red_devil 0 Report post Posted August 18, 2009 (edited) 15-Aug 2009 Tiles arrived. Can't really see well the tiles. My apology. Edited August 18, 2009 by red_devil Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 (edited) Still tiles.. tiles for living room. sands....Sorry if it bored u...posting some of it to remind myself status of reno. Edited August 18, 2009 by red_devil Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 Cement and paper to protect the parquet flooring. Toilet hack for 15 Aug 2008. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 17 Aug - 6 p.m. Night reccee.. Realise tiles is lay in such a way wife don't like. As pattern of flowers on tiles not to my wife's liking. Decided should be the other way. Called Jason. Say not too late to tear down... He say will call us back......we wait while looking at the kitchen wall..Almost wanted to accept since tilers was too fast...almost completed 3.5 of the walls... Called Jason...but he say nvm... and at the same time, the team was activated to come back. Suprised they are back so fast.within 10- 15min while we are still there. We decided to tear down feeling a bit paisey. We are happy with the response and Jason's attitude. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 MBR TOLIET - Tues (18/08/2009) Confirm final toilet internal layout with Jason as hacking was completed. The wrong layout of tiles.. This is the last scene on 17/08/2009 ....on the 18/08/2009 at 11 a.m... tiles are lay correctly. Old layout was tear down. Actually, I don't see a problem with the intial layout....but my wife doesn't see it this way... But, Jason said...."Your wife happy can already, u are paying me money. I suppose to make both of u happy within reasonable requests." But, stilll...we feel paisey. Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 Starting of another side of the kitchen wall. Soaked Tiles for laying. 水泥增强剂,问过jason才知道,加了这个之后水泥会更加耐 Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 (edited) Taking a break - Jason "eating snake". Drinking our Tea-O. We caught him red-handed. 负责给我们贴砖的专家 Liu Bei, Cao Cao and Sun Quan Edited August 18, 2009 by red_devil Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 MBR Toilet confirm layout.. 冲凉房会是靠窗那面墙 900*1000 窗户jason会resize,来fit 冲凉房 Water pipes to be covered. - MBR Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 18, 2009 Second floor - common toilet - water pipe to be covered. Window to be resized. First floor - common toilet - water pipe to be covered. Window to be resized. That all for tonight. Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 19, 2009 Liu Bei, Cao Cao and Sun Quan Wah 三国演义 ? So they're having wars in your place ? No wonder so messy hahahaha Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 19, 2009 ....on the 18/08/2009 at 11 a.m... tiles are lay correctly. Old layout was tear down. Actually, I don't see a problem with the intial layout....but my wife doesn't see it this way... But, Jason said...."Your wife happy can already, u are paying me money. I suppose to make both of u happy within reasonable requests." But, stilll...we feel paisey. Shhh......don't tell your wife hor, actually I prefer the first initial layout But like Jason says, most importantly your wife must be happy Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 19, 2009 Eh bro Can help me remind Jason that I'm still waiting for his quote since last week ? I managed to contact him this morning but scared he forgets again Tell him I'm Sim or 沈 from 148 Tampines. EM also thanks thanks Share this post Link to post Share on other sites
familyof4 0 Report post Posted August 19, 2009 good progress Ben U settled the re-wiring part? Share this post Link to post Share on other sites
red_devil 0 Report post Posted August 19, 2009 (edited) Coffee O: Roger that, bro. I called him to remind him already...he say will get back to u within these few days...As he is hacking some flats this week. Fannie: Taking your advice, we are not going to re-wired....Cause seriously, I don't see the needs to spend on it since the wires are doing good as the contractor has check it. *Crossed finger* Afterall, even if is re-wired...if the electrican is not up to standard....is as good as not re-wiring....that how I see... Edited August 19, 2009 by red_devil Share this post Link to post Share on other sites
coffee_o 1 Report post Posted August 19, 2009 Coffee O: Roger that, bro. I called him to remind him already...he say will get back to u within these few days...As he is hacking some flats this week. Fannie: Taking your advice, we are not going to re-wired....Cause seriously, I don't see the needs to spend on it since the wires are doing good as the contractor has check it. *Crossed finger* Afterall, even if is re-wired...if the electrican is not up to standard....is as good as not re-wiring....that how I see... Wah thanks thanks He very bad leh always dun answer my call hopefully if I do engaged him to do it, he will not be like that leh hahahah How old is your flat ? mine is more than 20 yrs old so i guess mine will die die have to do the rewiring Share this post Link to post Share on other sites