merryman 0 Report post Posted July 20, 2009 congrate on finalizing......so when will show u de 3D? actually only doing cabinet, so only going to have 3D drawing for kitchen hor... ID said try to give me by this week or next since we only going to start work on 21st Sept (20th is the holiday, 19th is sunday, grrr) Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 20, 2009 actually only doing cabinet, so only going to have 3D drawing for kitchen hor... ID said try to give me by this week or next since we only going to start work on 21st Sept (20th is the holiday, 19th is sunday, grrr) then what yr 20k include of?tiling? u going to dong tu before reno? Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 then what yr 20k include of?tiling? u going to dong tu before reno? dong tu b4 reno? we starting after 7th month... mine is not up to 20k lar...lesser.. i updated the list of works on page1 liao.. Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 Renovation list Hack away 2 toilets floor tiles & wall tiles Cement creed kitchen floor tiles Remove old rubbish chute and old kitchen cabinet Supply & install 2 toilets wall tiles Supply & install 2 toilets floor tiles c/w anti-slippery abilities Supply & install kitchen floor tiles c/w anti-slippery abilities Supply & install floor tiles at the entrance of the main door Supply & install laminate for living room, bedrooms and store Supply & install bi-fold door at the master bedroom toilet Supply & install bi-fold door at the common toilet Install accessories Install 2 set of pedestrial pans Install 2 set of water basins Supply & install stainless steel water pipe for cold water for the whole unit Repaint door frames and doors for 2 bedrooms and store Supply & install 15ft bottom kitchen cabinet Supply & install 15 ft solid surface kitchen table for the kitchen cabinet Supply & construct 2inch base c/w tiles for kitchen cabinet & fridge Supply & install stainless steel rubbish bin Painting for whole unit with Nippon 5+1 paint Supply & install new main door Supply & install new main gate Supply & install new set of windows for whole unit Supply & install new set of window grille for whole unit Supply & Install 2 set of nacro windows at 2 toilets Box up ventilation area for doorframes of 2 bedrooms Replace/Relocate Electrical points Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 20, 2009 dong tu b4 reno? we starting after 7th month... mine is not up to 20k lar...lesser.. i updated the list of works on page1 liao.. dong tu is be it if fall on 7th mth? Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 dong tu is be it if fall on 7th mth? owners supposed to dong tu first?! or because they only want to dong tu b4 7month and do during 7month?! Sorry, really dunno this.. Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 To forummers who have introduced their contractors/id to me... please dont let them know yet as I plan to write an email to them but really don't have the list of emails with me... thanks Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 20, 2009 owners supposed to dong tu first?! or because they only want to dong tu b4 7month and do during 7month?! Sorry, really dunno this.. nope...for any owner who want to reno new place...will find an auspicious date to do it...(time also)...be it which month....but it up to yr personal choice de.. Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 nope...for any owner who want to reno new place...will find an auspicious date to do it...(time also)...be it which month....but it up to yr personal choice de.. ooo ok... thanks for the tip BD... I think I just go check the calendar and look bah, not wanting for find someone to calculate dates/times.. dong tu must be hack or can be simple simple like cement screed?! maybe I'll try to fill some holes I find Share this post Link to post Share on other sites
familyof4 0 Report post Posted July 20, 2009 as advised by the elders and FSM do some symbolic knocking can le... like u can tear away the cabinet door, or just hack part of the skirting also can. Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 20, 2009 ooo ok... thanks for the tip BD... I think I just go check the calendar and look bah, not wanting for find someone to calculate dates/times.. dong tu must be hack or can be simple simple like cement screed?! maybe I'll try to fill some holes I find err...there diff way to do... for mine..buy some paryer items....then burn joss stick n paper on my main hall...use hammer to break the floor tiles for all corner...bt yrs keeping floor tiles...i also dunno liao..:x Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 as advised by the elders and FSM do some symbolic knocking can le... like u can tear away the cabinet door, or just hack part of the skirting also can.cool, think will hack away one of the left over cabinet door.. err...there diff way to do... for mine..buy some paryer items....then burn joss stick n paper on my main hall...use hammer to break the floor tiles for all corner...bt yrs keeping floor tiles...i also dunno liao..:x I got no floor tiles in my living room and bedrooms, not that I'm keeping... I see what I can break then Share this post Link to post Share on other sites
Angel81 1 Report post Posted July 20, 2009 cool, think will hack away one of the left over cabinet door.. I got no floor tiles in my living room and bedrooms, not that I'm keeping... I see what I can break then Haha, break the toilet tiles if u not keeping loh. Share this post Link to post Share on other sites
merryman 0 Report post Posted July 20, 2009 Haha, break the toilet tiles if u not keeping loh. oh yea... thanks Angel.. Share this post Link to post Share on other sites
Rasp 0 Report post Posted July 20, 2009 Actually I also wanted to ask about this. What does the owner suppose to do on the 1st day of hacking? The symbolic hacking... does it mean that my hb just break one of the tiles at the kitchen, will do? No need to pray pray right? Share this post Link to post Share on other sites