red_devil 0 Report post Posted August 19, 2009 hi. mine dakota. 26 years. major overhaul including staircase. jason quoted me below 50k. agreed to his price. reno will commence mid nov. Hi dsman, dakota is a nice place..is near the Old Kallang Airport ya...the food there is yummy.. Look like u got a good deal than me I think... ..including staircase..... Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 20, 2009 hi. mine dakota. 26 years. major overhaul including staircase. jason quoted me below 50k. agreed to his price. reno will commence mid nov. Yo bro finally you've appeared...so you've agreed to let Jason took up the job ? May I know what is your request HO date ? Also when you mentioned major overhaul, did you replace the windows and do re-wiring ? Cheers Share this post Link to post Share on other sites
Sheila Ong 0 Report post Posted August 20, 2009 Hi beans so you started your reno already ? Also did you redo your wiring ? Pai seh my reno starting in november.. Hmmm dunno if need to rewire.. Must ask my dad first.. But i think the flat so old liao rewire safer right? Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 20, 2009 (edited) Pai seh my reno starting in november.. Hmmm dunno if need to rewire.. Must ask my dad first.. But i think the flat so old liao rewire safer right? Oh I was hoping if I can start during that time too Like some of the bros and sis have advised me, it depends on whether the previous owner have done or not. Can always ask your contractor to check it out. Also it depends on how long you would like to stay in the unit, if it's for maybe 5 yrs or less then doing it might not seems worth while. I intend to do it since I might be staying there for many many years hahahahaa Edited August 20, 2009 by coffee_o Share this post Link to post Share on other sites
Sheila Ong 0 Report post Posted August 20, 2009 Oh I was hoping if I can start during that time too Like some of the bros and sis have advised me, it depends on whether the previous owner have done or not. Can always ask your contractor to check it out. Also it depends on how long you would like to stay in the unit, if it's for maybe 5 yrs or less then doing it might not seems worth while. I intend to do it since I might be staying there for many many years hahahahaa Haha confirm the previous owners nv do it cos the whole flat was in original condition. Very bad.. I think i'll be staying for a long time too and i don't want to save now and end up having to break the ceiling and redo next time when my house swee swee already.. All the best to your reno! Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 20, 2009 (edited) Haha confirm the previous owners nv do it cos the whole flat was in original condition. Very bad.. I think i'll be staying for a long time too and i don't want to save now and end up having to break the ceiling and redo next time when my house swee swee already.. All the best to your reno! Yes thats my considerations too. It will be a pain to do reno when you're already staying inside. So might as well do one time swee swee and heart pain abt the vitamin M one time hee hee Yup thanks thanks All the best to your reno too Edited August 20, 2009 by coffee_o Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 20, 2009 20-Aug-2009 Kitchen wall tiles completed - Still prefer the one did on 17-Aug, but wife prefer to change the orientation. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 20, 2009 20-Aug-2009- MBR Toilet wall tiles - completed Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 20, 2009 20-Aug-2009 Changing our MBR toilet door width and location..Much better after the hacking. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 20, 2009 Common toilet second floor - Dry area completed Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 20, 2009 Reach our place at 7 p.m. Workers are packing up... Took a snap shot of them leaving at 7:30 p.m. Lady boss call it a day. Another day of hard work. Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 21, 2009 (edited) 20-Aug-2009 Kitchen wall tiles completed - Still prefer the one did on 17-Aug, but wife prefer to change the orientation. Bro like what Jason says, most importantly is that your wife likes it Oh btw i met Jason yesterday night, chat with him till nearly 10 pm Edited August 21, 2009 by coffee_o Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 21, 2009 Common toilet second floor - Dry area completed Bro may I know where you select your tiles ? I like this one with printings on it thanks Share this post Link to post Share on other sites
forkie 0 Report post Posted August 21, 2009 Wah your tiles all got hidden hidden flower patterns de ah lol ! My lady like your tiles alot ! Nearly took them but only stop when we finally came out with the theme "Linear" for our hse. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 21, 2009 (edited) Bro like what Jason says, most importantly is that your wife likes it Oh btw i met Jason yesterday night, chat with him till nearly 10 pm So how did it go? I think he should be able to advise u quite a fair bit of stuffs.. heehee. Hopefully, you find your desirable ID or contractor soon man. Looking forward to your major overhaul project. heehee p.s.: Tiles is at Sin Lek @ Eunos. Edited August 21, 2009 by red_devil Share this post Link to post Share on other sites