i'm doing a really major overhaul as the flooring at 1st & 2nd flr some were cracked. Including staircase, Windows, Doors.... Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 22, 2009 Tat's great. Thank u so much. Ya...I did call them after 2 to 3 wks of waiting...some of them would just say "Ohh..ya ya ya...I reber. Just gv me another one more wk". Actually i'm doing a really major overhaul as the flooring at 1st & 2nd flr some were cracked. Including staircase, Windows, Doors.... No worries. Pinkydot. I have send to your e-mail. Hmmm...I guess most of them..esp the IDs will want you to go down to their firm so that they can do their sales talk. Oh....so u are doing a major overhaul too huh... My parquet flooring on the second floor wasn't of good condition either. Initially, I thought I will need to change the flooring...fortunately, I talk to my contractor and he told me I can retain the flooring by smoothing and polishing it + replace some of the parquet. I hope your 2nd flr flooring is not tiles...if not, chance of saving it is slim. Wife and I are tight on budget also. We are saving money on the windows as the conditions are still consider acceptable and can be covered by curtain. However, we need to replace the windows in our balcony. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 (edited) Renovation progress on 21-Aug-2009 Kitchen's wall tiles completed. Base for kitchen in progress. Edited August 23, 2009 by red_devil Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 21-Aug-2009 - 80% tiles completion for first floor toilet; pasting a mosaic mirror on top of grey tiles. Tiles on walkway to toilet + toilet 70% completion. (Common toilet - second floor) Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 21-Aug-2009 - MBR toilet tiles completion Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 21-Aug-2009 - Re-constructing of door frame in progress. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 22-Aug-2009 - Workers moving sand for us. As there is no lift landing for my unit, they have to climb the stairs. Sorry brothers... Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 23, 2009 22-Aug-2009 - Washing machine base in progress. Share this post Link to post Share on other sites